Quote:
Originally Posted by urbanight93
i was just thinking to myself about this site yesterday.
This site should have been in consideration for the new Burnaby City Hall, instead of those options to demolish the library or build over the fire station. The location is at the heart of metrotown and, if the purple line were ever to come to fruition, be located near a potential stop at Kingsway/Grange.
Would be curious to see what Keltic's latest plans for this site were (before listing it for sale). I always felt like this site needed to have an office/hotel use.
|
I'm not sure about the latest plans (......actually, I do have an idea, but I can't share those),...but when Bosa was doing their rezoning, I believe this was one of the images.
from...
https://www.biv.com/news/real-estate/keltic-closes-multimillion-dollar-burnaby-land-deal-8269808
It's actually a really interesting article on how the sale between Bosa and Keltic went down.
Bosa assembled bought the site for $24 Million in 2018 and sold it for a $121 Million profit 4 years later.
Even at the a correct assessment (of closer to $70 Million) they still would have pocketed a healthy $50-ish million profit.
Ironically, Bosa had planned for a hotel or hotel usage in their redevelopment proposal, right before Keltic bought the site and changed it to more office,.......right before the office market collapsed.
Their timing........not that great.
They also paid $300 Million for a Richmond site and project according to that article, which at the time was the largest commercial sale for a site in Metro Vancouver.
I'm guessing they overpaid there as well.