HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


Reply

 
Thread Tools Display Modes
     
     
  #461  
Old Posted Jun 24, 2019, 10:20 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,022
That's what I thought, too.
Reply With Quote
     
     
  #462  
Old Posted Jul 3, 2019, 9:00 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,022
Quote:
June 27, 2019 – For the next two weeks:​
Demolition of the floors and openings inside of the existing building is ongoing.
109 of 120 footings have been replaced to date.
Shoring work for the West Georgia plaza will continue for the next three months.
The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project.
The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday).
All activities are executed within the parameters of the City of Vancouver’s building bylaws.
Raft slabs for the south tower have started.
Underground mechanical and electrical have started in the basement.
The third of four tower cranes will be erected on July 13 and 14.
Exterior demolition has started along West Georgia and will continue along Hamilton Street over the next month. New window openings will be sawcut into the existing façade over the next two months.
https://www.thepostnews.ca/
Reply With Quote
     
     
  #463  
Old Posted Jul 3, 2019, 9:45 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
July 2 '19, my pics






Reply With Quote
     
     
  #464  
Old Posted Jul 4, 2019, 5:03 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
July 3 '19, my pics






Reply With Quote
     
     
  #465  
Old Posted Jul 14, 2019, 3:20 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
About 1:00 PM today.




July 13 '19, my pics












Reply With Quote
     
     
  #466  
Old Posted Jul 14, 2019, 3:51 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
I got a chance today to get an idea how others might experience the construction chaos in the neighbourhood today. I live one block away from The Post and when I was taking these pics I ran into a couple of my neighbours from across the hall. They are an elderly couple (both in their mid-eighties) and are still living independently with some help from their family and friends. They've been in the building for at least fifteen years and have watched the enormous changes that continue to happen almost every direction you turn. When I pointed to The Post and told them they were installing another crane the lady looked over and then heaved a sigh, shook her head and said "Aren't two cranes enough?!".




July 13 '19, my pics




Reply With Quote
     
     
  #467  
Old Posted Jul 15, 2019, 6:19 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
About 3:30 today.



July 14 '19, my pics




Reply With Quote
     
     
  #468  
Old Posted Jul 15, 2019, 6:22 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
About 5:30 today.




July 14 '19, my pics






Reply With Quote
     
     
  #469  
Old Posted Jul 15, 2019, 6:28 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
A walk around the block.




July 14 '19, my pics
































Reply With Quote
     
     
  #470  
Old Posted Jul 15, 2019, 4:19 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,754
cool! thanks!
__________________
i have no idea what's going on
Reply With Quote
     
     
  #471  
Old Posted Jul 17, 2019, 1:04 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,022
Thanks!
Is it weird that the Dunsmuir sidewalk is still open??!
Reply With Quote
     
     
  #472  
Old Posted Jul 17, 2019, 7:02 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,022
July 12, 2019 Update:

Quote:
July 12, 2019 – For the next two weeks:​
Demolition of the floors and openings inside of the existing building is ongoing.
111 of 120 footings have been replaced to date.
Shoring work for the West Georgia plaza will continue for the next three months.
The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project.
The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday).
Raft slabs for the south tower have started.
Underground mechanical and electrical have started in the basement.
Concrete columns and cores have commenced.
The third of four tower cranes will be erected on July 13 and 14.
Exterior demolition has started along West Georgia and will continue along Hamilton Street over the next month. New window openings will be sawcut into the existing façade over the next two months on all elevations.
Slab on grade preparation will begin with the first slab being poured in early August.
All activities are executed within the parameters of the City of Vancouver’s building bylaws.
https://www.thepostnews.ca/


https://www.thepostnews.ca/
Reply With Quote
     
     
  #473  
Old Posted Jul 18, 2019, 4:38 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
July 17 '19, my pics










Reply With Quote
     
     
  #474  
Old Posted Jul 31, 2019, 9:26 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,022
From the website:

Quote:
Construction Updates

July 25, 2019 – For the next two weeks:​
  • Demolition of the floors and openings inside of the existing building is ongoing.
  • 114 of 120 footings have been replaced to date.
  • Shoring work for the West Georgia plaza will continue for the next 2 months.
  • The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project.
  • The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday).
  • Elevator bank foundation for the south tower has started.
  • Underground mechanical and electrical have started in the basement.
  • Concrete columns and cores have commenced.
  • The third of four tower cranes was erected on July 13 and 14.
  • Exterior demolition has started along West Georgia and will continue along Hamilton Street over the next month. New window openings will be sawcut into the existing façade over the next two months on all elevations.
  • Slab on grade preparation will begin with the first slab being poured in early August.
  • Exterior finish salvage and wall openings for new glass will continue over the next 3 month along Hamilton, Dunsmuir and Homer streets.
  • All activities are executed within the parameters of the City of Vancouver’s building bylaws.
https://www.thepostnews.ca/
Reply With Quote
     
     
  #475  
Old Posted Aug 19, 2019, 5:55 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
Aug.18 '19, my pics


















Reply With Quote
     
     
  #476  
Old Posted Aug 21, 2019, 5:48 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
Aug.20 '19, my pics
























Reply With Quote
     
     
  #477  
Old Posted Aug 21, 2019, 5:49 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
Aug.20 '19, my pics
























Reply With Quote
     
     
  #478  
Old Posted Sep 10, 2019, 7:06 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,868
Sept.9 '19, my pics






Reply With Quote
     
     
  #479  
Old Posted Sep 10, 2019, 4:58 PM
truenorth44 truenorth44 is offline
Registered User
 
Join Date: Jul 2015
Posts: 211
It looks so vulnerable - sure hope there's no shaking before it's reinforced.
Reply With Quote
     
     
  #480  
Old Posted Sep 10, 2019, 5:42 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,567
Quote:
Originally Posted by truenorth44 View Post
It looks so vulnerable - sure hope there's no shaking before it's reinforced.
That's the raw structure of the building we're seeing. Everything else is superficial. Plus, there's no machinery, equipment, vehicles, mail, or people in the structure, all of which it was designed to hold in the midst of the most violent weather or forces for which the building code at the time required.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 11:17 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.