HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #541  
Old Posted May 9, 2010, 11:49 AM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by Yume-sama View Post
... but even in Edmonton when I took the LRT after a game there was heavy police presence at the station, and everyone was very well behaved...
According to what I gleaned from my Sports Sociology textbook, I did manage to do some light reading during my undergrad, having a heavy police presence might be counter-productive. I think it followed the logic that people, especially the would-be troublemakers, start to feel intimidated or agitated and as a consequence might act out. Nonetheless, they do need to have a recognizable presence.
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz
     
     
  #542  
Old Posted May 9, 2010, 2:15 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Hey frink, while you compose the permanent front page you post the CTrain thread I made for SSC if you'd like. Here it is:


Source: Wikipedia.org


Info

General
Location: Calgary, Canada
Opened: 25 May 1981
Operator: Calgary Transit
Type: Light Rail/Rapid Transit

Stats
Length: 48.8km
Number of Lines: 3
Number of Stations: 37
Daily Ridership: 266,100

Technical
Gauge: Standard
Powered By: Electricity
Power Source: Overhead Wires
Rolling Stock: Siemens-Duewag U2 + Siemens SD-160

Lines
201 - Somerset/Bridlewood-Crowfoot
202 - McKnight/Westwinds-City Centre

Pictures

Source: Surrealplaces@flickr


Source: calgary.ca


Source: Floating Imitations@flickr


Source: Wikipedia.org


Source: The Chemist@skyscraperpage


Source:Surrealplaces@skyscraperpage


Source:Surrealplaces@skyscraperpage


Source:Surrealplaces@skyscraperpage


Source:Surrealplaces@skyscraperpage


Source: Surrealplaces@skyscraperpage


Current Development

West LRT
Length: 8km
Number of Stations: 6
Category: Line Expansion
Targeted Completion Date: 2012

NELRT Extension
Length: 2.9km
Number of Stations: 2
Category: Line Extension
Targeted Completion Date: 2012

NWLRT Extension
Length: 2.5km
Number of Stations: 1
Category: Line Extension
Targeted Completion Date: 2014

7th Avenue Transit Mall Refurbishment
Length: 0.0km
Number of Stations: -1*
Category: Line Refurbishment
Targeted Completion Date: 2012

*Due to station twinning there will be a net reduction in stations.


Future Development

Downtown Subway
Length: TBD
Number of Stations: 5
Category: Line Movement
Targeted Completion Date: 2017

SELRT
Length: TBD
Number of Stations: 10
Category: Brand New Line
Targeted Completion Date: 2023

NCLRT
Length: TBD
Number of Stations: 10*
Category: Brand New Line
Targeted Completion Date: TBD

*Subject to change.
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz

Last edited by Riise; May 10, 2010 at 6:47 PM. Reason: Removed Quoting Code To Prevent Double Quotation
     
     
  #543  
Old Posted May 9, 2010, 3:04 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:48 AM.
     
     
  #544  
Old Posted May 9, 2010, 4:31 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by Riise View Post
According to what I gleaned from my Sports Sociology textbook, I did manage to do some light reading during my undergrad, having a heavy police presence might be counter-productive. I think it followed the logic that people, especially the would-be troublemakers, start to feel intimidated or agitated and as a consequence might act out. Nonetheless, they do need to have a recognizable presence.
Quite true. You definitely don't want TOO much of a presence, and like I said earlier, you don't want them trying to crack down on every minor thing.

Coupla kids swear a bit on the LRT? Let it slide, even if our stupid laws technically say that's illegal. Coupla guys start shoving each other into other passengers? That's when you do something.

PS: that LRT map above says 2012 for Tuscany station.
     
     
  #545  
Old Posted May 10, 2010, 12:38 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:49 AM.
     
     
  #546  
Old Posted May 10, 2010, 4:06 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by Riise View Post
Hey frink, while you compose the permanent front page you post the CTrain thread I made for SSC if you'd like. Here it is:
Wow 2012 is going to be an epic LRT year. (assuming the world doesn't end )
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #547  
Old Posted May 10, 2010, 6:12 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:49 AM.
     
     
  #548  
Old Posted May 10, 2010, 6:46 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by frinkprof View Post
^Thanks Riise. Didn't know you were a member at SSC. I'll use that for now, with credit of course. Just need the code. Either take it out of the quotes in your above post, or PM me the code. Thanks.
Your welcome. For the most part I only lurk on SSP as Calgary does not have that big of a presence there, but with the larger international audience I though I'd provide something I know a little bit about. I'll remove the double quotation from my earlier post so you can grab the code from it.
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz
     
     
  #549  
Old Posted May 11, 2010, 6:11 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
City of Calgary News Blog, (May 10, 2010), Construction on 7th Ave LRT Enters Final Phase

Video Link
     
     
  #550  
Old Posted May 11, 2010, 6:39 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Thanks for posting that. Interesting to hear the tidbit about the 8th ave subway, though did I hear correct that they want it to be 5 car?
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #551  
Old Posted May 11, 2010, 6:45 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:50 AM.
     
     
  #552  
Old Posted May 11, 2010, 7:15 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by frinkprof View Post
^Yup. 5 car platforms for 8th Avenue Subway. Makes sense. You would hate to build 4 cars and then 15 or 20 years later realize you need to expand to 5 cars, or put a new line in there that will be 5 car capacity, etc. See the Canada Line in Vancouver.
Then why, why oh why, are they upgrading to 4 cars now on the NW/S line instead of 5?
     
     
  #553  
Old Posted May 11, 2010, 8:39 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by fusili View Post
Then why, why oh why, are they upgrading to 4 cars now on the NW/S line instead of 5?
Waaaaay cheaper to go from 4 to 5 on the aboveground stations compared to underground.

To be honest I'm happy they're not over-expanding. It won't be used for years, and it just confuses people. Even right now on 7th Ave, people often don't know where the train is gonna stop. Imagine with 5 car platforms.
     
     
  #554  
Old Posted May 11, 2010, 8:44 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:50 AM.
     
     
  #555  
Old Posted May 11, 2010, 8:44 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by freeweed View Post
Waaaaay cheaper to go from 4 to 5 on the aboveground stations compared to underground.

To be honest I'm happy they're not over-expanding. It won't be used for years, and it just confuses people. Even right now on 7th Ave, people often don't know where the train is gonna stop. Imagine with 5 car platforms.
My concern is not so much over construction timing, but on station design. Will they be redesigning stations so they can accommodate 5 cars. I know places like Lion's Park, SAIT and Sunnyside will have issues with 5 car trains, not sure about the South line. They will not necessarily have to build the full platform length, but they will have to ensure that expansion is possible in the future. I am not sure they are currently doing this. If the plan is for 5 car expansion in the future, they should be doing this now.
     
     
  #556  
Old Posted May 11, 2010, 8:45 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:51 AM.
     
     
  #557  
Old Posted May 11, 2010, 9:06 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by fusili View Post
My concern is not so much over construction timing, but on station design. Will they be redesigning stations so they can accommodate 5 cars. I know places like Lion's Park, SAIT and Sunnyside will have issues with 5 car trains, not sure about the South line. They will not necessarily have to build the full platform length, but they will have to ensure that expansion is possible in the future. I am not sure they are currently doing this. If the plan is for 5 car expansion in the future, they should be doing this now.
Ah, good point. If they AREN'T planning for 5 cars within 20 years, they're complete idiots. I'm just spoiled with the newer NW stations, with them it's just a matter of extending a concrete apron so I always assume it's a trivial thing. Hadn't really thought about the stations themselves hindering expansion.
     
     
  #558  
Old Posted May 11, 2010, 9:21 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 6:52 AM.
     
     
  #559  
Old Posted May 11, 2010, 9:32 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by frinkprof View Post
Question for regular transit (specifically LRT) commuters during the past 4 years or so. I'm involved in a discussion of transit on another forum. When asked about pet peeves, one person responded with this:



Then, in response to someone's desire for 5 minute headways at all times of the day, the same person responded with this:



Now, is it just me or is this way off base? Not saying delays don't occur, but nearly every day, for 20+ minutes? Maybe during the work-to-rule situation in 2007? Passing out on trains? Is that a common occurance?

Now, I used to take the train every day (and I do mean every single day), but that was some time ago, so I'm just wondering if I can hear some thoughts from people who do so currently.
I know a girl who takes the 301 to work (our BRT). She says in bad weather it is consistently 20 minutes late. Ridiculous for a supposed rapid transit system.
     
     
  #560  
Old Posted May 11, 2010, 9:43 PM
bigcanuck bigcanuck is offline
Registered User
 
Join Date: Jun 2005
Posts: 1,278
Quote:
Originally Posted by fusili View Post
I know a girl who takes the 301 to work (our BRT). She says in bad weather it is consistently 20 minutes late. Ridiculous for a supposed rapid transit system.
I take the 301 during rush hour from the west side of the city - I have for over 1 year (and for at least 2 out of the past 3 years). I can probably count on 1 hand the number of times I had to wait more than 15 minutes for the 301 - even during the harshest winter storms this year. I can recall one of the massive Friday afternoon storms we had last November (December?) where leaving downtown I had to wait about 30 minutes - I ended up hopping on a 101 and walking to my car since I figured it was better to simply get out of the core than wait it out.

I have no complaints with the 301. It's rapid enough for me.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:33 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.