Quote:
Originally Posted by Aylmer
Why not just a single-tracked DMU line beside/on the railway which runs beside Deerfoot Trail? Even with two or three stops on the way, you could probably build it on the cheap and provide 15-20 minute headways and a 20-minute trip from downtown Calgary to the Airport.
If Edmonton goes ahead with a new central railway station (as was planned with HSR, no?), they could do the same with Leduc airport.
|
It is a better plan in Calgary. The freight rail is both on the side of Deerfoot and on the main line is very well used and would require more tracks to make it work.
If high speed is done you would just share that track.
Right now the province/Edmonton has a big decision to make about maintaining the rail approach to the southside of downtown (CP is moving some of its yards out of the city). Otherwise, the approach would be a roundabout from the northeast following the LRT.
Edmonton is convinced that LRT to the airport would be better. Though it would be super slow compared to taxi or a business express. The issue hasn't really been studied in either city, and transit administration in Calgary has been slowly weaning planning away from an airport link.