Quote:
Originally Posted by flipper316
Couple of corrections. Don't think Highway 1 east of 208th is getting any upgrades. Yes, evenutally there's going to be a new interchange at 216th with the HOV lanes extended from 208th to 216th. As far as anything east to Chilliwack with the way the BC government drags their heels on road infrastructure I doubt we'll see anything done in our lifetimes.
Highway 99 south of 91, again I doubt we'll see anything done in our lifetimes. Stuck with an outdated 4 lane "freeway" Shame too because the money the're spending on the bridge and 99 upgrades wasn't that the same cost for the Port Mann and Highway 1 upgrade from the Cassiar to 208th?
|
Just because it hasn't been announced publicly, doesn't mean it isn't coming relatively soon. Projects in BC are done differently than many places because of the potential political consequences. Rebuilding Highway 1 to Abbotsford is happening, but it won't be all in one shot. Think of the 216 Street project as phase 2. Phase 1 was the recent section that included a new overpass at 248 Street. Expect the interchanges at 232 Street and 264 Street to be rebuilt sooner than later. If they did it as one big project, it would be risky politically because the public generally wants equal transit and roads spending. The government is already getting grilled on under-funding transit.
Also just because something is only four lanes, doesn't mean it's not a freeway... Anyways, every new interchange and overpass built south of the 91 (on Highway 99) is designed to accomodate at least six lanes. All that's left is for King George Boulevard and 152 Street are rebuilt. Expect that to happen shortly after the current project is complete.
Quote:
Originally Posted by flipper316
And last correction, I wouldn't call GEW a freeway stub since it has traffic lights on it.
|
I'm talking about the main section from 192 Street to Lougheed Highway.
Quote:
Originally Posted by craner
Awesome news! Finally!! This is long overdue.
What I can't understand is why it's not ready to go to tender tomorrow ?
Instead we have to wait till 2019 before work starts.
|
The Provincial government likes to line significant milestones up with elections, so it probably has to do with the construction timing in 2021 (next election year).