Quote:
Originally Posted by sentinel
Western core is at level 68, as of Sunday 7/29
|
That puts top out around Jan 1 if they work a 1.5 floors a week pace. Assuming things slow for concrete complexity at the top of the middle segment, the blow through, and the dampeners, I wouldn't be surprised if top out was more like February.