Construction on Block 8 (Rem Koolhaas / OMA with Fougeron Architecture), with 222 Second in the background. Nasty off-ramp is finally closed for good.
View down Folsom, the future neighborhood commercial corridor of Transbay / Rincon Hill... Patiently waiting for Jeanne Gang's design for Block 1.
Block 6, "Solaire" (SCB). This one is also rising quite fast. The basic form of the adjacent Mercy Housing mid-rise looks to be complete as well.
399 Fremont. Was surprised at how fast this was rising. In contrast, there doesn't seem to be much progress on 325 Fremont at all.
340 Fremont. Core is above street level.