  #41  
Old Posted Jun 1, 2019, 10:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Looks like they moved it to behind Lowes and they also started taking down the crane off Sunningdale near Adelaide.

Quote:
Originally Posted by jammer139 View Post
Tower crane is now gone. Will Drewlo move it behind Lowes or to the Talbot St project next?
Reply With Quote
     
     
  #42  
Old Posted Jun 9, 2019, 3:23 AM
tyeman200's Avatar
tyeman200 tyeman200 is offline
Registered User
 
Join Date: Sep 2014
Posts: 381
Quote:
Originally Posted by MolsonExport View Post
my neighbourhood has been 12 years of this. twelve fucking long years.
That sucks, I go to 1030 coronation monthly and I hate driving there with all that construction, couldn't imagine having to live near it.
Reply With Quote
     
     
  #43  
Old Posted Jun 9, 2019, 4:33 AM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,922
Quote:
Originally Posted by tyeman200 View Post
That sucks, I go to 1030 coronation monthly and I hate driving there with all that construction, couldn't imagine having to live near it.
Incredible how slow this one is going. For instance, go back over the comments to jammer's comment from October 2017. So basically predicting finish by spring a year ago. Yet here we are a year later. I swear Tricar is going to have people living in 40 York before this thing is occupied lol

Quote:
Originally Posted by jammer139 View Post

On the bright side they should be topping out this 12s in another 5 months given the pace of progress. The site will be cleaned up by end of spring.
Reply With Quote
     
     
  #44  
Old Posted Jun 9, 2019, 12:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Your right Drewlo has been extremely slow with this build. Also their 2 buildings up on Sunningdale near Adelaide. Not sure why they take so long compared to other builders.
Reply With Quote
     
     
  #45  
Old Posted Aug 10, 2019, 11:05 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Hard to believe that they are still forming for the ground level slab pour on the parking level on the east side?

They were doing some grading on the west side for landscaping. Exterior work still needed for the balconies and windows.
Reply With Quote
     
     
  #46  
Old Posted Oct 27, 2019, 8:53 PM
tyeman200's Avatar
tyeman200 tyeman200 is offline
Registered User
 
Join Date: Sep 2014
Posts: 381
Quote:
Originally Posted by jammer139 View Post
Hard to believe that they are still forming for the ground level slab pour on the parking level on the east side?

They were doing some grading on the west side for landscaping. Exterior work still needed for the balconies and windows.
No, I think they might be adding a second tower. If I know Drewlo, they like to build their buildings in pairs.
Reply With Quote
     
     
  #47  
Old Posted Oct 28, 2019, 7:28 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
You might be right. Recall seeing a plan for another tower in that area. If it does go ahead and the 3 other 12s proposed at the intersection there will be six 12s towers in that area. Would not be a bad spot for a grocery store opposite the TSC store.



Quote:
Originally Posted by tyeman200 View Post
No, I think they might be adding a second tower. If I know Drewlo, they like to build their buildings in pairs.
Reply With Quote
     
     
  #48  
Old Posted Nov 27, 2019, 2:41 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
They have started renting it seems.
https://www.drewloholdings.com/apart...e-place/london


Wonder how well they will do? Will no doubt impact schedule for next building and the other 3 buildings planned for Hyde Park and Gainsborough.


Old Oak is well underway now on tower 3 a little further north.



So is there demand for all these units up in Hyde Park area?
Reply With Quote
     
     
  #49  
Old Posted Jan 17, 2020, 7:58 PM
Ellensparky Ellensparky is offline
Registered User
 
Join Date: Jun 2019
Posts: 18
Any updates on this build?
Reply With Quote
     
     
  #50  
Old Posted Jan 18, 2020, 4:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
They have tenants and been renting for months now.
Reply With Quote
     
     
  #51  
Old Posted Mar 8, 2022, 8:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Looks like Drewlo is preparing the base of the tower crane immediately to the east of the first building. The pit was excavated and some of the L1 walls were poured when the first 12s building went up. Would expect the new building to be a clone of the first 12 floor building which took forever to get built. With their Edgevalley low rise buildings and the 16s on Talbot I would expect their thin construction crews to be even thinner and take even longer to make any progress.
Reply With Quote
     
     
  #52  
Old Posted Mar 11, 2022, 4:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Tower crane nearly setup. Appears to be shorter then the building to the west so may not be 12 floors after all.

Last edited by jammer139; Mar 12, 2022 at 3:43 PM.
Reply With Quote
     
     
  #53  
Old Posted Mar 29, 2022, 2:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
3 excavators on site now digging out the pit.
Reply With Quote
     
     
  #54  
Old Posted Mar 29, 2022, 5:12 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 46,476
the pit has been an open sore for nearly 8 years now. I live nearby.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #55  
Old Posted Apr 10, 2022, 4:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Making progress forming and setting the steel rebar for the floating raft slab in bottom of the pit.
Reply With Quote
     
     
  #56  
Old Posted Apr 15, 2022, 10:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Still installing the steel rebar for the floating raft slab.
Reply With Quote
     
     
  #57  
Old Posted Apr 21, 2022, 4:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Looks like the steel rebar for the floating raft slab is complete. Should see the concrete pump trucks and a parade of concrete trucks as soon as a good weather day permits. Of note the street address is 300 South Carriage Rd.
Reply With Quote
     
     
  #58  
Old Posted Apr 28, 2022, 2:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
The floating raft slab has now been poured.
Reply With Quote
     
     
  #59  
Old Posted Jun 4, 2022, 3:11 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Have started forming a few of the L1 walls on top of the floating raft slab. Progress as usual with a Drewlo work site = slow.
Reply With Quote
     
     
  #60  
Old Posted Jun 25, 2022, 7:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
They have made very little progress on the L1 level. Appears to be stalled. Suspect Drewlo may be rotating their concrete forming crew between this building and their Talbot St building and their Edgevalley Rd building.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 12:14 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.