HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth


    Sutton Place Nova Centre in the SkyscraperPage Database

Building Data Page   • Halifax Skyscraper Diagram

Map Location

Reply

 
Thread Tools Display Modes
     
     
  #4281  
Old Posted Mar 20, 2015, 2:13 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by kph06 View Post
Those look to be lateral supports that will fix to the concrete slab and brace the tower crane. Judging by the location I would say we are due to see the flat top crane grow soon.

Thanks for the information kph06. I looked it up after reading your post and from the pictures on the internet it does look like tie-beam supports like in the picture (below). I had never noticed these before in Halifax area development pictures. Are these commonly used?

(source: http://www.constructionweekonline.com/article-22172-towers-towers-towers/2/)
Reply With Quote
     
     
  #4282  
Old Posted Mar 20, 2015, 9:30 AM
kph06's Avatar
kph06 kph06 is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,101
Quote:
Originally Posted by fenwick16 View Post
Thanks for the information kph06. I looked it up after reading your post and from the pictures on the internet it does look like tie-beam supports like in the picture (below). I had never noticed these before in Halifax area development pictures. Are these commonly used?

(source: http://www.constructionweekonline.com/article-22172-towers-towers-towers/2/)
Some of the taller cranes used them, TD Bank extension and the Trillium used them recently.
Reply With Quote
     
     
  #4283  
Old Posted Mar 21, 2015, 8:28 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Workers have been working late nights and Saturday to once again get the snow cleared off the Grafton Street level (it must be frustrating that they had to do it twice after late winter snow storms).

The weather for the coming week is forecast to have mostly daytime temperatures above freezing (as it should be for this time of year) so maybe the concrete floor for Grafton Street (Exhibit A Hall ceiling) will be poured before the end of March.

It is so great to have all the closeup pictures and Nova Scotia Webcams live view to follow various construction projects. I can remember when people had to hope for pictures in the local newspapers or go to a construction site in person to see construction progress (yeah for the internet!). After moving to Ontario in 1980 and prior to the internet there were many years when I had little knowledge of what was happening in Halifax and Nova Scotia (it isn't covered much in the news up here).

(source: http://www.novascotiawebcams.com/en/webcams/nova-centre/ )
Reply With Quote
     
     
  #4284  
Old Posted Mar 24, 2015, 4:44 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
A few from today. The crane on the corner of Prince and Argyle has been secured to the rising structure.







Reply With Quote
     
     
  #4285  
Old Posted Mar 26, 2015, 10:18 PM
halifaxboyns halifaxboyns is offline
Registered User
 
Join Date: Feb 2010
Location: Planet earth
Posts: 3,883
I was looking at the floor plan data on their website in comparison to the current centre - what a big difference in terms of convention sizes there will be. I was really impressed! It will be interesting to see how busy (in terms of utilization) this facility gets since it's about 4x the size of the current centre.
Reply With Quote
     
     
  #4286  
Old Posted Mar 26, 2015, 11:25 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
The first of the steel for the ballroom floor went up along argyle today. Pics tomorrow.
Reply With Quote
     
     
  #4287  
Old Posted Mar 27, 2015, 4:13 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Images from http://novacenter.builthalifax.ca/

Slab being poured today. Note the forms for the crane anchor bolts in the center of the image.


This is just the start of the steel. these steel columns will actually be encased in Concrete and the ball room be one level up.



Reply With Quote
     
     
  #4288  
Old Posted Mar 27, 2015, 10:05 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
Images from http://novacenter.builthalifax.ca/

Slab being poured today. Note the forms for the crane anchor bolts in the center of the image.
Those are amazing close-ups. You must have a lot of connections to be allowed on the construction site

20 years ago people would have had little knowledge of the construction methods being employed in such a project as the Nova Centre. The internet has really changed the world with the easy access to knowledge in all fields of interest.

I find watching the construction progress of the Nova Centre and other Halifax area projects more interesting than most movies even though I am a movie buff. I am looking forward to seeing extraordinary progress over the next few months as the towers rise and as the structural steel of the convention centre is assembled.
Reply With Quote
     
     
  #4289  
Old Posted Mar 27, 2015, 11:49 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by fenwick16 View Post
Those are amazing close-ups. You must have a lot of connections to be allowed on the construction site
I have an arangement with argyle developments. I Am basically a contractor and need to carry insurance to go on site. But basically can come and go as I please. When they need progress photos for whatever I make a few bucks.
Reply With Quote
     
     
  #4290  
Old Posted Mar 28, 2015, 8:29 AM
worldlyhaligonian worldlyhaligonian is offline
Registered User
 
Join Date: Jun 2006
Posts: 3,991
Quote:
Originally Posted by Ziobrop View Post
I have an arangement with argyle developments. I Am basically a contractor and need to carry insurance to go on site. But basically can come and go as I please. When they need progress photos for whatever I make a few bucks.
Everybody here appreciates your updates!
Reply With Quote
     
     
  #4291  
Old Posted Mar 28, 2015, 11:38 AM
terrynorthend terrynorthend is offline
Registered User
 
Join Date: Feb 2007
Posts: 1,210
Quote:
Originally Posted by Ziobrop View Post
I have an arangement with argyle developments. I Am basically a contractor and need to carry insurance to go on site. But basically can come and go as I please. When they need progress photos for whatever I make a few bucks.
Yes, great work. It also helps that you clearly understand what is going on at a complex construction site, the things which are significant to take pictures of, and how various components are going to take shape.
Reply With Quote
     
     
  #4292  
Old Posted Mar 28, 2015, 2:52 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
Thanks for all the close up pics and info Ziobrop!

A few from yesterday.





Reply With Quote
     
     
  #4293  
Old Posted Mar 28, 2015, 3:07 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Jonovision View Post
Thanks for all the close up pics and info Ziobrop!

A few from yesterday.

https://41.media.tumblr.com/ac8e896b9d20eff677dc82290abac6fd/tumblr_nlxequCSsG1sk8kjeo1_1280.jpg
You were able to get a picture of the cranes from 3 different construction projects - Roy, Nova Centre and 5445 Rainnie Drive. Maybe the crane for the Dillon will go up soon also?

I see construction workers are on site today at the Nova Centre - http://www.novascotiawebcams.com/en/webcams/nova-centre/
Reply With Quote
     
     
  #4294  
Old Posted Mar 30, 2015, 4:02 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by fenwick16 View Post
Maybe the crane for the Dillon will go up soon also?
Nope, apparently its being done without a tower crane - 1592 barrington style i guess.
Reply With Quote
     
     
  #4295  
Old Posted Mar 30, 2015, 4:18 PM
OldDartmouthMark OldDartmouthMark is online now
Registered User
 
Join Date: May 2010
Posts: 10,342
Quote:
Originally Posted by Jonovision View Post
Thanks for all the close up pics and info Ziobrop!
Yes! Props for Ziobrop!
Reply With Quote
     
     
  #4296  
Old Posted Mar 30, 2015, 7:57 PM
musicman musicman is offline
Registered User
 
Join Date: Nov 2008
Posts: 270
Must be RCS doing it..... They seem to like doing things the hard way.... Somebody there thought a square wheel was a good idea...lol
Reply With Quote
     
     
  #4297  
Old Posted Mar 30, 2015, 11:48 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
Quote:
Originally Posted by Ziobrop View Post
Nope, apparently its being done without a tower crane - 1592 barrington style i guess.
I wonder if its because of the Nova Centre crane being in the way? Or maybe they will use one like the one that built the similarly sized building on Spring and Birmingham?
Reply With Quote
     
     
  #4298  
Old Posted Mar 31, 2015, 1:13 AM
kph06's Avatar
kph06 kph06 is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,101
From what I have noticed with other buildings built by Mosaik, I think they manage it in house and they use smaller formwork that can be moved by their workers manually. I assume they will do all the concrete placement via pumper truck. Osco (formerly Sackville Ready Mix) has a beast of a pumper that was placing concrete on the 10th or 11th floor at the building on Fresian Place today. Previously I thought 6 floors was the upper limit with those.
Reply With Quote
     
     
  #4299  
Old Posted Mar 31, 2015, 12:59 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Yes, Mosaic Likes to do stuff themselves. there are very large concrete pumps, but they typically need special permits to move.

I found out about the lack of crane actually specifically because there was a concern it could conflict with the 4 at the Nova Center.
Reply With Quote
     
     
  #4300  
Old Posted Apr 1, 2015, 3:35 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
Love seeing the sunrise over the site.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 5:42 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.