Parc Belltown, taken 12-02-06:
The tower on the south 1/2 (above picture) is topped off.
Mosler Lofts, taken 12-04-06:
Not sure how far behind schedule construction work has fallen. The first concrete pour was about a month behind schedule (based on information from a bulletin posted outside the construction office) and this was
before the concrete workers strike.