Old Posted Jul 6, 2013, 6:58 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
It's so efficient! say the transit planners and accountants who drive in private autos to and from their place of work.
The solution of course is to require everybody in the OC upper echelons to take OC. Hell, make the whole city council do it too.
Reply With Quote
     
     
  #5262  
Old Posted Jul 6, 2013, 12:40 PM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Quote:
Originally Posted by lrt's friend View Post
It also demonstrated that crush loading buses is an inefficient way to deliver transit service. Crush loading slow downs service dramatically.
Frankly, I would rather get on a crush-loaded bus than wait 30 mins to an hr for the next bus with ample space. At least then I can take a nap leaning against a pole knowing that I don't have to be alert enough to wave the driver down in case he/she misses my stop.
Reply With Quote
     
     
  #5263  
Old Posted Jul 7, 2013, 6:06 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by Buggys View Post
Frankly, I would rather get on a crush-loaded bus than wait 30 mins to an hr for the next bus with ample space. At least then I can take a nap leaning against a pole knowing that I don't have to be alert enough to wave the driver down in case he/she misses my stop.
I'd rather that not be the only options available.

Even some very frequent buses get crush-loaded. You don't need to wait 30 minutes; in four minutes another crush-loaded one will be along.
Reply With Quote
     
     
  #5264  
Old Posted Jul 7, 2013, 3:30 PM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by Uhuniau View Post
I'd rather that not be the only options available.

Even some very frequent buses get crush-loaded. You don't need to wait 30 minutes; in four minutes another crush-loaded one will be along.
That's how the #12 is sometimes. Doesn't help when they assign 40 footers on that route in rush hour.
Reply With Quote
     
     
  #5265  
Old Posted Jul 8, 2013, 3:05 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Doesn't help when they assign 40 footers on that route in rush hour.
And yet they put artics on rural routes to Vars. (I'm not joking. Look at a 232 trip next time you're downtown at rush hour).
Reply With Quote
     
     
  #5266  
Old Posted Jul 8, 2013, 4:05 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by 1overcosc View Post
And yet they put artics on rural routes to Vars. (I'm not joking. Look at a 232 trip next time you're downtown at rush hour).
Those routes can get surprisingly full, although the Vars run is probably the least used.
Reply With Quote
     
     
  #5267  
Old Posted Jul 8, 2013, 5:11 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
Quote:
Originally Posted by Buggys View Post
Frankly, I would rather get on a crush-loaded bus than wait 30 mins to an hr for the next bus with ample space. At least then I can take a nap leaning against a pole knowing that I don't have to be alert enough to wave the driver down in case he/she misses my stop.
In this case, the bus was to the point that there was no choice. The bus just drove by people because there was no room. The problem was that there was not enough buses to meet the demand at that particular time. I don't think you would be taking a nap with people yelling at each other.
Reply With Quote
     
     
  #5268  
Old Posted Jul 8, 2013, 5:22 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,573
City and airport authority study possibilities for rail link

By David Reevely, OTTAWA CITIZEN July 8, 2013 1:06 PM


OTTAWA — The Ottawa airport authority and the city government are studying the best way to extend rail service to the Macdonald-Cartier International Airport.

The $227,000 study is to be finished in September and its results included in the city’s “transportation master plan,” the long-range vision for billions of dollars of road, rail, bus and cycling projects, said Jeff Byrne, the city’s chief procurement officer. The existence of the study, being carried out by transportation consulting firm Delcan, is revealed in a quarterly report on dozens of normally routine contracts let by senior city officials without running them past city council.

The city and the airport authority, which asked for the study, are splitting the cost, Byrne said. Delcan is the city’s favourite firm for rail planning, doing the primary work for both the first phase of rail, which is beginning construction now, and its western extension to Baseline station.

“It’s really sort of a high level study looking at aligning our planning effort with the city’s,” explained Michael Crockatt, the airport’s vice-president of business development. The airport is satisfied for now with its transit connection, the end of the line for the No. 97 Transitway bus, but its own long-range plan calls for the airport to become a hub of commerce and government employment and it’ll need better service for that to work.

Although the current O-Train line ends quite a bit farther north at Greenboro, the tracks it uses run right past the airport and beyond to south Gloucester. The city’s plans call for that line to be developed and, eventually, converted to the same electric light-rail technology it’s installing downtown.

The airport’s master plan includes a spur extending from the existing track to the terminal, though spurs that short can be difficult to integrate into regular rail service. One of the reasons the city rejects Carling Avenue as a route for a western extension of the first light-rail line is that it would leave Tunney’s Pasture hanging off by itself on the end of a spur, confusing riders about which trains end up where and how frequently. That’s likely the sort of problem that Delcan’s work is meant to resolve.

“We’ve always contemplated some sort of transit — rail transit — connection to the airport,” Crockatt said, though the study doesn’t prejudge anything. “It could be everything from different rail technologies to bus technology. We don’t know what the outcomes are going to be.”

Don’t get too excited about the prospect of taking a train to catch a flight soon, though. It took Toronto 20 years and eventually the promise of the Pan-Am Games to begin building a rail link from downtown to Pearson International Airport.

“I don’t think there’s going to be anything imminent that comes out of it,” Crockatt said.

[email protected]

ottawacitizen.com/greaterottawa
© Copyright (c) The Ottawa Citizen
http://www.ottawacitizen.com/news/City+a...ssibilities+rail+link/8630253/story.html
Reply With Quote
     
     
  #5269  
Old Posted Jul 8, 2013, 6:38 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
Quote:
One of the reasons the city rejects Carling Avenue as a route for a western extension of the first light-rail line is that it would leave Tunney’s Pasture hanging off by itself on the end of a spur, confusing riders about which trains end up where and how frequently. That’s likely the sort of problem that Delcan’s work is meant to resolve.
Naturally, I said it all along that the Tunney's Pasture terminus was predetermining the western extension route.
Reply With Quote
     
     
  #5270  
Old Posted Jul 8, 2013, 6:43 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by rocketphish View Post
City and airport authority study possibilities for rail link

By David Reevely, OTTAWA CITIZEN July 8, 2013 1:06 PM


OTTAWA — The Ottawa airport authority and the city government are studying the best way to extend rail service to the Macdonald-Cartier International Airport.

The $227,000 study is to be finished in September and its results included in the city’s “transportation master plan,” the long-range vision for billions of dollars of road, rail, bus and cycling projects, said Jeff Byrne, the city’s chief procurement officer. The existence of the study, being carried out by transportation consulting firm Delcan, is revealed in a quarterly report on dozens of normally routine contracts let by senior city officials without running them past city council.

The city and the airport authority, which asked for the study, are splitting the cost, Byrne said. Delcan is the city’s favourite firm for rail planning, doing the primary work for both the first phase of rail, which is beginning construction now, and its western extension to Baseline station.

“It’s really sort of a high level study looking at aligning our planning effort with the city’s,” explained Michael Crockatt, the airport’s vice-president of business development. The airport is satisfied for now with its transit connection, the end of the line for the No. 97 Transitway bus, but its own long-range plan calls for the airport to become a hub of commerce and government employment and it’ll need better service for that to work.

Although the current O-Train line ends quite a bit farther north at Greenboro, the tracks it uses run right past the airport and beyond to south Gloucester. The city’s plans call for that line to be developed and, eventually, converted to the same electric light-rail technology it’s installing downtown.

The airport’s master plan includes a spur extending from the existing track to the terminal, though spurs that short can be difficult to integrate into regular rail service. One of the reasons the city rejects Carling Avenue as a route for a western extension of the first light-rail line is that it would leave Tunney’s Pasture hanging off by itself on the end of a spur, confusing riders about which trains end up where and how frequently. That’s likely the sort of problem that Delcan’s work is meant to resolve.

“We’ve always contemplated some sort of transit — rail transit — connection to the airport,” Crockatt said, though the study doesn’t prejudge anything. “It could be everything from different rail technologies to bus technology. We don’t know what the outcomes are going to be.”

Don’t get too excited about the prospect of taking a train to catch a flight soon, though. It took Toronto 20 years and eventually the promise of the Pan-Am Games to begin building a rail link from downtown to Pearson International Airport.

“I don’t think there’s going to be anything imminent that comes out of it,” Crockatt said.

[email protected]

ottawacitizen.com/greaterottawa
© Copyright (c) The Ottawa Citizen
http://www.ottawacitizen.com/news/City+a...ssibilities+rail+link/8630253/story.html
If the airport terminal was on the east side, it would be a whole lot easier. I can think of 4 possibilities:

1) A dedicated air-bus or air-train from a station at Lester Road to the airport terminal, running every few minutes. It requires a transfer though, even if only a brief one.

2) A spur route, splitting service in half at Lester Road (similar to Vancouver). Problem is that there is likely to be far more ridership south of the airport at the ultimate stage so that could create peak-period imbalances. Spurs don't work too well with imbalanced ridership as the frequency would be tough to manage. Also it forces a transfer for those coming from the south to the airport (low ridership now but likely to increase).

3) A quasi-loop routing, run it to the airport, under the terminal, then back towards Leitrim Road. Much of that would have to be underground though and an existing corridor is pretty much wasted. But it keeps everything on a single line.

4) A direct connection from the airport terminal, diagonally, to Riverside South. Again, that is underground, and also skips Leitrim Road (a potential valuable connection) completely as well. It does improve the situation for those in Riverside South as it provides a quicker route into town.

My preference: Option 3, if it is cost-effective. Otherwise, I would go for Option 1.

One final note - I believe initially it is best to connect it to the O-Train corridor (hopefully extended to Gatineau). Ultimately though, the O-Train should be detached again and the airport/Riverside South route connected to the Bank Street underground corridor that many of us suggest on here.
Reply With Quote
     
     
  #5271  
Old Posted Jul 8, 2013, 11:46 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by Capital Shaun View Post
That's how the #12 is sometimes. Doesn't help when they assign 40 footers on that route in rush hour.
You mis-spelled "all the friggin' time".
Reply With Quote
     
     
  #5272  
Old Posted Jul 9, 2013, 12:33 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by lrt's friend View Post
Naturally, I said it all along that the Tunney's Pasture terminus was predetermining the western extension route.
Really the route of the western extension was effectively predetermined thirty+ years ago when the decision was taken to build the Scott St. trench for the West Transitway.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #5273  
Old Posted Jul 9, 2013, 1:05 AM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by uhuniau View Post
you mis-spelled "all the friggin' time".
lol
Reply With Quote
     
     
  #5274  
Old Posted Jul 9, 2013, 1:44 AM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Quote:
Originally Posted by lrt's friend View Post
In this case, the bus was to the point that there was no choice. The bus just drove by people because there was no room. The problem was that there was not enough buses to meet the demand at that particular time. I don't think you would be taking a nap with people yelling at each other.
Lol, ok no nap then. Yeah, both being on such a super packed bus AND having to wait at the stop longer are crappy options.

I'd still lean towards getting sardined than wait though. I want to get to my destination sooner rather than later, dammit!

Last edited by Buggys; Jul 9, 2013 at 1:55 AM.
Reply With Quote
     
     
  #5275  
Old Posted Jul 9, 2013, 2:12 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
This came from another discussion.

Quote:
Originally Posted by J. Will View Post
I believe "rail bias" is a myth. People care primarily about speed and service frequency (especially for commuting, where hours of operation are less of a concern for most). If people aren't using bus routes in a city that are slow and/or infrequent, it's likely they aren't using them BECAUSE they are slow and/or infrequent (of course the worse combination is slow AND infrequent), not because they are buses.
From my experiences in the last week, it seems that Ottawa City Council, the Transit Commission and OC Transpo are not assessing their decisions as to whether they are getting people to their destinations faster. We are embarking on a multi-billion dollar investment but are we going to be really moving people faster? Are the changes that we have made and are going to make to the bus network going to help? The service changes that were made in the last couple of years were touted to straighten routes to speed up service but really for every route that was made more direct, more routes were made more convoluted. The decisions to use more high capacity buses is reducing frequency and slowing service because of more frequent stopping. I experienced this big time last night.

We see all kinds of reports about service delivery but strictly relates to on-time performance. We see origin-destination surveys. But really what is more important than anything else, is the time a customer takes to get from his or her starting point to his or her destination. Why are we not seeing any assessment of this nature? In my own case, service delivery speed continues to deteriorate. If you really want people to use transit, we need to move people faster whether by train or bus. All the other assessments are secondary.
Reply With Quote
     
     
  #5276  
Old Posted Jul 9, 2013, 6:46 PM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
Quote:
Originally Posted by lrt's friend View Post
This came from another discussion.



From my experiences in the last week, it seems that Ottawa City Council, the Transit Commission and OC Transpo are not assessing their decisions as to whether they are getting people to their destinations faster. We are embarking on a multi-billion dollar investment but are we going to be really moving people faster? Are the changes that we have made and are going to make to the bus network going to help? The service changes that were made in the last couple of years were touted to straighten routes to speed up service but really for every route that was made more direct, more routes were made more convoluted. The decisions to use more high capacity buses is reducing frequency and slowing service because of more frequent stopping. I experienced this big time last night.

We see all kinds of reports about service delivery but strictly relates to on-time performance. We see origin-destination surveys. But really what is more important than anything else, is the time a customer takes to get from his or her starting point to his or her destination. Why are we not seeing any assessment of this nature? In my own case, service delivery speed continues to deteriorate. If you really want people to use transit, we need to move people faster whether by train or bus. All the other assessments are secondary.
That's a good point. Maybe you should start a petition or something asking for that to become part of the discussion. I know I'd sign that kind of petition.
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
Reply With Quote
     
     
  #5277  
Old Posted Jul 14, 2013, 10:35 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
According to a report, the free service on Canada Day cost $225,000 in foregone fare revenues. However, the ridership was far higher than normal - about 160,000 passengers through the downtown, which is close to a normal weekday (and about 2x a normal Saturday and 2.5x a normal Sunday, assuming about half the ridership on those days total goes downtown). Overall ridership was less than a normal weekday since there was little entirely non-downtown ridership with most businesses closed and people off.

For 2014, I agree that there should be sponsorship, but it should be maintained and applied to STO service all day as well.
Reply With Quote
     
     
  #5278  
Old Posted Jul 28, 2013, 2:48 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,795
Does anyone know if the U-pass system works in Gatineau?
Reply With Quote
     
     
  #5279  
Old Posted Jul 28, 2013, 4:24 PM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
Quote:
Originally Posted by Beedok View Post
Does anyone know if the U-pass system works in Gatineau?
Is my U-Pass valid on STO?
Yes, the U-Pass is accepted on regular STO routes following the same restrictions as OC Transpo pass holders riding on STO routes. See http://www.octranspo1.com/tickets-and-passes/transfers_to_and_from_sto for more details.
Reply With Quote
     
     
  #5280  
Old Posted Jul 28, 2013, 5:44 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,795
Quote:
Originally Posted by Admiral Nelson View Post
Is my U-Pass valid on STO?
Yes, the U-Pass is accepted on regular STO routes following the same restrictions as OC Transpo pass holders riding on STO routes. See http://www.octranspo1.com/tickets-and-passes/transfers_to_and_from_sto for more details.
Thank you. I'm terrible at finding these things myself.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:10 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.