View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #5301  
Old Posted Mar 5, 2013, 3:14 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,614
The question in whether, absent VGH and central Broadway commuters, the 99 B-Line service from Arbutus would be sufficient to meet UBC demand in the interim until the line is completed all the way to UBC. There would be efficiencies added by a terminus at Arbutus over the existing service - with a terminus at Arbutus, the return trip would be shorter for buses, so the bus fleet could cycle faster (as the south of Fraser buses do into Bridgeport Station versus their former routing into downtown Vancouver), the most traffic congested (slowest) part of the 99 B-Line route is eliminated - Central Broadway - and the number of stops would be reduced.

The Millennium Line replaced the part of the 99 B-Line from Lougheed Mall to Broadway & Commercial Station - extending the Millennium Line to Arbutus and again shortening the B-Line would be the next natural step, as planned by the circa 1999 Millennium Line plans.
     
     
  #5302  
Old Posted Mar 5, 2013, 5:12 AM
YVR Bruce YVR Bruce is offline
Registered User
 
Join Date: Nov 2011
Posts: 79
Staged Broadway development

What about launching twin TBMs westward, pausing somewhere like the southwest corner of B'way at Macdonald to cut in a new load-out. That way the eastern sections could be freed up for completion while the same TBM equipment is in place for the onward run. You get to complete & open a major section while the basics are dealt with for the western half of the run - without much of the costs cited for the 3 phased alternative.

A great opportunity for something like this was missed at the large ex-IGA liquor store plot at Arbutus, where a re-activated Marpole line could have even acted as a route out for the spoils. The landowners could have been rewarded with another "1.0 FSR" as bonus rent for the project landuse.
     
     
  #5303  
Old Posted Mar 5, 2013, 7:03 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Even a partial extension to Arbutus has the potential to remove a huge amount of 99-related pass-ups, at least in the westbound direction. Boarding UBC riders onto the 99 will no longer share with Central-Broadway bound riders, who would have already gotten off the train.
     
     
  #5304  
Old Posted Mar 5, 2013, 7:24 AM
Alon Alon is offline
Registered User
 
Join Date: Aug 2012
Posts: 219
UBC peaks differently from Central Broadway. Central Broadway has a smooth peak around start of work. UBC has a series of sharp peaks before the hour. When I board the 84 at 9:20, getting to campus around 9:35, there are seats. When I try to board at 9:35, the bus is completely full as do all subsequent buses that make the 10 am class.

Tellingly, the biggest source of passups on the 99 is not Commercial, but Cambie. It's Canada Line riders trying to get to UBC (and not Central Broadway, since the biggest job cluster is within walking distance of Cambie).

On top of that, I've read somewhere else in this forum that a majority of 99 riders ride all the way to the end. People hop on and off at Cambie on buses that are not timed to the UBC peak, but on buses that are, Cambie is just another set of origins for people going to UBC.
     
     
  #5305  
Old Posted Mar 5, 2013, 8:40 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,614
I think the biggest VGH stop would be at Willow/Heather (and several office towers near there) rather than Cambie.

City Hall is probably the biggest employer at Cambie (including space in the former VanCity Building at 10th and at Crossroads), but we all know that City Hall has a huge parkade for its employees at City Square (formerly free, pay parking since 2009).

The biggest single office tower on the corridor may be the TransMountain Building (1333 W Broadway) which is closer to Granville (and there's the Vancouver School Board and Bentall office tower at Granville.

Quote:
Originally Posted by YVR Bruce View Post
What about launching twin TBMs westward, pausing somewhere like the southwest corner of B'way at Macdonald to cut in a new load-out. That way the eastern sections could be freed up for completion while the same TBM equipment is in place for the onward run. You get to complete & open a major section while the basics are dealt with for the western half of the run - without much of the costs cited for the 3 phased alternative.

A great opportunity for something like this was missed at the large ex-IGA liquor store plot at Arbutus, where a re-activated Marpole line could have even acted as a route out for the spoils. The landowners could have been rewarded with another "1.0 FSR" as bonus rent for the project landuse.
Connaught Park is at 10th & Vine 2 blocks west of Arbutus - a temporary staging area and TBM / spoil extraction site could be built there.

http://www.bing.com/maps/Default.aspx?en...OTcxNjMwNjU4JTdlLTEyMy4xNzY3Nzk3NDcwMDk=
     
     
  #5306  
Old Posted Mar 5, 2013, 10:17 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,045
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Above all else, let's please begin this westward expansion by connecting the M-Line to the Canada Line.
     
     
  #5307  
Old Posted Mar 5, 2013, 10:29 PM
itinerant's Avatar
itinerant itinerant is offline
Registered User
 
Join Date: Jan 2008
Location: Vancouver
Posts: 230
Quote:
Originally Posted by officedweller View Post

Connaught Park is at 10th & Vine 2 blocks west of Arbutus - a temporary staging area and TBM / spoil extraction site could be built there.
How big does the extraction/staging site need to be? Why not consider the Rogers store at NE corner of Arbutus and Broadway and vacant plot immediately behind it, and adjacent rail ROW for this purpose? Together these are a fairly large chunk of property that is less impacting don't you think?
     
     
  #5308  
Old Posted Mar 6, 2013, 12:30 AM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,504
Please forgive the question, but is it confirmed that they would send the "Broadway" tunnel down 10th, and not 8th? This might have been stated previously, but couldn't find confirmation either way.
     
     
  #5309  
Old Posted Mar 6, 2013, 12:46 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by s211 View Post
Please forgive the question, but is it confirmed that they would send the "Broadway" tunnel down 10th, and not 8th? This might have been stated previously, but couldn't find confirmation either way.
I don't think anything has been 'confirmed', but in previous postings here there is an argument against using 8th Ave because of the sewer main trunk that runs under 8th Ave.

I recall reading here that there were some anxious engineers when the Canada Line construction had to cross over the trunk at 8th Ave.


As for using a 10th Ave alignment, my primary argument is that any disruption at the street level will be less painful to people living/ working/ driving on 10th Ave vs. the greater pain of the same street disruptions on Broadway.

Also, using 10th Ave from Kingsgate Mall (Kingsway / Main St / Broadway) means there isn't an expensive jog (and corresponding slow-down in trains) to get the line moved one block from Alma/Broadway to Alma/10th.
     
     
  #5310  
Old Posted Mar 6, 2013, 12:49 AM
Alon Alon is offline
Registered User
 
Join Date: Aug 2012
Posts: 219
The flip side about Broadway vs. 10th is that it adds a minute of station access time to everyone on and north of Broadway (i.e. most users).

I wonder, is 9.5th an option?
     
     
  #5311  
Old Posted Mar 6, 2013, 1:01 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by itinerant View Post
How big does the extraction/staging site need to be? Why not consider the Rogers store at NE corner of Arbutus and Broadway and vacant plot immediately behind it, and adjacent rail ROW for this purpose? Together these are a fairly large chunk of property that is less impacting don't you think?
Google maps still has the Canada Line Olympic Village Station shown under construction. Before the station was constructed, the construction box was previously used for assembling the TBM machine and beginning each of the TBM tunnels that go under False Creek, Davie St and Granville St to Waterfront Station. The rest of the site west to Ash Street was the marshalling yard for the parts needed to build the TBM tunnels (primarily the ring segments) and dumping the tunnel spoils into waiting dump-trucks.

The space west of Olympic Station was re-paved and turned back into a parking lot when the Canada Line opened.

At the 20M zoom level, you can switch between the older overhead construction-site view and the newer parking-lot view.

Useless Trivia: This station has the round TBM tunnels on the north end and the square 'cut n cover' box tunnels on the south end.
     
     
  #5312  
Old Posted Mar 6, 2013, 1:05 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Alon View Post
The flip side about Broadway vs. 10th is that it adds a minute of station access time to everyone on and north of Broadway (i.e. most users).

I wonder, is 9.5th an option?
Oh, the First World HORRORS we have living here.

Coming from the north side of Broadway, you'll probably spend more time waiting for the pedestrian WALK light.
     
     
  #5313  
Old Posted Mar 6, 2013, 1:06 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,614
Unless they stack, the alley is probably too narrow, and the alley is also probably more important for building access than 10th Ave would be.

Yes, there's a GVRD trunk sewer under 8th Ave - that's a no-go.

It's not really much farther in than Broadway City Hall Station and provides lateral circulation room:





http://forum.skyscraperpage.com/showthread.php?t=129009
     
     
  #5314  
Old Posted Mar 6, 2013, 1:16 AM
Alon Alon is offline
Registered User
 
Join Date: Aug 2012
Posts: 219
Quote:
Originally Posted by jsbertram View Post
Oh, the First World HORRORS we have living here.

Coming from the north side of Broadway, you'll probably spend more time waiting for the pedestrian WALK light.
A minute's a minute, regardless of whether it's train travel time or station access time.
     
     
  #5315  
Old Posted Mar 6, 2013, 1:21 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,614
That's getting into minutae. Then what you really need to do is compare the time it would take to switch back several times down escalators and be delayed behind escalator standees if the station were under Broadway versus walking in a straight line down a wide corridor (and it generally wouldn't take a full minute to walk the extra distance except for seniors, and they aren't generally concerned about time).

It also represents the frame of mind of jaywalkers, red light runners, etc.
     
     
  #5316  
Old Posted Mar 6, 2013, 4:10 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Preaching to the choir ...

     
     
  #5317  
Old Posted Mar 6, 2013, 4:46 AM
CBeats CBeats is offline
Registered User
 
Join Date: Mar 2009
Posts: 422
It's been released - yay!
     
     
  #5318  
Old Posted Mar 6, 2013, 4:58 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,045
Quote:
Originally Posted by jsbertram View Post

If the rrt subway option is the preferred option, then it's clear: let's do it, for all the cited reasons.
If not, and there is bickering about expense (important, I admit), then there will surely be another thousand sessions of "here we go the mulberry bush"
all over again.
Meanwhile the whole project may get severely set back.
I hope not, since the Broadway line would complete the "backbone" of the system, and there will always be opportunity to expand later
     
     
  #5319  
Old Posted Mar 6, 2013, 5:22 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,946
They still have LRT at grade on the list, wish they would drop it.

It is either RRT the entire length or Combo 1, not extending the M-Line at least to Cambie would be an incredible mistake.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #5320  
Old Posted Mar 6, 2013, 6:10 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,157
These new figures with a partially tunneled LRT indicate a per km cost of 166 million vs 230 million for RRT = 64 million less per km for underground LRT. Did I miss something or is undergound LRT that much cheaper to build?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.