11th Ave has been paved.

Last edited by Stormer; Oct 24, 2025 at 2:45 PM.
Reply With Quote
     
     
  #4262  
Old Posted Oct 22, 2025, 3:31 PM
The mayor The mayor is offline
Registered User
 
Join Date: Apr 2021
Posts: 1,247
Quote:
Originally Posted by one_brick_at_a_time View Post
I’ve heard rumor that an offer was made. Not sure if approved or if they are waiting on the final HBC liquidation legal process to go through to begin anything.

Like the Sears redeveloped side, they will have to gut it all and remove asbestos and get new HVAC when development comes.
An offer has been made that’s why ehealth moved out great news , maybe a winners
Reply With Quote
     
     
  #4263  
Old Posted Oct 22, 2025, 3:33 PM
The mayor The mayor is offline
Registered User
 
Join Date: Apr 2021
Posts: 1,247
Quote:
Originally Posted by gecho111 View Post
Still levelling out the Costco building area. Must be getting close to the end of pipe installation as they are working in a spot that will be behind the building. Installing pipe across the road at Candy Cane Park.

I was going to stop by AE Wilson but had a not so good landing at Candy Cane park. https://www.youtube.com/watch?v=nYAmKqizql8 No damage other than having to replace the props which was something I was going to do anyway as they were getting a bit rough from having landed in grass more times than I should have.

https://www.flickr.com/photos/reginaconstruction/

Hopefully the weather will hold out so they can get the foundation poured
Reply With Quote
     
     
  #4264  
Old Posted Oct 22, 2025, 3:34 PM
The mayor The mayor is offline
Registered User
 
Join Date: Apr 2021
Posts: 1,247
Quote:
Originally Posted by one_brick_at_a_time View Post
Thank you for posting
Reply With Quote
     
     
  #4265  
Old Posted Oct 22, 2025, 3:37 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
Quote:
Originally Posted by Stormer View Post
11th Ave has been paved.
There was a CTV story yesterday indicating the city hoped to have Dewdney / 11th wrapped up by mid November. That's pushing it pretty late.
Reply With Quote
     
     
  #4266  
Old Posted Oct 22, 2025, 3:42 PM
HomeInMyShoes's Avatar
HomeInMyShoes HomeInMyShoes is offline
arf
 
Join Date: May 2005
Location: File 13
Posts: 14,578
Quote:
Originally Posted by Stormer View Post
11th Ave has been paved.
I'm hoping to not have to walk four extra blocks to get to the Cornwall Centre soon.
__________________

-- “We heal each other with kindness, gentleness and respect.” -- Richard Wagamese
-- “Unless someone like you cares a whole awful lot, Nothing is going to get better. It's not.” -- Dr. Seuss
Reply With Quote
     
     
  #4267  
Old Posted Oct 22, 2025, 9:29 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
The drone is a little quieter with the new propellers. They seems to get noisier when the blade edges get rough over time.

2 foundations left to go at the Rosewood Avana project. Paving started at the Skyview project. Just about out of the creek at the AE Wilson sewage expansion. Moving westward with pipe for a new east/west road in Westerra, having started at the far east end. I just noticed in the Westerra photo there is a stretch of land cleared to Sharp Park, so maybe the road will be extended to there. A sign went up recently advertising commercial land for sale bordering the park.

https://www.flickr.com/photos/reginaconstruction/




Last edited by gecho111; Oct 23, 2025 at 12:21 AM.
Reply With Quote
     
     
  #4268  
Old Posted Oct 23, 2025, 10:24 PM
pappcam pappcam is offline
Registered User
 
Join Date: Mar 2008
Location: Regina
Posts: 773
Quote:
Originally Posted by The mayor View Post
An offer has been made that’s why ehealth moved out great news , maybe a winners
I'm going to guess with 99.999% certainty that a move has been in the works for a while and has nothing to do with a rumour of a future tenant. These things don't happen overnight.
Reply With Quote
     
     
  #4269  
Old Posted Oct 24, 2025, 2:44 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,786
Quote:
Originally Posted by pappcam View Post
I'm going to guess with 99.999% certainty that a move has been in the works for a while and has nothing to do with a rumour of a future tenant. These things don't happen overnight.
I can almost guarantee that the eHealth space will never be retail again. There are still 3 other floors to fill with retail and the top floor will be last as it has been converted to office and does not have direct access to the mall. Ideally you would have one retailer take the main floor and basement and another take the second and third floors. But tenants that big do not really exist anymore for downtown malls.
Reply With Quote
     
     
  #4270  
Old Posted Oct 24, 2025, 2:46 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,786
Quote:
Originally Posted by Stormer View Post
11th Ave has been paved.
Looking at it this am, another layer of asphalt is required.
Reply With Quote
     
     
  #4271  
Old Posted Oct 24, 2025, 2:55 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,786
Another $11.4 million permit was issued for the PTI Transformers expansion project at 1155 PARK STREET . This one appears to be for the office portion.
Reply With Quote
     
     
  #4272  
Old Posted Oct 24, 2025, 9:28 PM
The mayor The mayor is offline
Registered User
 
Join Date: Apr 2021
Posts: 1,247
Quote:
Originally Posted by Stormer View Post
I can almost guarantee that the eHealth space will never be retail again. There are still 3 other floors to fill with retail and the top floor will be last as it has been converted to office and does not have direct access to the mall. Ideally you would have one retailer take the main floor and basement and another take the second and third floors. But tenants that big do not really exist anymore for downtown malls.
Maybe the new library will take up the space
Reply With Quote
     
     
  #4273  
Old Posted Oct 24, 2025, 10:19 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
Last layer of paving at the Grand Coulee roundabout. Starting to install the permanent lane markings. Bringing in a lot of base for the truck stop parking lot. They were grinding out an eastbound exit lane that was for the temporary Grand Coulee access.

They seem to be building up the area where the Costco building is going. The pipe work has made a full loop of the site. They appear to be adding a direct entrance to the Costco site beside the lift station. I didn't notice when I was flying the drone so didn't get a decent photo of it. An excavator was working in the ditch and there were culvert pipes next to it. It was on the development application and is only for traffic coming from the west.

https://www.flickr.com/photos/reginaconstruction/





And a few I took yesterday but never made a post for.




Last edited by gecho111; Oct 24, 2025 at 10:38 PM.
Reply With Quote
     
     
  #4274  
Old Posted Oct 25, 2025, 3:41 AM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
I'm starting to think the city didn't realize they needed zoning height variance for the aquatic centre until they were about to put shovels in the ground. They should be able to make up the lost time by the 2029 opening.
Reply With Quote
     
     
  #4275  
Old Posted Oct 25, 2025, 11:27 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
The Candy Cane park pipe looks small in the photos but the inner diameter per the label is 2.1 meters and each one weighs 10,000 kg.

It looks like the Costco building pad is leveled. Nearly every large commercial building pad I'd seen they excavate down then drill piles. But for the Costco they built it up and are now spreading road base over it. The road base might be in anticipation of working in wet conditions so the pile driller doesn't make a muddy mess.

I took a few videos.
Dewdney: https://www.youtube.com/watch?v=T46w99xYlbU
11th Ave (looked really dark on the controller but turned out): https://www.youtube.com/watch?v=Y8u8C5M9iGs
Flying past some of the glass buildings on the return leg downtown. https://www.youtube.com/watch?v=8yefgwhEILs
Short clip at Harbour Landing School: https://www.youtube.com/watch?v=tMyHyzXxtvw

https://www.flickr.com/photos/reginaconstruction/






Last edited by gecho111; Oct 26, 2025 at 1:33 PM.
Reply With Quote
     
     
  #4276  
Old Posted Oct 26, 2025, 5:50 AM
westerra westerra is offline
Registered User
 
Join Date: Aug 2025
Posts: 5
Looks like Regina will have two Costcos by Q2 2026. Idk how these deals work but ISCs records still show Westerra development Corp as the owner.
Reply With Quote
     
     
  #4277  
Old Posted Oct 26, 2025, 3:43 PM
The mayor The mayor is offline
Registered User
 
Join Date: Apr 2021
Posts: 1,247
Thank you for the drone video of downtown I was pretty good. All we need is a couple of new high-rise one never know what is in the works. Eventually something will have to be built.
Reply With Quote
     
     
  #4278  
Old Posted Oct 26, 2025, 5:45 PM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,257
The Candy Cane Park work isn't supposed to finish until next spring. What a huge project.

Simons has been very cautious in their expansion across the country, but I wonder if Cornwall has been in touch with them to see if that's a possibility.
Reply With Quote
     
     
  #4279  
Old Posted Oct 26, 2025, 6:55 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
Quote:
Originally Posted by StealthGirl View Post
The Candy Cane Park work isn't supposed to finish until next spring. What a huge project.
The city has been doing storm water upgrades all over the city in recent years. I'm not sure if there was insufficient capacity or maybe some older neighbourhoods had storm water connected into the sewer pipes. Heavy rainfall can tax the sewage pumping stations.
Reply With Quote
     
     
  #4280  
Old Posted Oct 26, 2025, 7:16 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 752
Ronald McDonald House second floor on the go. Got pictures of both of the infill projects south of the General. Cleared a bunch more trees from the south section of the Glen Elm trailer park demolition area. Starting to rip up the roads. All the power poles are still up. Took a video in addition to photos.

https://www.youtube.com/watch?v=zj1tMAvREUM

https://www.flickr.com/photos/reginaconstruction/





Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 8:13 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.