Last week, The Hagadone Corporation announced plans for a Coeur d'Alene Resort addition...A second tower was proposed, rising in a tiered 15 story structure. If completed, this would be the 6th building in town at 14+ floors.
There will be 139 hotel rooms (the current building has 338 so the complex will have a total of 477 rooms), a restaurant with a rooftop lounge, parking for 80 vehicles, and retail/commercial spaces in this building. It will be located diagonally from where the current building sits, between First and Second Streets along Sherman Avenue.
The preliminary plan was just filed with the city of Coeur d'Alene. The goal is to begin work on it in early 2025 with scheduled completion in May 2027. Note that an addition to the Resort has been proposed twice in the past, most recently in 2015 (although both of the previous proposals were in different locations...on top of the current Coeur d'Alene Resort Plaza Shops, which is across the skywalk from the current tower). I don't give this proposal a 100% shot of going through, although I think it is more likely than not to happen. Previously, plans were pulled due to worsening economic conditions and because of signals from the city of Coeur d'Alene that plan approval might not happen.
As always, there are horrible renderings! And, as always, the new tower will look just like the current one, design-wise.
Link:
https://cdapress.com/news/2023/nov/3...-new-addition/
Here's a link to when the previous plans were pulled in 2015, along with another horrible rendering:
https://www.kxly.com/news/local-news...f759e58e9.html