I dont have a problem with the height.
What kills me the most about the complaints is the people complain about the height and then complain about there not being enough parking! Well usually people have to build up to make room for parking. I also dont like someone complaining about losing their views. Whether the building is 50 feet or 75 feet his view will be gone so why even bring it up. Sometimes the problem with getting property developed is zoning. This is a large parcel and it needs to be redeveloped. Especially if the streetcar comes down ELysian Fields.
Bid List on Gibbs Website:
Algiers Crossing
1 Addendum
New Orleans, LA $65,000,000 Marjean Gohd
This project is to construct a multi-building apartment complex. The buildings will consist of 820,650 sf that will compose 324 living units, 325 enclosed parking spaces, and 11,000 sf of retail shell space.
Deployment Processing Facility at Camp Shelby
3 Addenda
Add/Reno Audobon School
4 Addenda
New Orleans, LA $20,000,000 3-1-2012
2:00 PM Greg K/ Nicole F
Renovations and additions to existing school – selective demolition in 35,000 sf 3 story original building and addition of new 20,000 sf 3 story attached structure. Upgrades to existing building are hurricane related repairs including windows and doors, repair stucco surface, new clay tile roof and underlayment, new mod bit roof. Exterior and interior historic restoration. Some hazmat remediation included – asbestos pipe covering, lead paint removal, PCB-mercury in flourescent light fixtures. New addition is pile cap/grade beam foundation, structural steel, concrete on metal deck, mod bit roof, new MEP and sprinklers throughout, new utility connections, 250 kW gas generator, electric fire pump, new kitchen, minor sitework. LEED silver, full commissioning. 487 calandar days duration.
Nims Center Sound Stage – D
1 Addendum
New Orleans, LA $200,000 3-2-2012
2:00 PM Stephanie Guidry
This project consists of partial demolition of a concrete slab to make way for the construction of a 10,500 sf soundstage. Scope includes timber piles, concrete, steel, roofing, doors, metal framing, flooring, painting, specialties, mechanical, and electrical.
Louis Armstrong Airport Phase 4
New Orleans, LA $10,000,000 3-5-2012
2:00 PM Marjean Gohd
This project is to complete interior renovations including finish and FF&E renovation of the main concourses and ticketing areas and associated public spaces. Work includes demolition of floor, wall, and ceiling finishes as awell as reconfiguration of ticketing areas.
Xavier University – West Campus
3 Addenda
New Orleans, LA $1,000,000 3-6-2012
2:00 PM Nicole Favalora
Construction of 5 parking lots, base and sub-base materials, striping, utilities, sidewalks, barrier curbs, lighting and landscaping.
Slidell Memorial Hospital – Emergency Department/Cardiology Expansion
1 Addendum
Slidell, LA $20,000,000 3-6-2012
3:00 PM Harold Reed
This project is to add additional building space and renovate existing department areas.
St. Martin’s Manor
1 Addendum
Metairie, LA $7,000,000 3-8-2012
3:00 PM Scott Mousel
This project is to complete additons to the existing building as well as renovations of the current structure.
J. Bennet Johnson Lab Renovations
New Orleans, LA $9,000,000 3-15-2012
2:00 PM Greg Kantak
Selective demolition and renovation of labs, offices, toilets on 3 floors of existing 32,000 sf building; partial replacement of curtainwall on 2 elevations.
JP Community Health
Jefferson Parish, LA $300,000 3-15-2012
2:00 PM Lauren Gibbs
MSY – United Airlines
Moisant, LA $500,000 3-19-2012
4:00 PM Nicole Favalora
updated 2/28/2012
I know we were all wondering what they are building on the backside of Benson Tower in Champions Square. Well it looks like its descibed on Eskew Dumez and Ripples site but I cant blow the picture up enough to see what it says. Can anyone else see it?
http://www.google.com/url?sa=t&rct=j...4jXze7xdIqrvog
Click on Champions Square in the portfolio section!