  #4161  
Old Posted Oct 15, 2014, 3:46 PM
Drybrain Drybrain is offline
Registered User
 
Join Date: Sep 2012
Posts: 4,542
Quote:
Originally Posted by halifaxboyns View Post
People are going to complain no matter what.
So at this point it doesn't matter whether you do something or not...

Personally; I'd rather have a narrow street with something decorative that attempts to do something rather than nothing. Parking in this area is shot anyway...until construction is over. Short term pain for long term gain.
Deliveries to the local business can still be accommodated. I know that was an important issue to address. As far as through-traffic being reduced, it's Argyle Street—it's for bar-hopping and people-watching, not getting from A to B. It should probably become a more fully shared street anyway, with equal priority to cars, pedestrians, etc.
Reply With Quote
     
     
  #4162  
Old Posted Oct 16, 2014, 10:15 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Ziobrop has some great interior shots on his tumblr page - http://novacenter.builthalifax.ca/ - showing the first tub girder that has been installed.

In this picture by Ziobrop - http://31.media.tumblr.com/887c4c2b1cdcc14e022c54ee6758fcb2/tumblr_ndjnv0IYpR1sjmgsso1_1280.jpg - is shown what appears to be bearing plates similar to bridge bearing plates - http://civildigital.com/types-functions-bearings-bridges/. Here is another view before the girder was hoisted in place - http://novacenter.builthalifax.ca/post/100000276713; in this picture it appears to be resting on 4" x 4" wooden posts, which gives a good idea of the size.

I am very interested in knowing how they plan to support the Ballroom floor, which is two stories above the tub girders (supporting the ceiling of the Exhibit Hall).

Last edited by fenwick16; Oct 16, 2014 at 11:37 PM.
Reply With Quote
     
     
  #4163  
Old Posted Oct 17, 2014, 1:06 AM
gm_scott's Avatar
gm_scott gm_scott is offline
Registered User
 
Join Date: Nov 2007
Location: Nova Scotia
Posts: 181
Does anyone have a link to the floor plans? I've looked through the thread a little and there are just so many pages.
Reply With Quote
     
     
  #4164  
Old Posted Oct 17, 2014, 2:21 AM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by fenwick16 View Post
Ziobrop has some great interior shots on his tumblr page - http://novacenter.builthalifax.ca/ - showing the first tub girder that has been installed.

In this picture by Ziobrop - http://31.media.tumblr.com/887c4c2b1cdcc14e022c54ee6758fcb2/tumblr_ndjnv0IYpR1sjmgsso1_1280.jpg - is shown what appears to be bearing plates similar to bridge bearing plates - http://civildigital.com/types-functions-bearings-bridges/. Here is another view before the girder was hoisted in place - http://novacenter.builthalifax.ca/post/100000276713; in this picture it appears to be resting on 4" x 4" wooden posts, which gives a good idea of the size.

I am very interested in knowing how they plan to support the Ballroom floor, which is two stories above the tub girders (supporting the ceiling of the Exhibit Hall).
These tub girders will hold up the grafton level slab. There will be columns to hold up the market level slab and the ballroom. I'm not positive how the ballroom floor will span Grafton but will see if I can get an answer
Reply With Quote
     
     
  #4165  
Old Posted Oct 17, 2014, 2:22 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by gm_scott View Post
Does anyone have a link to the floor plans? I've looked through the thread a little and there are just so many pages.
Here are the floor plans for the rentable space - http://www.halifaxconventioncentre.com/images/uploads/HCC_Floor-Plans.pdf - but it doesn't include service areas such as kitchen, loading areas, administration and public lobbies.
Reply With Quote
     
     
  #4166  
Old Posted Oct 17, 2014, 2:36 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
These tub girders will hold up the grafton level slab. There will be columns to hold up the market level slab and the ballroom. I'm not positive how the ballroom floor will span Grafton but will see if I can get an answer
In particular, I am wondering if the tub girders can support the two levels above Grafton Street and Ballroom or if the steel columns between the levels will act as stiffeners for the tub girders, almost like trusses on a bridge - http://courses.washington.edu/engr100/All_Sections/Bridge/HTML%20Handouts/01_hnd_BridgeIntro.htm? It will be very interesting to watch your tumblr blog and see if the tub girders alone can support that much weight.
Reply With Quote
     
     
  #4167  
Old Posted Oct 17, 2014, 12:22 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by gm_scott View Post
Does anyone have a link to the floor plans? I've looked through the thread a little and there are just so many pages.
Here are the plans that were submitted for DA Approval. they are probably still on the HRM website somewhere, but i saved a copy and posted them.

http://halifaxbloggers.ca/builthalifax/w...9322AttachmentASitePlanApprovalPlans.pdf
Reply With Quote
     
     
  #4168  
Old Posted Oct 17, 2014, 12:36 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by fenwick16 View Post
In particular, I am wondering if the tub girders can support the two levels above Grafton Street and Ballroom or if the steel columns between the levels will act as stiffeners for the tub girders, almost like trusses on a bridge - http://courses.washington.edu/engr100/All_Sections/Bridge/HTML%20Handouts/01_hnd_BridgeIntro.htm? It will be very interesting to watch your tumblr blog and see if the tub girders alone can support that much weight.
The tub girders were engineered to be self sufficient and carry all the load above. The girders and slab are basically the same as a highway overpass, except in this case they will carry more building, instead of cars and trucks.

My understanding is that they looked into various truss options, but they would have been too big, or there was too much movement and vibration
Reply With Quote
     
     
  #4169  
Old Posted Oct 17, 2014, 11:11 PM
gm_scott's Avatar
gm_scott gm_scott is offline
Registered User
 
Join Date: Nov 2007
Location: Nova Scotia
Posts: 181
Quote:
Originally Posted by Ziobrop View Post
Here are the plans that were submitted for DA Approval. they are probably still on the HRM website somewhere, but i saved a copy and posted them.

http://halifaxbloggers.ca/builthalifax/w...9322AttachmentASitePlanApprovalPlans.pdf
Thank you. Exactly what I was looking for.
Reply With Quote
     
     
  #4170  
Old Posted Oct 18, 2014, 3:29 AM
teddifax's Avatar
teddifax teddifax is offline
Halifax Promoter!
 
Join Date: Jul 2012
Location: Halifax
Posts: 1,112
Stil no rumours on the hotel.....
Reply With Quote
     
     
  #4171  
Old Posted Oct 19, 2014, 2:26 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
I hoped that there would be another tub girder at the construction site, but so far there isn't - http://www.novascotiawebcams.com/en/webcams/nova-centre/ (11;30 am Atlantic time). Maybe Ziobrop knows what day the next one will be delivered?
Reply With Quote
     
     
  #4172  
Old Posted Oct 19, 2014, 7:37 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by fenwick16 View Post
I hoped that there would be another tub girder at the construction site, but so far there isn't - http://www.novascotiawebcams.com/en/webcams/nova-centre/ (11;30 am Atlantic time). Maybe Ziobrop knows what day the next one will be delivered?
I don't .. I'd guess Monday. I think they are finished with the first. The next one will be assembled on the rack then rolled to the far side..
Reply With Quote
     
     
  #4173  
Old Posted Oct 19, 2014, 8:51 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
I don't .. I'd guess Monday. I think they are finished with the first. The next one will be assembled on the rack then rolled to the far side..
I just noticed a couple of pictures on your tumblr blog - http://novacenter.builthalifax.ca/ - that show temporary beams that the large tub girders will be rolled along.

http://novacenter.builthalifax.ca/post/98812852788/temp-beams-to-roll-trusses
http://novacenter.builthalifax.ca/post/98801599618

and I assume on the opposite side the girders will be rolled along the ledge that they will be fastened to:

http://novacenter.builthalifax.ca/post/98231975053
http://novacenter.builthalifax.ca/post/100164642733

Thanks again Ziobrop for all the interesting construction pictures. Hopefully there will be a way to preserve some or all of these digital pictures for future generations of construction enthusiasts.
Reply With Quote
     
     
  #4174  
Old Posted Oct 20, 2014, 12:26 AM
Colin May Colin May is offline
Registered User
 
Join Date: Mar 2014
Posts: 1,569
Quote:
Originally Posted by fenwick16 View Post
I just noticed a couple of pictures on your tumblr blog - http://novacenter.builthalifax.ca/ - that show temporary beams that the large tub girders will be rolled along.

http://novacenter.builthalifax.ca/post/98812852788/temp-beams-to-roll-trusses
http://novacenter.builthalifax.ca/post/98801599618

and I assume on the opposite side the girders will be rolled along the ledge that they will be fastened to:

http://novacenter.builthalifax.ca/post/98231975053
http://novacenter.builthalifax.ca/post/100164642733

Thanks again Ziobrop for all the interesting construction pictures. Hopefully there will be a way to preserve some or all of these digital pictures for future generations of construction enthusiasts.
Donate the photos to Heritage Trust and get a tax receipt.
Or NS Archives.
Reply With Quote
     
     
  #4175  
Old Posted Oct 20, 2014, 2:58 AM
musicman musicman is offline
Registered User
 
Join Date: Nov 2008
Posts: 270
Donate them to Heritage Trust... LOL It is kinda ironic that at some point in the distant future they may be fighting the same fight to "preserve the Nova Center"...
Reply With Quote
     
     
  #4176  
Old Posted Oct 20, 2014, 12:12 PM
OldDartmouthMark OldDartmouthMark is offline
Registered User
 
Join Date: May 2010
Posts: 10,329
Quote:
Originally Posted by musicman View Post
Donate them to Heritage Trust... LOL It is kinda ironic that at some point in the distant future they may be fighting the same fight to "preserve the Nova Center"...
To further the irony, some members of this very forum who currently deride the HT will probably be joining in the fight...
Reply With Quote
     
     
  #4177  
Old Posted Oct 20, 2014, 11:05 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
I don't .. I'd guess Monday. I think they are finished with the first. The next one will be assembled on the rack then rolled to the far side..
Good guess. I saw that there were a couple of sections of the next tub girder on site today - http://www.novascotiawebcams.com/en/webcams/nova-centre/ .
Reply With Quote
     
     
  #4178  
Old Posted Oct 21, 2014, 2:21 PM
Duff's Avatar
Duff Duff is offline
Registered User
 
Join Date: Oct 2012
Location: West End Halifax
Posts: 337
Some photos I took today.





Reply With Quote
     
     
  #4179  
Old Posted Oct 21, 2014, 3:23 PM
mcmcclassic's Avatar
mcmcclassic mcmcclassic is offline
BUILD!
 
Join Date: Dec 2009
Location: Edmonton
Posts: 432
Great pics Duff. I can't help but notice how dumb that "art barrier" is... Did the people who installed it think about what will happen when the building is 1-2 floors taller than it?

Reply With Quote
     
     
  #4180  
Old Posted Oct 22, 2014, 2:37 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558

Great looking pictures. The first picture shows so much detail. You got a good perspective of the TD Bank tower expansion also.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 4:02 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.