A tender up for this year's traffic light work. Replacing the ones at Pasqua & Pasqua Gate with the cantilevered type to get rid of the poles in the medians on Pasqua. The ones at Gordon & Lockwood by Southland also getting replaced.
As expected Arens is getting traffic lights at Woodland Grove. Nearby a set is getting installed at Chuka & Buckingham. I'm looking forward to the Arens ones, shitty visibility there when crossing Woodland Grove due to fences at the sidewalk.
Various pedestrian crossings. Grand Road & Shannon, Park & 4th Ave, 25th & Rae near Golden Mile, upgrade of one near WF Ready school, upgrade of one in Argyle Park.
I walked over to the rail bridge with my digital camera. They are currently welding angle steel across the columns top and bottom along with a diagonal piece to tie them together. With the new drone off for a camera swap I was looking at the controller last night and saw there's a drone simulator built-in, so I got to test some of the features though not everything is implemented.
I also saw a vibrating hand rail while I was walking over. I stopped it before I left and it was doing it again when I passed it later.
https://www.youtube.com/watch?v=YDbSbRhlCBM