Quote:
Originally Posted by Policy Wonk
I have always argued 7th Ave will have to be grade separated even if no North Central LRT of any alignment is ever built. Calgary Transit can't operate their peak headways on 7th Ave today - yet it is their stated intention to operate both the 201 and 202 at greater frequencies than today's combined traffic on 7th Ave. This is impossible even without interlining on 7th. So yes, by the time a Nose Creek LRT begins construction 7th ave will be grade separated.
Perhaps the redundant C-Train platforms can then be re-purposed as art galleries.
|
7th ave may need to be grade separated one day, but going to 4 car trains and getting rid of the interlining basically allows for a tripling of current capacity on the NE line. That should have enough capacity for the four planned stations yet to come, and some substantial densification along the existing line. Perhaps even further extension up to the Cross Iron Mills area. Now, CT may want to increase frequency to provide better service, but how much would they be willing to pay for that if it's not needed overall capacity wise?
After the S - NW line is moved into a subway under 8th, 7th ave should provide enough capacity for the NE- W line for 30-40 years, at least. There may be other reasons to want to move the line underground, but the earliest I can see that happening is at the end of the new stations' useful life. The suburban stations would be around 60 years old at that time too, so maybe there would be some pressure to rebuild the whole line, perhaps underground.
Perhaps gas prices get so high that more and more people want to ride the train. Hard to really know what the future would bring. There are many factors, some of which have likely not even been thought of at this point.
My guess is quite similar to Wooster's. I think that another level of government will fund the line about 12 to 15 years from now. However, the city put half of a decade's worth of MSI funding into the WLRT, and before the NC line is built the $500M-$1B 8th ave subway and the $2-2.5B SE LRT will have gone ahead, both with future money given by other levels of government. I hope that the provincial government steps up to fund LRT once the ring roads are complete. Putting the same amount of money into LRT as they have put into the ring roads would get most lof those projects done.