Quote:
Originally Posted by Matthew
Do you know if 210 Trade is canceled?
|
Indefinitely on hold, along with the plans for the former Wachovia condo tower, and The Park.
What is going forward includes the NC Dance Theater, 12 floor UNCC building, in addition to those already under construction, which includes 1 Bank of America, the Vue, and Duke Energy Center. Catalyst and 440 South Church have already topped out, along with the Ritz Carlton.
What may move forward in the next year or so? Encore tower & Carolina Theater, and a rumor about the revival of plans for 300 South Tryon.