Downtown Update - Liberty Sky


(Artist's rendition courtesy of Cowboy Properties) Cowboy Properties and Boyer Co. are looking to build a 24-story apartment building on the east side of State Street between
the Federal Building on 100 South and the Maverik headquarters building on 200 South. The $90 million project is being praised for its prospects of bringing more residents to downtown Salt Lake City.



February 22nd

Photo By Atlas


March 21st

Source

Quote:
Originally Posted by Atlas View Post
Some views of downtown from the 16th floor of Liberty Sky, presumably from today:



The CCH is going to make a big impact in this view, and you can also see the prospective Regent Street tower site in the foreground.






Source


April 19th

Photo By Gastroc



April 21st

Liberty Sky Foreground Right, 95 So. State Background

Photo By Orlando

.

Last edited by delts145; May 4, 2021 at 12:50 PM.
Reply With Quote
     
     
  #6802  
Old Posted Apr 25, 2021, 2:23 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - Hyatt Regency, Convention Center Hotel







Construction on the hotel started Jan. 13 and the grand opening is scheduled for October 2022.

Jason Lee for the Deseret News...Salt Lake County officials, in conjunction with Atlanta-based real estate developer Portman Holdings, broke ground Friday on the building, which the Hyatt Hotels Corp.
will manage and operate as the new Hyatt Regency Salt Lake City. The new hotel will be located at the corner of 200 South and West Temple in downtown Salt Lake City, adjacent to the Salt Palace Convention Center.

Scheduled to open in October 2022, the $377-million project will be partially financed through the Commercial Property Assessed Clean Energy program, which allows for specialty financing to enable green energy design and implementation,
a news release stated. The 700-plus room hotel will be among the first “ground-up” developments to utilize the program in the Beehive State...

...“It gives us another layer of sophistication when it comes to attracting bigger and better shows to the state of Utah that helps the entire area. Utah’s going to take a better step in terms of prominence on the national stage because of a
facility like this,” he said. “People that hadn’t considered the state before are now going to say, ‘I need to look at Utah, I need to be in Utah for these conventions.’ That’s what kind of prominence this new center is going to give us.”

The 686,784-square-foot, 26-story hotel will include 700 guest rooms and 60,000 square feet of meeting space, as well as two separate restaurants on the first and sixth floors and a lobby bar. The sixth-floor restaurant will sit adjacent to
an outdoor area with a swimming pool, as well as a 7,500-square-foot outdoor terrace for events and other activities.

The project will be directly connected to the Salt Palace Convention Center to provide convenience for convention attendees, Baisiwala said...

...“This hotel is built directly into the convention center, which makes it exceptionally easy for the convention attendees to go in and out from their hotel rooms into the convention center,” he said. “Perhaps more importantly, it has a lot
of suites — big rooms where VIPs can be housed. And it also has a lot of meeting space which augments the number of meeting rooms of the Salt Palace.”




Salt Lake City's Salt Palace Convention Center. Convention Center Hotel to rise at the far south end pictured here.

https://www.monaco-saltlakecity.com/...r-c3205e56.jpg


Note the Circular Plaza at the bottom, which was the former appearance of the plaza that has now become the construction zone of the new Convention Center Hotel

https://static1.squarespace.com/stat...55/SLC+library



August 14th


Steel Above Ground at the CCH Site

Pics By Stayinginformed



Sept 20th


Photo By Highrise_Mike



December 29th

by
Photo By DCRes, on Flickr



January 7th

Photo By Luke Garrott @ BuildingSaltLake.com Convention center hotel site, orange, center. The roof of the Salt Palace Convention Center left-center.




Salt Lake City convention hotel on track for fall 2022 opening


Estimated to cost $377-plus million, Hyatt Regency Salt Lake City is scheduled to be completed and hosting its first guests in the fall of 2022

Janurary 12th - Henry S. Johnson for Global Travel Industry News - https://eturbonews.com/2552484/salt-...-2022-opening/

One year after its groundbreaking ceremony, Salt Lake’s convention hotel — the Hyatt Regency Salt Lake City — is on schedule for completion in October 2022.

The tower concrete construction is completed through level three and the podium steel erection begins later this month. Through the first quarter of 2021, the exterior façade installation will begin, escalators on meeting room levels will be hoisted into place and the vertical construction is slated to continue to progress with topping out of the project to come at the end of this year.

“Seeing the Hyatt Regency Salt Lake City taking shape is both exciting and promising for Salt Lake’s meeting and convention future and the recovery of our visitor economy from the devastating effects of COVID-19,” said Kaitlin Eskelson, president & CEO of Visit Salt Lake.

“Our sales team will soon have everything meeting professionals want and they’re working hard to fill this new property and the many others throughout our community to ensure the long-term success of Salt Lake’s hospitality community.”




January 30th

Photo By tchild2



Quote:
Originally Posted by Pencil View Post
Downtown - Latest Hyatt Regency Convention Center Hotel Progress Videos
February 5th

Video Link


Video Link




February 22nd




Photos By Atlas



March 3rd

Quote:
Originally Posted by Atlas View Post
First signs of glass on the CCH!


Source - Posted By Atlas


March 26th




Source (and more photos) - Posted By Atlas



April 25th

Quote:
Originally Posted by RC14 View Post
Hyatt Regency, taken under an hour ago:



Photos By RC14



April 25th




Photos By Atlas

.

Last edited by delts145; May 4, 2021 at 12:04 PM.
Reply With Quote
     
     
  #6803  
Old Posted Apr 25, 2021, 4:28 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - The Worthington Project


Quote:
Originally Posted by smartdev View Post
Today I stopped in at The Peoples Coffee to grab a drink. I was speaking with an employee there and asked him if he was aware of the proposed Worthington project on that block. He told me that the developer is trying to get everyone out by the end of this month, with plans to start construction this summer and no later than this fall. He said their coffee shop is moving to 2nd and 2nd and the Tavernacle is hoping to move to The Gateway. He said everyone is disappointed in the developer because most of them signed a 5 year lease and still have 3 years on it but it looks like they will be forced out of the lease early. The employee said the development would be the cities tallest at 31 stories. However, that appears to be inaccurate based on the info we've seen so far. Sounds like at least a few of those businesses will still remain in the city.

Quote:
Originally Posted by Atlas View Post
Building Salt Lake has the scoop on the Tavernacle Tower,
which they are calling the Worthington Tower (unofficial name). 31 stories and 335 ft.






April 25th

Looking at the upcoming corner site for the Worthington Tower. Businesses in yellow building now vacating. Demolition and site prep approaching quickly.

Photo By Atlas



.

Last edited by delts145; Apr 26, 2021 at 4:36 PM.
Reply With Quote
     
     
  #6804  
Old Posted Apr 26, 2021, 4:17 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - The Exchange


Covering more than 2 acres of prime downtown real estate... The Exchange is a joint venture between Giv Development, a local development firm, and Domain Properties, a New York based real estate firm. Both organizations focus on building and enhancing the surrounding community, in addition to the physical development. It was designed by KTGY Architecture + Planning. As part of the City's Civic Campus, this mixed-use development will sit just east of the Salt Lake City Public Library. The Exchange is planned to include 216 market-rate and 196 affordable residential units, which will add much needed density to the area. The number of units will total 412 units. Current plans have more than 20,000 square feet of street-front retail space. This ground floor space will be anchored by an international food hall and marketplace in partnership with the International Rescue Committee’s Spice Kitchen business incubator program. Other notable features of the development will include “The Shop at Salt Lake City”, Domain’s innovative co-working and business accelerator platform. The 30,000-square foot space will offer amenities and programming aimed at stimulating entrepreneurship, small business development, and community engagement. The proposal highlights the use of art and green space and commitment to energy efficiency and will be a great addition to the Civic Campus.

With commission approval both phases of The Exchange move forward

Rendering of the north face of the five-story building in the Exchange development as designed by KTGY Architecture + Planning. Image courtesy Salt Lake City public documents.


Rendering of the Northwest Corner of The Exchange. Image courtesy of BuildingSaltLake.com


Rendering of the northeast corner of The Exchange. Image courtesy Salt Lake City.


Rendering of the southwest corner of The Exchange and People’s Way a city-owned private street. Image courtesy Salt Lake City.


April 15th


The Exchange project, a 412-unit mixed-income, mixed-use project by Giv Development is really taking shape on 400 South and 300 East. Photo by Luke Garrott.


The Exchange looking west, photo by Luke Garrott.



April 30th Update



Pic By Atlas



June 29th Update

Pic By Luke Garrott @ BuildingSaltLake.com



July 29th Update

Pic By Scott Harding



September 16th

Quote:
Originally Posted by scottharding View Post
Can't see it too well in this pic, but the external cladding is starting to go up on the larger building in the Exchange. The east building (right one in the picture) is looking like it might be complete and ready for occupancy around the new year.

Pic By Scott Harding



October 30th






From 400 South:




Photos By ThePalmerHouse



January 7th


Photos By Luke Garrott @ BuildingSaltLake.com At the east end of the city’s “civic campus,” the mixed-use, mixed-income, low-carbon Exchange project is starting to get its outward-facing details applied.


The Exchange from 300 E. Photo by Luke Garrott.


The Exchange from the SE. Photo by Luke Garrott.


The Exchange micro units building from the east. Photo by Luke Garrott.


The Exchange in the context of the East Central (right) and Avenues (top) neighborhoods. Photo by Luke Garrott.



April 23rd

Quote:
Originally Posted by Orlando View Post
Lots of progress since the last photo update.















Photos By Orlando



April 25th


Photo By Atlas

.

Last edited by delts145; May 29, 2021 at 12:14 PM.
Reply With Quote
     
     
  #6805  
Old Posted Apr 26, 2021, 9:20 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - Another New Tower Officially Announced - The Domain Project


Luke Garrott Reports - Full Article @ https://www.buildingsaltlake.com/new...and-400-south/

Just as their Exchange Project at Library Square shakes off its construction dust and begins to open, Domain Companies has announced a $230 million mixed-use project for a key corner in Downtown.

Say hello to Salt Lake City’s newest residential highrise – SouthWest Temple. Its 28 stories will house 340 residential units, 58,000 sf of office and/or a boutique hotel. At street level it will offer 6200 sf of retail space.

Located at 370 S West Temple, the site sits on D-1 zoning, which allows up to 375 ft on corners and higher with design review...



Renderings courtesy Solomon Cordwell Buenz Architecture. Other images Google Earth.







.
Reply With Quote
     
     
  #6806  
Old Posted Apr 27, 2021, 3:03 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - Permit Filed For Kensington


Regarding site demolition for Kensington Tower:
Quote:
Originally Posted by Schmoe View Post
I made a quick call. Apparently there were some issues getting signatures, particularly from Urban Forestry. There are a couple trees that will be taken down during the demo.

Anyway, I'm told they are trying to get it scheduled now that the path has been cleared. It will likely be either tomorrow morning or Friday morning (less possible: Monday morning). Either way, we won't have to wait too much longer.
Quote:
Originally Posted by nushiof View Post
Now there is a backhoe staged on the parking lot at Kensington.
Quote:
Originally Posted by Blah_Amazing View Post
Kensington files a site development permit. https://citizenportal.slcgov.com/Cit...howInspection=
Quote:
The scope of work for this site development permit consists of public and private utility work and associated infrastructure in the public right of way, as well as the installation of shoring, for a 372 unit, mixed-use, high-rise apartment building.

Taylor Anderson @ https://www.buildingsaltlake.com/ken...per-this-june/[/CENTER]

COVID-19 hasn’t stalled what is set to become the tallest addition to Salt Lake City’s expanding skyline...

...But in yet another sign that the Wasatch Front’s multi-family construction market will remain red hot even as the pandemic cools other markets, officials representing Kensington Tower say the billboard is temporary and they plan to break ground at 200 S. State St. in June.

The construction will bring what has been billed as the state’s tallest skyscraper, adding hundreds of high-end luxury rental apartments in the Downtown core.

“HKS recently completed design development drawings and have begun work on the construction drawings,” said Steve Brown, a representative for Kensington’s Boston-based developers. “Our current schedule shows a late June 2021 construction commencement.”

At 39 stories and over 400 feet, the Kensington Tower would inject 380 units into the core of Downtown, across from the Gallivan Center. It is one of several new high-rise projects in the pipeline for Downtown.



























Kensington Site - April 25th

Photo By Atlas


Goodbye Carl's Jr. - Kensington Site - April 26th

Webcam


April 27th

They've started excavation already on the Carl's Junior/ Kensington site.

Photo By Orlando

.

Last edited by delts145; May 4, 2021 at 1:03 PM.
Reply With Quote
     
     
  #6807  
Old Posted Apr 28, 2021, 5:34 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Quote:
Originally Posted by delts145 View Post
Update, Downtown South - Seven02 Project


With a unique name inspired by the property’s actual address, Seven O2 Main will become one of Salt Lake City’s excellent multifamily communities on the market. In addition to its unique moody design aesthetic that plays off of the O2 chemistry molecule and promotes oxygen and wellness, the project will feature luxurious amenities including a grand lobby and communal work space, two “hotel” rooms that tenants’ guests can rent on a nightly basis, a central courtyard with a bocce ball court, a spa, a cinema cardio room, an outdoor kitchen and entertaining area complete with multiple fire pits, a pickle ball/basketball court, parking for every tenant, and more.

Size : 208,718 SF - Units: 239


https://pegcompanies.com/wp-content/...-02-Main-1.png


https://pegcompanies.com/wp-content/...-O2-Main-5.png


https://pegcompanies.com/wp-content/...-O2-Main-4.png


https://pegcompanies.com/wp-content/...-O2-Main-3.png


https://pegcompanies.com/wp-content/...-O2-Main-2.png


July 28th
Note: As with many of today's downtown/central developments, Seven 02 is situated on or steps away from the light-rail lines.

Photo By RC14


August 15th


Photo By Stayinginformed



September 10th

Trax making a turn onto Main Street at 700 South. PEG Development’s Seven02 Main, center.

Photo By Luke Garrott of BuildingSaltLake.com

PEG’s Seven02 Main seen from the west, Sears Block center-right, 650 S. Main Project far left, 6th and Main Project above it, left-center.

Photo By Luke Garrott of BuildingSaltLake.com



November 28th


Photo By RC14



January 30th Foreground the 702 project, background 650 Main

Photo By tchild2


April 26th


Photo By Atlas

.

Last edited by delts145; Jun 26, 2022 at 11:40 AM.
Reply With Quote
     
     
  #6808  
Old Posted Apr 28, 2021, 4:56 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
________________________________________________________________________Downtown Update - The Moda Luxe



Isaac Riddle Reports @ https://www.buildingsaltlake.com/dev...ings-200-east/The 200 South block of 200 East is in the
middle of a significant transformation. The block is beginning attracting developers interested in its proximity to popular bars, restaurants and downtown amenities. There are currently three residential developments
either actively underway or in the planning stages. The most recent of those is the Moda Luxe, a proposed mixed-use development by JF Capital.

The Moda Luxe will be nine stories with 220 units. The project will consist of a three-story parking podium, two of which will be subterranean, below eight floors of residential. The majority of the units will be a mix of
studio, one and two bedroom apartments with four, three-bedroom penthouse units on the ninth floor.

The ground floor will house the third level of parking, the residential lobby and two restaurant-oriented commercial areas. At the second above-ground level will be most of the proposed residential amenities including
a deck and swimming pool. Additional amenities including a canopied area and dog park will occupy the roof level...


__________________________
https://i1.wp.com/www.buildingsaltla...Luxe.png?ssl=1


https://humphreys.com/wp-content/upl...2rhoihjpc0.jpg


https://humphreys.com/wp-content/upl...2rhoihjpc0.jpg



Quote:
Originally Posted by Orlando View Post
I passed by Moda Luxe yesterday and it was all fenced off and some construction workers were on site. I think they just completed demolition, and will begin excavation/shoring soon. I'll post photos soon.

April 26th


Photo By Orlando


April 27th

Photo By Atlas

.

Last edited by delts145; Sep 13, 2021 at 12:13 PM.
Reply With Quote
     
     
  #6809  
Old Posted Apr 29, 2021, 8:38 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Updates - Brinshore Developments - 255 South State


Quote:
Originally Posted by meman View Post
Another tower crane is about to enter the skyline.

I walked by the Brinshore site today and the lower part of the tower crane is in place. Looks like they are getting ready to pour the concrete for the base of the crane.

Brinshore Development of Chicago will have two attractive projects coming up for Salt Lake City in 2020 & 2021. The first to commence will be Downtown's 255 S. State and the second along the North Temple light-rail line on the
western perimeter of downtown.



The Brinshore Project - 255 South State


Copy By Luke Garrott @ BuildingSaltLake.com Senior representatives from Chicago-based Brinshore Development, one of the largest affordable housing developers in the country, according to Principal
David Brint, has briefed the Salt Lake City Redevelopment Agency (RDA) Board these past months...Brinshore’s mixed affordable and market-rate project aims to align with the goals of a 2018 RFQ from the RDA. Among those goals are
providing a significant number of “deeply affordable” units, promoting an active streetscape, establishing a public mid-block walkway, and preserving and activating the historic Cramer House on Floral Street...Instead of proposing a single
building of large scale, Brinshore’s architect, KTGY, has designed two structures. The south building will be eight floors containing 73 units and the north structure will rise to 13 stories with 117 units. 152 of the 190 total units will be
affordable, ranging from 20%-80% of AMI, with 38 units at market rate. The mix will be 122 one-bedroom, 52 two-bedroom, 13 three- and four-bedroom, with three at-grade artist live-work spaces.

On street level, the project will offer 23,000 sq. ft. of commercial space (down from 40,000 in previous plans), some of which will be dedicated to community and education purposes. The developer plans to build one level of below-grade
parking, offering 100 stalls. Eighteen surface parking spaces will be reserved for retail clients...Between the buildings will be a public “paseo.” It will run from Floral Street (an alley at about 125 East that’s accessible only from 200 South)
to State Street and align with Gallivan Avenue on the west side of State.

Pedestrians will be able to pass all the way from Edison Street (145 East) to State thanks to an existing east-west alley and the paseo.



Newly released renderings Brinshore's State Street Project











January 26th



March 4th

Photo By Atlas


Luke Garrott, BuildingSaltLake.com: ...Construction began last week on 255 South State.


City officials and developers will be delivering on a mixed-use, 80% affordable, two-tower project that incorporates significant public plazas and a midblock “paseo” between State Street and Edison (145 E). It will restore and repurpose a
historic house into a restaurant as part of the development’s 25,000 sf of retail space. The taller of the two towers (eight and 12 stories) will use an innovative construction technique, combining light structural steel with 10 levels of
load-bearing factory-panelized walls called the “Infinity System.”

The project’s 190 units will range from studios to 4-bdrms. 168 of those are federal tax credit units, serving people who make between 20-80% of AMI.

Construction is expected to take 24 months, aiming at a Spring 2023 opening. Here are some current photos of the site:



March 18th








Photos By Luke Garrott @ BuildingSaltLake.com



April 29th

Photo By Atlas

.

Last edited by delts145; May 10, 2021 at 12:51 PM.
Reply With Quote
     
     
  #6810  
Old Posted Apr 29, 2021, 1:10 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - The Patrinely - 650 Main, Project - Including updated and additional renderings

Tony Semarad for the Salt Lake Tribune - July 15th - https://www.sltrib.com/news/2020/07/...on-starts-new/ - Developers broke ground Tuesday on a 10-story office and retail project in downtown Salt Lake City, called 650 Main. The Phase I glass-clad tower at the southwest corner of Main Street and 600 South will add 332,100 square feet of high-end offices — with large floor plans, 10-foot-high ceilings and copious views — to Utah’s downtown business core, with its first phases set to be completed in early 2022. The project’s backers have a second round of construction upcoming, with an office building of similar size envisioned on adjacent land at 645 W. Temple. The Utah Transit Authority announced in April it will add a new TRAX station nearby, paid for by Salt Lake City, its redevelopment agency and the developers. The new tower has been designed by HOK, a worldwide firm headquartered in St. Louis, and its builders will reportedly aim for what’s known as LEED Gold, a high standard of energy efficiency. In addition to a spacious lobby with seating areas and about 4,600 square feet of space for retail outlets, the new tower will offer tenants an indoor fitness center with locker rooms, bike storage, a private courtyard, conference facilities and both indoor and outdoor restaurant dining. The tower is one of a half-dozen new high-rise projects proposed or under construction in Utah’s downtown core. Work on 650 Main, which has been under discussion for several years, is getting underway in spite of the pandemic after its primary backers — Houston-based developer Patrinely Group and USAA Real Estate, with home offices in San Antonio — announced in March they’d landed a major tenant for the new building.

(Rendering courtesy of Patrinely Group) Developers broke ground Tuesday on Phase I of 650 Main, a 10-story office and retail development located at the corner of Main Street and 600 South in downtown Salt Lake City.


June 9, 2020



March 11, 2020 - Enerbank Inks First Deal With 650 South Main

EnerBank USA is the first tenant to sign for space at 650 Main, a planned 10-story, 326,000-square-foot, Class A office building in downtown Salt Lake City. The bank will occupy 88,900 square feet on the top three floors, starting in early 2022.

Patrinely Group’s Dennis Tarro, along with Aaron Jones, Todd McLachlan and Roman Bernardoof with NKF represented the landlord, a partnership between Patrinely Group and USAA Real Estate. “This location will provide employees more convenient access to public transportation, while offering them excellent amenities and a productive working environment to give our customers the best service possible,” said EnerBank’s Charlie Knadler.

Construction on 650 Main will begin in spring. The property will be designed for LEED Gold certification, with floor plate sizes ranging from 40,000 square feet on the lower floors, to 29,500 square feet on the upper floors. HOK is the designer.



650 South Main


For companies focused on being truly competitive in today’s economy, workspaces have evolved to meet the demands of how the best and brightest collaborate in the workplace. 650 Main, a 10-story, 320,000-square-foot class A office building, is designed to meet these needs, providing dynamic workspaces that can benefit employee recruitment, foster innovation, and support healthy lifestyles. Building features start with oversized light-filled floorplates, tall ceiling heights, comprehensive onsite amenities, and outdoor tenant spaces. But they go on to include uniquely convenient accessibility, ample parking, onsite restaurants, and a location steps away from TRAX Salt Lake City’s light rail system. All this in the heart of downtown Salt Lake City, a city consistently recognized as one of the best in the nation for healthy lifestyles and quality of life. The result is a modern workplace that is connected to it all. 650 Main – a modern office building designed for how the next generation will work.

650 Main offers a desirable downtown location, with numerous hotels, dining, and entertainment spots nearby. Accessibility need not be sacrificed, with a three-minute drive to/from Interstate 80, a 10-minute drive to the airport, and direct accessibility to the TRAX light rail system right outside the front door. Whether it is the morning commute, a business lunch, or an evening workout, 650 Main’s location provides a world of convenient options for employees and visitors.



Rendering of the Patrinely Group Office Project looking from 600 South and Main Street. Image courtesy Salt Lake City planning documents.






September 10th

This used to be a parking lot. 650 S Main site. Photo by Luke Garrott.


650 S Main site, center. 6th and Main, right center. Photo by Luke Garrott.

Photos By Luke Garrott Of - https://www.buildingsaltlake.com/in-...uction-update/



January 19, 2021
Construction site on the left, The 650 Main Project

(Francisco Kjolseth | The Salt Lake Tribune)



February 22nd

Photo By Atlas



February 24th

Photo By Taylor Anderson of BuildingSaltLake.com



Updated & Additional Renderings






Night View from the Northeast at the intersection of 600 South and Main Street



Aerial View of both phases of the project.



Night View from the southeastern corner of the building on Main Street



Day View from the southeastern corner of the building on Main Street



Active Courtyard



Social Courtyard



Courtyard Layout



Indoor/Outdoor Fitness Center



Lobby - Sitting Area



Lobby - Front Desk



High-Tech Conference Center



Ground Level Floor Plan



Building Section




March 22nd


Photo By Atlas



April 28th




Photo By Atlas


.

Last edited by delts145; May 24, 2021 at 11:01 AM.
Reply With Quote
     
     
  #6811  
Old Posted Apr 29, 2021, 1:39 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - The '6th and Main' Project


6th & Main is a mixed-use development sitting at the gateway intersection of 600 South and Main Street in downtown Salt Lake City. It consists of 175 units and 10,100 sf of retail within an 8-story type III over type I structure.
Residential amenities include a street level lounge, co-working business center, fitness center, pool, spa, and an indoor/outdoor roof terrace with sweeping views of Downtown Salt Lake City and beyond.




MVE Architects - https://www.mve-architects.com/wp-co..._6th-Main3.jpg



July 28th


Photo By RC14



September 10th

Same aerials as previous post of the Patrinely Project. The 6th and Main Project pictured to the right of Patrinely.


650 S Main and 6th and Main, bottom, Downtown, center. Photo by Luke Garrott.

Photos By Luke Garrott Of - https://www.buildingsaltlake.com/in-...uction-update/



October 30th

Photo By ThePalmerHouse



December 21st

Photo By RC14


January 19th

Red Crane on the right, 6th and Main Project

(Francisco Kjolseth | The Salt Lake Tribune)


April, 2021


Source



April 28th


Photo By Atlas

.
Reply With Quote
     
     
  #6812  
Old Posted Apr 30, 2021, 1:40 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - Timeline, April - January - The Birdie Apartments


Quote:
Originally Posted by scottharding View Post

...There are now full construction crews at work on the Birdie site as well...
Quote:
Originally Posted by berger4 View Post
The site for "The Birdie" on 2nd and 2nd has a backhoe and work is being done on the parking lot...

Isaac Riddle Reports @ https://www.buildingsaltlake.com/com...town-building/ The Birdie, will be six stories with 70 residential units. The Birdie will top
out at just under 85 feet, 15 feet under the minimum height requirement of 100 feet for corner parcels in the D-1 (Central Business District) zoning district. The project will replace a surface parking lot on 0.34 acres.

Planning staff determined that the intent of the zoning requirements was to ensure that corner buildings have prominence at the intersection. Staff argued that The Birdie would have prominence based on its planned ground floor
activation, large balconies and architectural relationship to the intersection’s two historic buildings, the Stratford Hotel (2nd and 2nd) building and First Methodist Episcopal Church.

“I feel like 2nd and 2nd is a really important corner,” said Jake Williams of CW Urban. “We really wanted to be inspired by the neighborhood. These buildings all have eclectic textures.”

Williams told the commission that CW Urban wanted The Birdie to compliment the mix of historic and contemporary buildings in the area. To do this, the project will have dark-framed windows that are common on this stretch of
200 South. The ground floor will also be visually different from the upper levels with a lighter shade of concrete to create a greater emphasis on the street level features and different building materials.



https://i1.wp.com/www.buildingsaltla...rdie.png?ssl=1


https://i0.wp.com/www.buildingsaltla...ie-2.png?ssl=1

Pre Construction site. Always great to get rid of those Downtown surface parking lots!

https://i1.wp.com/www.buildingsaltla...View.png?ssl=1


April 5th Update

Quote:
Originally Posted by SLC PopPunk View Post
Got out and snapped some photos of projects around where I live.



June 20th Update

Pics By SLCPopPunk


September 12th


Photo By SLCPopPunk



October 30th


Photos By ThePalmerHouse


January 7th

In east Downtown, the 200 South food + beverage scene will see a new influx of residents with The Birdie, at 200 East.


The Birdie, center-right, getting framed. Liberty Sky, center-left, next to the red-striped Maverik building. 95 S State, center-top. Photo by Luke Garrott.


The Birdie, center-right. Liberty Sky, upper left.

Photos By Photos by Luke Garrott of BuildingSaltLake.com


April 21st

Photo By Orlando


April 25th

Photo By Atlas

.

Last edited by delts145; May 31, 2021 at 2:43 PM.
Reply With Quote
     
     
  #6813  
Old Posted Apr 30, 2021, 1:53 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update, The West Quarter, Phase I & II

Quote:
Originally Posted by Makid View Post
Sounds like Phase 2 for The West Quarter, may be moving faster than originally thought.

From the original plan, I think they were looking to have RWP clearing out in early 2022. With it happening around May 2021, this could mean that the overall timing has sped up.

I do think it would be nice to have 3+ projects undergoing excavation at the same time. It is this that probably lead to the speed up of Phase 2. This will allow the current workers to shift from Phase 1 to Phase 2.

I do wonder how many towers we will see continue above the Phase 2 podium. Will we see all 3 towers, just the Residential and Hotel, or just the Residential. Pre-Covid, the plan was for the Residential and the Hotel to go up immediately and the Commercial tower to be added once demand was there. Does anyone know if this is still the plan or if we may see all 3 towers rise simultaneously?

Quote:
Originally Posted by Atlas View Post
Very exciting to see West Quarter Phase II going forward. Walking from Main Street along 200 S, Block 67 feels so impenetrable right now. It's really going to be a nice urban gateway to the Vivint Arena when it's done, not to mention it may have a massive impact on the skyline. Right now, SLC doesn't have any towers that are more than a block or so from Main Street...


By Tony Semerad, The Salt Lake Tribunehttps://www.sltrib.com/news/2019/12/...city-approves/

Salt Lake City has approved a way to pump $15 million into building a huge subterranean parking garage for Block 67, an upcoming ambitious residential and hotel project on the western edge of the city’s downtown.

The agreement, backed Tuesday by the City Council in its role overseeing the city’s Redevelopment Agency (RDA), clears a major hurdle for what is to be known as The West Quarter, a 6.45-acre development bounded by
100 South and 200 South from 200 West to 300 West.



(Rendering by The Ritchie Group) A rendering of The Ritchie Group's proposed Block 67 development in Salt Lake City, as though looking north along 300 West...



Developers with Salt Lake City-based The Ritchie Group and Garn Development Co. in Layton plan to build more than 650 dwellings, two hotels, an office tower, retail shops, a tree-lined street cut through the block and an underground
parking garage with more than 1,200 stalls.


With its four towers and extensive amenities, to be built in two phases, The West Quarter project will push the center of the city’s urban core west, with more robust pedestrian connections between the existing downtown and The Gateway and
Vivint Smart Home Arena farther west.

“It really is a good project,” Councilman Charlie Luke said Tuesday. “It really is going to do a lot for the city and especially for that part of the city in terms of redevelopment."...

...Ryan Ritchie, a principal in The Ritchie Group, has said the underground parking garage is integral to the project’s overall financial success...The loan agreement sets up a legal mechanism for the city to give the developers the $15 million in
money for the parking garage, then lets the developers pay it back over time as their project generates additional tax money. Salt Lake City’s RDA will, in turn, pass those payments back to the county...



Additional Renderings of Block 67 - Subterranean garage to serve both Phases I and Phase II


Quote:
Originally Posted by meman View Post
December 5th - Construction fencing is going up around the West Quarter site today!!

Looks like another big project is imminent!!
Jacobsen is partnering with The Ritchie Group and Garn Development to build Phase I of The Block 67 Project. The West Quarter, a multi-use development that will help define the emerging sports and entertainment district in downtown Salt Lake City.
The project — adjacent to Vivint Smart Home Arena — will feature more than 650 residential units, a mid-block street with access to 200 South and 300 West, and a subterranean parking garage. The scope of work also includes more than
100,000 square feet of retail space, 430,000 square feet of office space and a 271-room hotel.





Quote:
Originally Posted by ajiuO View Post
The cranes seemed to pop out of nowhere quick.
Quote:
Originally Posted by Makid View Post
The view from the 6th North bridge is amazing. The cranes look so far away from Main Street even though they are only 2 blocks.

I can't wait for the 2 CCH cranes to also go up. 6 tower cranes up and working From State Street to 3rd West and South Temple to 2nd South.

My wife did point out to me today as we drove around downtown that there are many work trucks from out of state license plats at the various projects. I thought that this was nice in that we are pulling workers from other states for our projects.



May 31st


Photo By StayingInformed



June 29th

The West End project by Ritchie Group at 251 W 100 S is getting footings after installing two main cranes. Its first phase will add residential, hospitality, and hotel capacity around the Utah Jazz arena.

Photo By Luke Garrott @ https://www.buildingsaltlake.com/in-...tinues-to-pop/



July 29th

Pic By Scott Harding



August 28th

Photo By Atlas



December 23rd

Photo By Atlas



January 7, 2021


West Quarter project, left center. Photo by Luke Garrott.


Peeking into the West Quarter site. Photo by Luke Garrott.


The West Quarter’s south crane. Convention center hotel site, center top.
Photos By Luke Garrott of BuildingSaltLake.com



February 22nd

Photo By Atlas



April 12th

Here are some shots of the West Quarter from April 12th, found on Twitter. These are starting to make a big impact!






Photos Provided By Atlas - found on Twitter


April 25th



Site of the upcoming portion of Phase II of the West Quarter. Taken pre-demolition

Photos By Atlas


Updated Design of Hotel Portion of Phase I


Quote:
Originally Posted by Atlas View Post
The next planning commission meeting will discuss proposed changes to the West Quarter development. Most of it seems to be related to the appearance of the hotel portion of the project. Details and renderings (more in the document linked above):
Quote:
The West Quarter project challenges the typical 10‐acre Salt Lake City block by proposing a development centered around a new through mid‐block street, resting on a below grade parking garage. The midblock
street will break down the large block scale and provide a pedestrian connection between the Downtown on 200 South and Gateway District on 300 West. The mid‐block street will be lined with retail on both sides creating an active urban environment that is focused more on pedestrian activity
while reducing vehicular traffic.

Due to the large size of our city blocks, the existing grade of our streets and sidewalks changes deceivingly across the block frontage as well as from one block to another. The existing grade along 300 West block changes by approximately 10’‐0”, approximately half of which takes place across the project frontage. Similarly, the grade continues to change along 200 South block frontage and 200 West creating three different elevations that the mid‐street and the service alley will connect and reconcile. From that perspective the project needed to prioritize the grade elevations and their transition to maximize accessibility and street activation without making modifications to the existing streets.

300 West is a State road operated by the Utah Department of Transportation (UDOT) and is subject to UDOT regulations. The existing street elevation along 300 West (between the new mid‐block street and entrance to the hotel port cochere) varies between 4272.96 at the south end and 4276.30 at the north end. The hotel ground level elevation has been set at 4278 to maximize accessibility and engagement with the new mid‐block street. The grade changes and complex relationship between the existing and new mid‐block street required the design of the 300 West frontage to be reevaluated subsequently to the Planning Commission approval.
And it turns out SLC will have at least one rooftop dining and drinking experience soon! I still hope to see something higher and closer to Main Street eventually. This one seems to have a mostly northwestern-facing orientation too, so the views of downtown and the Wasatch won't be dominant.


Quote:
The current design maintains a rooftop bar along 300 West that will contribute to street and skyline activation in accordance with the city design standards and approved design. The refined building massing creates a distinct rooftop element articulated with recessed glazing, expressed columns and a continuous architectural roofline. The roofline terminates at the northwest corner of the building with a long and dramatic cantilever that, along with the glass volume below, announces the entrance to the
development. The distinct roofline will be illuminated with continuous, linear fixtures to maintain its presence and distinct expression on the night skyline while the wood clad soffit will diffuse the lighting
and create a floating effect.

In addition to the rooftop bar, that will activate the northwest corner and create a strong connection with the Vivint Smart Home Arena, the current design will provide street and skyline activation at the opposite southeast corner of the hotel. An outdoor pool deck, with views of the downtown skyline and mountains, will create additional active uses along the future extension of the mid‐block street. In addition to enhancing and connecting the second project phase, the pool deck will be visible and create a strong connection with 200 South.


.

Last edited by delts145; Jun 15, 2021 at 11:55 PM.
Reply With Quote
     
     
  #6814  
Old Posted May 1, 2021, 1:50 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Update, Sugar House District - Latest ABIDrone Flyover - April 28th, 2021 - The 40 Park Avenue Construction

The Sugar House District : https://www.youtube.com/watch?v=ckwcrjp45gc


Sugar House Park

https://i.pinimg.com/originals/e9/ca...6ce0a255d4.jpg



Across the street from Sugar House Park is this enthusiastically welcomed development. Formerly the giant parking lot of the big-box retailer Shopko, now an exciting addition to Salt Lake City's booming urban density redevelopment.
We all love getting rid of big-box old-style parking lots. Both the 80 and 60 Park Ave. structures are now completed. The 40 Park structure is progressing rapidly as you can see in the ABIDrone flyover


https://redirectdigital.com/wp-conte...rk_ave_slc.jpg


Under Construction - Updated Rendering - The 1240 Park Avenue Apartments

The updated rendering, showing front changes. They've also added an additional floor. This updated rendering was released a little over a month ago.

https://www.connect.media/wp-content...dering-SLC.jpg




Park Avenue Developments

The buildings are replacing 9 acres of underutilized land near the heart of Sugar House. There are two new east-to-west streets to the north and south of the
development that will connect Highland Drive to 1300 East. The development will also include two new north to south throughways connecting Ashton to Stringham.



Aerial of projects as seen from the I-80 and 1300 East Interchange


Rendering of the clock tower looking southwest from Stringham Avenue. Image courtesy Dixon Architects.



Sugar House - Crede Residential Launch Development - https://www.connect.media/crede-cott...ent-on-slc-mf/

Irvine, CA-headquartered CREDE broke ground on Park Avenue Apartments, a 238-unit multifamily complex in Salt Lake City’s Sugar House community. Developed in partnership with Salt Lake City-based Cottonwood Residential, the project is set for a Q4 2021 delivery.

CREDE’s Colby Durnin says, “Park Avenue Apartments will provide highly desirable apartments in the burgeoning Sugar House area. The economic growth of Utah and Salt Lake City in particular, have led to a strong need for new residential options, as more companies relocate or open offices in Salt Lake City.”

The mid-rise 238-unit project will offer studio, one and two-bedroom apartment homes. Each unit will include nine-foot ceilings, luxury vinyl wood plank flooring, upgraded cabinetry and stone countertops, with most units having a balcony or patio. The building will also feature 1,400 square feet of retail space, a fitness center, and a resort-style pool with an outdoor terrace that includes fire pits, barbecues and two hot tubs.



April 25th


Photo By Atlas

.

Last edited by delts145; Jun 8, 2021 at 12:35 AM.
Reply With Quote
     
     
  #6815  
Old Posted May 1, 2021, 1:59 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Downtown Update - Latest Aerial Drone Flyover - The Broadway Cottonwood Apartments


Broadway Apartments - ABIDroneFlight - Site Progress Orbit - April 23rd - https://www.youtube.com/watch?v=d_xaSDUti-s

Renderings, Cottonwood Broadway Apartments


PROJECT DATA
Located on the east side Salt Lake City’s vibrant downtown and iconic buildings like the Salt Lake City Public Library, the Leonardo Museum, and Salt Palace Convention Center, Cottonwood Broadway is well positioned to give residents access
to all that the City has to offer. The Studio PBA project consists of one 7-story building, with units ranging from studios to 2-bedrooms. Residents will have covered parking options located on the first two floors of the building, while the
top 5 floors are reserved for amenities and residential units. The contemporary building design provides sweeping views of the Wasatch Range from the roof top pool and residences, an expansive multi-level fitness center, and other amenity
spaces such as a cyber cafe, mail center, and full service leasing center with conference rooms.


MORE ABOUT THE PROJECT
Client: Cottonwood Residential
Completion: 2021
Units / Density: 256 Units / 148 DU/ACRE
Program: Multi-Family Residential



200 South Street Engagement

https://i0.wp.com/www.buildingsaltla...4%2C1042&ssl=1




Quote:
Originally Posted by SLC PopPunk View Post
I walked by there the other day and saw a development company banner up and thought something may be happening soon. That Makes The Birdie, The Exchange, The Broadway,
The Magnolia and the nearly complete Quattro all going up in just a couple blocks of each other.

Plus The Morton is about 1/3 full and Moda Luxe appears to preparing the buildings for demo in the near future. Lots of infill in that area.
Quote:
Originally Posted by delts145 View Post
That's fantastic for downtown density's sake to have so many new feet on the ground. I know what a huge difference it makes having witnessed the seemingly sudden transformation of downtown L.A. these
past ten years. All of the new mid-rise and high-rise residential has transformed downtown Los Angeles from partially dead at night and on weekends to incredibly vibrant and full of activity both days and evenings, especially on weekends.

300 South Street Engagement

Studio PBA for Cottonwood Development - http://www.studiopba.com/cottonwood-broadway-apartments

.

Last edited by delts145; Jun 8, 2021 at 12:21 AM.
Reply With Quote
     
     
  #6816  
Old Posted May 1, 2021, 11:50 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Sugar House District Update - The Sugarmont


Original Copy By Isaac Riddle @ BuildingSaltLake.com - The Sugarmont Apartments residential project to be completed in the Sugar House Business District will be one of the largest residential projects
in the Sugar House District. Boulder Ventures’ eight-story 352-unit project is now scheduled to open in June 2021. The project replaced the former Granite Furniture warehouses. The first phase of this project, 2100 Sugarhouse,
saw the conversion of the former Granite Furniture showroom into smaller retail spaces.

This large residential project will contain a mix of 34 studio apartments, 206 one-bedrooms, 93 two-bedrooms and 19 three-bedroom townhome units. The project’s two buildings sit between Elm Avenue and Sugarmont Drive along
McClelland Street. The project wraps around a parcel on the southwest corner of Elm Avenue and Highland Drive.




Update: The project is in the late stages with finishing work now occurring outside and inside the structure. Big D Construction is now in full construction mode with 110 construction workers on site, mostly working on the interior spaces.
They are projecting Phase I occupancy to be in early Fall with total completion in about fifteen months.
Periodic lane closures, particularly north bound McClelland, may still occur as large trucks baring materials enter or leave the work site. Flagmen will be on hand to assist traffic on these occasions. As part of the last phases of the project
the SE McClelland Street frontage will undergo some improvements that will include re-paving, curb & gutter replacement, and a raised crosswalk at the McClelland/Sugarmont intersection. This work now looks to be taking place early to
mid-July.

- Completion: First phase, fall 2020; complete summer 2021.



August

Quote:
Originally Posted by Atlas View Post
Regarding the Sugarmont, some of the exterior covering has been coming off lately and the building looks largely finished underneath. Next time I am over there, I will snap a photo.

Photo By Scott Harding


August 28th

...the coverings on the northeast side are coming down. The parts that are still covered seemed like they were still unfinished...

Photo By Atlas



December 5th

Photo By Stayinginformed


December



Photos By Luke Garrott of BuildingSaltLake.com



April 25th



Photos By Atlas



Update - Additional Renderings Released















.

Last edited by delts145; Sep 27, 2021 at 10:30 PM.
Reply With Quote
     
     
  #6817  
Old Posted May 1, 2021, 12:07 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Sugar House District Update, Sugar Alley Residences

Sugar Alley is a 186-Unit mixed-use development located in Salt Lake City’s prestigious Sugarhouse District. Class A amenities will be accompanied with 17,332 square feet of ground floor retail.


Rendering of the Eastern side of Sugar Alley as seen from Highland Drive. If you look in the upper right corner, you can see their other proposed project, Dixon Place.


Rendering of the Eastern side of Sugar Alley as seen from Highland Drive.


Rendering of the Eastern side of Sugar Alley as seen from Highland Drive and the corner of the soon to be continued Wilmington Ave (will separate Sugarmont Apartments and Sugar Alley).
I like that they included the Sugarmont Apartments in the background of this image.



Rendering of the Sugar Alley 'Residences at Sugar Alley' entry/ lobby interior for the apartments.


Rendering of the Sugar Alley 'Residences at Sugar Alley' entry/ lobby for the apartments. East side as seen from Highland Drive.


Rendering of the Sugar Alley pedestrian walkway and street cafes/ restaurants separating Sugar Alley and 'The Vue at Sugar House Crossing.' Northeast corner of Sugar Alley as seen from Highland Drive.


Rendering of the Sugar Alley pedestrian walkway and street cafes/ restaurants separating Sugar Alley and 'The Vue at Sugar House Crossing.' Northwest corner of Sugar Alley.


This is a map from the Dixon Building project, which is being built across the street from the Sugarmont Project. So replace the 'Dixon Building' with the new Sugar Alley project.
I thought it might help people 'get their bearings,' so to speak. The 'proposed apartment building' in the upper left side is the under-construction Sugarmont Apartment building.



https://media-exp1.licdn.com/dms/ima...hw6vMUbXiwxKUo



Note: The 'Sugarmont' under construction in the background, which is also neighboring to the 'Dixon Place' and the 'Sugar Alley'.
A lot of units in various stages of planning and construction will be coming online for the Sugar House District. Among these three projects alone the total is 545 units.






https://www.kier.org/our-work/multi-...-apartments-2/


March 21st


Photo By Atlas


April 25th



Sugarmont to the left and Sugar Alley on the right





Photos By Atlas

.

Last edited by delts145; May 16, 2021 at 12:58 PM.
Reply With Quote
     
     
  #6818  
Old Posted May 2, 2021, 2:59 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Update - Historic Inner City - Neighborhood Density Infill


Quote:
Originally Posted by Blah_Amazing View Post
https://citizenportal.slcgov.com/Cit...howInspection=

Address: 850 S Jefferson Street



An interesting small project has filed Planned Development documents with the city this week.

From what I can tell, the project will take a property currently occupied by 1 single family house. It will keep that house, build a second single family house to the south and behind both build 3 townhouses.






Renderings






It will be interesting to see if the project is successful, since it could become a unique model for greater density on similar properties.

.
Reply With Quote
     
     
  #6819  
Old Posted May 3, 2021, 11:41 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Update, Central City East



Quote:
Originally Posted by Blah_Amazing View Post
https://citizenportal.slcgov.com/Cit...howInspection=

Address - 144 S 500 E

Project Description:


I actually personally had no idea this project was planned.

I found a SLC RDA PDF for affordable housing that included the project.
PROJECT SUMMARY:


DEVELOPER SUMMARY:








.
Reply With Quote
     
     
  #6820  
Old Posted May 3, 2021, 11:47 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,583
Salt Lake City & MSA/CSA Rundown


Quote:
Originally Posted by Blah_Amazing View Post
So with Alta Terra getting proposed recently, I thought I would make another one of these project collages for the Sugar House Neighborhood...

Note: since Dixon Place is now accepting tenants, I chose to leave it out since it is now considered 'completed.'




.

Last edited by delts145; Jul 2, 2021 at 12:12 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 6:48 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.