From this morning:
They were sweeping that part of the slab clean and then building what I assume is a workspace to assemble stuff. That area with the plywood is now past the small container in the middle and the near container has been moved to the opposite side of the crane.
Will be interesting to see what next week brings!
Also, work continues on the TNSE patio space above the walkway.