Quote:
Originally Posted by MonctonRad
The post preceding this one mentions employing 200 people. These 200 people are construction workers. The 700 people will be permanent research employees and scientists.
|
Note that these aren't 700 new jobs, that number includes the approximately 400 current DFO employees based at the existing Gulf Fisheries Centre, and the relocation of other employees from the greater Moncton area (e.g. Transport Canada, ECCC, and NRC). A fair number (likely the majority) of these won't be strictly researchers or scientists.
The construction is being done in stages with two main buildings that will ultimately be attached. The first (which is currently being worked on) will contain mostly labs, while the second and larger building will include "offices" and related spaces, and will be built on a footprint including the existing building. First building is currently scheduled to be completed (I think) in 2027, at which point some DFO employees will move into the labs while the remainder move to a "swing space" in downtown Moncton. At that point, the existing building will be mostly dismantled while the second stage proceeds. Expected completion is now (I think) 2032.
(I might be wrong on some of the dates, as they keep shifting and it's hard to keep track)