HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


Reply

 
Thread Tools Display Modes
     
     
  #41  
Old Posted Nov 12, 2023, 8:37 PM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: Los Angeles
Posts: 9,129
We can move to under construction as soon as foundation work on the actual building begins, but not for adjacent sites.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
Reply With Quote
     
     
  #42  
Old Posted Dec 3, 2023, 2:27 PM
DrewByTheBay DrewByTheBay is offline
Registered User
 
Join Date: Apr 2021
Posts: 4




[/url]
Reply With Quote
     
     
  #43  
Old Posted Dec 4, 2023, 3:23 PM
WildCowboy WildCowboy is offline
Registered User
 
Join Date: Aug 2007
Posts: 527
Not gonna miss that Langley Porter building. Gonna be quite the transformation.
Reply With Quote
     
     
  #44  
Old Posted Jan 2, 2024, 7:38 AM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
Quote:
Demolition Underway For UC Parnassus Heights Hospital And Research Building

BY: ANDREW NELSON 5:30 AM ON JANUARY 1, 2024

Demolition and excavation work is underway for two major projects in the UCSF Parnassus Heights campus in San Francisco. Crews finished removing the seven-story UC Hall, and only a corner of the four-story ​​Mental Health Services building remains as of our visit. The sites are expected to be transformed into a research building and hospital, with both scheduled to finish by 2028 and 2030, respectively.

The two developments are part of the UC Parnassus Heights campus expansion plan. The third project includes improvements to the two Health Science Instruction and Research towers.

...

The New Hospital Parnassus Heights will rise at 401 Parnassus Avenue next to the existing Hospital at 505 Parnassus Avenue. The eye-catching 15-story tower is designed by Herzog & de Meuron, with HDR as the architect of record. The terracotta-clad building will feature an asymmetrical tripart layout. The podium will be wrapped with fluted panels and horizontal window bands. The next four curtain-wall-clad floors will be setback from the podium, making way for a landscaped open space with ivy climbing up the thin four-story columns. Crowning the hospital with be six levels with stepped terraces facing east and west.

The 1.5 million square foot structure will increase the campus’s bed capacity to 682 beds, create 71 emergency department bays, add a new ICU facility, and produce rooms for general and specialized patient care.
https://sfyimby.com/2024/01/demoliti...-building.html
Reply With Quote
     
     
  #45  
Old Posted Jan 2, 2024, 7:39 AM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
Reply With Quote
     
     
  #46  
Old Posted Jan 2, 2024, 7:44 AM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
Reply With Quote
     
     
  #47  
Old Posted Jan 2, 2024, 8:51 PM
OneRinconHill OneRinconHill is offline
Registered User
 
Join Date: Nov 2010
Posts: 165
Quote:
Originally Posted by homebucket View Post
Now THAT is going to stand out (and all the UCSF buildings already do as it is).
Reply With Quote
     
     
  #48  
Old Posted Jan 2, 2024, 8:56 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
Quote:
Originally Posted by OneRinconHill View Post
Now THAT is going to stand out (and all the UCSF buildings already do as it is).
Agreed. It will be the flagship, both medically and architecturally, of all the hospitals in California.
Reply With Quote
     
     
  #49  
Old Posted Jan 3, 2024, 12:52 AM
Charmy2 Charmy2 is offline
Registered User
 
Join Date: Jan 2022
Location: San Francisco
Posts: 368
Walked down Stanyan today and saw UCSF in the distance, spent like 10 minutes imagining it among the cluster of UCSF buildings. Considering Hayes Point is on hold, Mission Rock is almost done, and no other huge projects are breaking ground anytime soon, this one is getting me really excited! Gonna make a great addition to the cityscape.
Reply With Quote
     
     
  #50  
Old Posted Feb 3, 2024, 2:23 PM
DrewByTheBay DrewByTheBay is offline
Registered User
 
Join Date: Apr 2021
Posts: 4
Reply With Quote
     
     
  #51  
Old Posted Jun 10, 2024, 3:24 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
A construction update on this one.

A reminder of the specs:
- 15 floors, 294 ft
- ~1 million sq ft of usable space
- 324 patient beds

The site:
https://maps.app.goo.gl/1iWBDuTHyUqfatVY6

Quote:
Construction Underway For $4.3 Billion UCSF Parnassus Heights Expansion, San Francisco



BY: ANDREW NELSON 5:30 AM ON JUNE 10, 2024

Construction has started for the $4.3 billion UCSF Parnassus Heights Hospital expansion in San Francisco. The official groundbreaking ceremony was held over a month ago, and foundation work is now underway. Once complete, the 15-story medical center will offer hundreds of new patient beds and care units.

...

Our last site visit at the start of this year showed that the demolition of the former Langley Porter Psychiatric Hospital was nearly complete as crews prepared the site for construction. The official groundbreaking ceremony was held in late April, with House Speaker Emerita Nancy Pelosi, California Lieutenant Governor Eleni Kounalakis, and Mayor London Breed in attendance. Foundation work is moving along now, with two construction cranes and two foundation drilling rigs spotted on-site last week. The hospital is expected to open by 2030.

The rising 15-story structure is designed by Herzog & de Meuron, with HDR as the architect of the record. The terracotta-clad tower will come together like an asymmetrical wedding cake, with a fluted-panel base at the bottom, a four-story middle of curtain-wall glass, and a top layer of stepped terraces with seven floors of patient care units. From the top, patients and employees will be able to see the other major project by Herzog & de Meuron, the twisting copper-clad de Young Museum in Golden Gate Park.
https://sfyimby.com/2024/06/construc...francisco.html
Reply With Quote
     
     
  #52  
Old Posted Jun 10, 2024, 3:30 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
The updated renderings. Very minor changes. Glad it looks mostly the same with no obvious value engineering.









https://sfyimby.com/2024/06/construc...francisco.html
Reply With Quote
     
     
  #53  
Old Posted Jun 10, 2024, 3:31 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,167
Reply With Quote
     
     
  #54  
Old Posted Jun 11, 2024, 2:51 PM
obemearg obemearg is offline
Registered User
 
Join Date: Sep 2021
Location: NYC / San Francisco
Posts: 129
I noticed the renderings on the H&dM site as well as a recent blog post about the ground breaking from UCSF show different renderings from the ones above now with green tile and a few other changes. I wonder which ones are the most up to date? I personally really like the green.









I downsized the images a bit but the full size renders are on the H&dM site + some more angles.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 8:42 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.