  #5201  
Old Posted Nov 14, 2017, 9:18 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Quote:
Originally Posted by rocketphish View Post
We know that there is a better way to do this. In 1972, the Brooks Act was implemented in the United States. For 45 years, it has been illegal to use price in scoring RFPs in all federal government procurement, across 49 of 50 U.S. states and hundreds of municipalities. The track record for quality in procurement is well known, and well documented.
Treasury Board has made a recent change to some big RFPs, where the scoring is now 90% technical and 10% price. The new problem is that this has turned procurement upside down, with the traditional perennial winners on price being now unable to compete with superior technical solutions.

https://buyandsell.gc.ca/policy-and-guidelines/supply-manual/section/5

And to complicate matters, contract bidders that bring a lot to the table are in short supply, because bidders never had to compete on technical aspects before. Add to that a huge backlog of work, it means there aren't enough good firms that can actually deliver the goods. In time, this will improve, but it's a 180 degree turn on the lowest-price-wins mentality and could take years that we don't have.
Reply With Quote
     
     
  #5202  
Old Posted Nov 15, 2017, 5:59 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,548
Wrap of Ottawa building under construction cost federal government $555K
Though there are costs attached to being the capital, expenditures like this raise questions in other parts of the country, said the director of The Canadian Taxpayers Federation.

By: Ryan Tumilty, Metro
Published on Tue Nov 14 2017




A plastic wrap around a downtown office building cost the federal government $555,000.

The Canadian Taxpayers Federation discovered through access to information, that the Public Services and Procurement Canada spent $555,272.10 on the wrap of the Postal B building on Sparks Street at the corner of Elgin Street.

Aaron Wudrick, the federation’s director, said they passed the giant building wrap on a regular basis and simply wondered what it might have cost.

“It was a classic case of we were walking by, down the street and thinking I wonder what that cost.”

He said they were pretty stunned by the number.

“It’s half a million dollars just to cover up a building basically.”

The majority of the cost was for installation of the wrap around the structure, which cost $330,409.91. That price also includes removal.

Design work for the wrap cost $82,520 and creating it cost $110,730.30.

Mayor Jim Watson has previously called for the government to do a similar wrap around Parliament’s Centre Block when that building goes under construction next year, for what could be more than a decade of work.

Watson said he would like to see the government do a wrap around the scaffolding with an image of Centre Block, so tourists could continue to get that iconic Ottawa photo.

Wudrick said given how much this one wrap cost, he can’t see justifying the expense for Centre Block.

“People who come to see Parliament come to see the building, they don’t come to see a picture of the building,” he said.

He said there are expenses that go into being a capital that are unavoidable, but things like this make people in other parts of the country question the expense.

“They wouldn’t imagine that it cost $500,000 to throw essentially a coloured sheet over a building.”

Public Services and Procurement Canada (PSPC) spokesperson Pierre-Alain Bujold said the decision to use a branded tarp was based on concern from the National Capital Commission, City of Ottawa and Sparks Street Business and it might have a second life.

"PSPC is exploring options to reuse the tarp once construction is completed. We are looking for ways to partner with community-based organizations."

He said the tarp was needed and even a plain white one would have cost over $200,000.

He said no decisions have been made on Centre Block.

"PSPC is working with their partners to develop and consider options to engage visitors and Canadians during the rehabilitation work and to maintain a positive visitor experience for the millions who come to Parliament Hill annually."

http://www.metronews.ca/news/ottawa/2017...uction-cost-federal-government-555k.html
Reply With Quote
     
     
  #5203  
Old Posted Nov 15, 2017, 6:35 PM
SkeggsEggs SkeggsEggs is online now
Registered User
 
Join Date: May 2016
Posts: 406
The CTF could atleast put in a little bit of effort and compare the costs to other tarps across the world.
Reply With Quote
     
     
  #5204  
Old Posted Nov 15, 2017, 7:28 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
"PSPC is exploring options to reuse the tarp once construction is completed. We are looking for ways to partner with community-based organizations."

Yeah. The Canada 150 theme will be in huge demand.
Reply With Quote
     
     
  #5205  
Old Posted Nov 15, 2017, 7:33 PM
Arcologist Arcologist is offline
Registered User
 
Join Date: Oct 2011
Location: The Nation's Capital
Posts: 696
I bet that wrap will fit nicely on so many other Ottawa buildings...
Reply With Quote
     
     
  #5206  
Old Posted Nov 15, 2017, 7:36 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,817
I think the government gets screwed over and overpays for everything (or gets overcharged bc, well, theyre the government... theyll pay right?). It's the same thing when a white tourist goes to India or Asia for example, locals
know the tourist has money, so prices are significantly higher for them.

In this example, $110K for the cost of the tarp? Not an expert, so that might be possible.

But $330K for the installation? This can't have taken more than let's say 10 guys a couple of days? I don't see how it can be that much.

Finally, $82K for the design of the tarp? This looks like something a designer could've whipped up in a half day on photoshop or whatnot, how can this cost so much? I feel like they could've shopped around and awarded it to one design firm for a flat $10K fee or something.

Anyways, rant over...
Reply With Quote
     
     
  #5207  
Old Posted Nov 15, 2017, 8:44 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,013
Yeah, that design cost sounds problematic.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5208  
Old Posted Nov 15, 2017, 9:07 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,361
Quote:
Originally Posted by Uhuniau View Post
Yeah, that design cost sounds problematic.
Not if you consider email chain and myriads of meetings between all parties it went though. They probably started working on it 5 years or so in advance.
Reply With Quote
     
     
  #5209  
Old Posted Nov 16, 2017, 11:50 PM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
Quote:
Originally Posted by zzptichka View Post
Not if you consider email chain and myriads of meetings between all parties it went though. They probably started working on it 5 years or so in advance.
the canada 150 logo was unveiled in 2015 so i certainly hope they weren't designing the wrap 3 years before it, with it in mind.
Reply With Quote
     
     
  #5210  
Old Posted Nov 17, 2017, 3:29 AM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by OTSkyline View Post
Finally, $82K for the design of the tarp? This looks like something a designer could've whipped up in a half day on photoshop or whatnot, how can this cost so much? I feel like they could've shopped around and awarded it to one design firm for a flat $10K fee or something.

Anyways, rant over...
The design probably included more than the graphics ; it likely also included the design of the scaffolding and how the tarps would attach to it.
Reply With Quote
     
     
  #5211  
Old Posted Nov 21, 2017, 8:08 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
A 6 storey mixed-use building is being proposed at 386 Richmond. The proposed uses include at-grade commercial, second floor office, and four floors of residential, containing a total of 16 dwelling units. No parking is proposed.

Renders: http://webcast.ottawa.ca/plan/All_Image%...2017-11-16_Renderings_D07-12-17-0134.PDF

Planning Rationale:http://webcast.ottawa.ca/plan/All_Image%...ing%20Rationale%20-%20D07-12-17-0134.PDF
Reply With Quote
     
     
  #5212  
Old Posted Nov 21, 2017, 8:10 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
The City of Ottawa has received a Site Plan Control application and a Zoning Bylaw Amendment application to facilitate the construction of a new five-storey self-storage facility with retail at grade and associated surface parking at 851 Industrial. The applicant is Dymon Storage.

Renders: http://webcast.ottawa.ca/plan/All_Image%...0-%20Elevations%20-%20D07-12-17-0133.PDF

Planning Rationale: http://webcast.ottawa.ca/plan/All_Image%...ing%20Rationale%20-%20D07-12-17-0133.PDF
Reply With Quote
     
     
  #5213  
Old Posted Nov 21, 2017, 8:48 PM
Proof Sheet Proof Sheet is offline
Registered User
 
Join Date: May 2009
Posts: 2,985
Quote:
Originally Posted by Jayday23 View Post
A 6 storey mixed-use building is being proposed at 386 Richmond. The proposed uses include at-grade commercial, second floor office, and four floors of residential, containing a total of 16 dwelling units. No parking is proposed.

Renders: http://webcast.ottawa.ca/plan/All_Image%...2017-11-16_Renderings_D07-12-17-0134.PDF

Planning Rationale:http://webcast.ottawa.ca/plan/All_Image%...ing%20Rationale%20-%20D07-12-17-0134.PDF
The property, which had been a tailors shop until recently, was sold in June 2017 for $2.4 million on a 33 x 112 lot. Crazy money.
Reply With Quote
     
     
  #5214  
Old Posted Nov 22, 2017, 1:03 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,548
Quote:
Originally Posted by Jayday23 View Post
A 6 storey mixed-use building is being proposed at 386 Richmond. The proposed uses include at-grade commercial, second floor office, and four floors of residential, containing a total of 16 dwelling units. No parking is proposed.

Renders: http://webcast.ottawa.ca/plan/All_Image%...2017-11-16_Renderings_D07-12-17-0134.PDF

Planning Rationale:http://webcast.ottawa.ca/plan/All_Image%...ing%20Rationale%20-%20D07-12-17-0134.PDF
New thread started over here:
http://forum.skyscraperpage.com/showthread.php?t=230811
Reply With Quote
     
     
  #5215  
Old Posted Nov 22, 2017, 1:17 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,548
Quote:
Originally Posted by Jayday23 View Post
The City of Ottawa has received a Site Plan Control application and a Zoning Bylaw Amendment application to facilitate the construction of a new five-storey self-storage facility with retail at grade and associated surface parking at 851 Industrial. The applicant is Dymon Storage.

Renders: http://webcast.ottawa.ca/plan/All_Image%...0-%20Elevations%20-%20D07-12-17-0133.PDF

Planning Rationale: http://webcast.ottawa.ca/plan/All_Image%...ing%20Rationale%20-%20D07-12-17-0133.PDF
New thread started over here:
http://forum.skyscraperpage.com/showthread.php?t=230812
Reply With Quote
     
     
  #5216  
Old Posted Nov 24, 2017, 8:51 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Anyone know what's going on with Place du Portage I? The roof looks like it's being reclad to a darker colour.. or maybe it's always been darker and I just haven't noticed..
Reply With Quote
     
     
  #5217  
Old Posted Nov 27, 2017, 4:28 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,832
Reply With Quote
     
     
  #5218  
Old Posted Nov 27, 2017, 5:18 PM
Requin Requin is online now
Registered User
 
Join Date: Dec 2009
Posts: 107
Wow, really surprised to see Metro on the list. That is very disappointing.
Reply With Quote
     
     
  #5219  
Old Posted Nov 28, 2017, 5:15 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,832
No flash geoottawa

Anyone know if there is a non-flash version of geo-Ottawa?
Reply With Quote
     
     
  #5220  
Old Posted Nov 28, 2017, 11:06 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,741
Quote:
Originally Posted by acottawa View Post
That is some sketchy ass deal right there. According to the Citizen, the companies had no idea about each others plans for the papers once they were transferred, yet they both announced the shut down of nearly all of them the very same day and fired everyone instantly.

Funny to how only two Metros that were transferred, Ottawa and Winnipeg, both of them shut down. The rest of them? Still printing.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:48 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.