Quote:
Originally Posted by factis
Anyone know how often do they have do it? Pretty sure they had that one closed down within the last 7 or 8 years.
|
There’s different amounts of rework that might be done at different times.
I think last time it was 13/31 that was done. I think it’s been 15 to 20 since 18/36 was done.
18/36 resurfacing is less disruptive than 13/31, because the portion where they intersect gets redone as part of 13/31. It is done that way because 18/36 is longer, but while the intersection is done 18/36 is shortened and can limit payload.