  #21  
Old Posted May 3, 2023, 5:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
The NE corner ground floor slab is now poured. Forming for the north end wing ground floor slab under way now.
Reply With Quote
     
     
  #22  
Old Posted May 14, 2023, 8:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Ground floor slab is now complete and steel rebar for ground floor walls and posts is starting on the north end. The south end has forming already started for the 3rd floor slab.
Reply With Quote
     
     
  #23  
Old Posted May 22, 2023, 7:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Ground floor walls and posts are now poured and forming is going up for 2nd floor slab in the NE corner. The next phase immediately east of the 6s building has also started with heavy equipment installing sewers and water mains and other underground utilities.
Reply With Quote
     
     
  #24  
Old Posted May 26, 2023, 8:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Excavation for foundation footings is now starting for the 5s building. Pouring some more of the 2nd floor walls and posts in the 6s and forming for the 2nd floor slab on the north end.
Reply With Quote
     
     
  #25  
Old Posted Jun 7, 2023, 3:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now got some of the foundation footings poured for the west end 5s building. They have poured some of the 2nd floor posts in the NE end of the 6s retirement building and are starting to form 3rd floor walls and posts on the south end. Now that they are above ground this 6s building should go up a floor every month.
Reply With Quote
     
     
  #26  
Old Posted Jun 22, 2023, 11:39 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now poured the south end foundation walls and are continuing the forming of the footings for the 5s building immediately east of the 6s. The 6s building has now got the 2nd floor slab completed and forming for the 2nd floor walls and posts is well under way on the north end. The south end has the 3rd floor slab poured now and forming well under way for the 3rd floor walls and posts.
Reply With Quote
     
     
  #27  
Old Posted Jun 26, 2023, 7:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
A higher rez render of the 6s Bloom London Retirement Residence building on the construction management companies website. Fieldgate Construction Management Ltd.



https://fieldgateconstruction.com/pr....php#container
Reply With Quote
     
     
  #28  
Old Posted Jun 28, 2023, 6:33 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115
Quote:
Originally Posted by jammer139 View Post
A higher rez render of the 6s Bloom London Retirement Residence building on the construction management companies website. Fieldgate Construction Management Ltd.

https://fieldgateconstruction.com/pr....php#container

Bloom Retirement Community 3050 Tillman Rd, London Ontario
Reply With Quote
     
     
  #29  
Old Posted Jul 29, 2023, 3:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now completed all the 3rd floor walls and posts on the 6s building. Have got the 4th floor poured and forming on the south end and forming started in the NE corner. The 5s building to the east is now getting the first floor walls built using concrete block. The second 5s building east of that is getting the concrete footings forming started now as well
Reply With Quote
     
     
  #30  
Old Posted Aug 18, 2023, 4:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Have now completed the 4th floor slab pour. Have got most of the 4th floor walls and posts formed and poured on the north-south wing. The 5s apartment building immediately east has nearly completed the ground floor concrete block walls and they are installing structural steel posts as well. Suspect they might use precast floor slabs for the floors and the combination of structural steel posts and concrete blocks.
Reply With Quote
     
     
  #31  
Old Posted Sep 2, 2023, 12:18 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Now forming the 4th floor walls and posts in the north wing and the 5th floor slab on the south end of the 6s retirement building. The 5s apartment to the east now has some of the 2nd floor precast floor slabs installed and 2nd floor concrete block walls built.
Reply With Quote
     
     
  #32  
Old Posted Sep 6, 2023, 1:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Agar Architects website with renders of the 2 five story rental buildings.


https://agar-architect.ca/project/1137/
Reply With Quote
     
     
  #33  
Old Posted Sep 20, 2023, 2:32 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now completed the 5th floor slab pour on the west wing of the retirement building. Also have most of the 5th floor walls and posts poured now on the south end. The 2nd floor precast slabs are all installed now for the 5s rental building to the east and have the south end 2nd floor concrete block walls built as well.
Reply With Quote
     
     
  #34  
Old Posted Sep 27, 2023, 7:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now completed the 5th floor walls and posts and forming on the south end of the 6th floor slab is now done on the 6s retirement building. The 5s rental building now has the 2nd floor concrete block walls built and they have started landing the 3rd floor precast concrete slabs on the south end. They have already started building the townhouses on the south end of the property.
Reply With Quote
     
     
  #35  
Old Posted Oct 9, 2023, 4:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now poured some of the 6th floor walls and posts on the south end of the retirement building and have completed forming for the 6th floor slab for the remainder. Almost have all the 3rd floor precast floor slabs installed on the 5s apartment building to the east.
Reply With Quote
     
     
  #36  
Old Posted Oct 25, 2023, 4:18 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
The 6s retirement building now has the roof slab formed on the south end and the north wing has started forming for the 6th floor walls and posts. The 5s rental building to the east now has the south end 3rd floor concrete block walls built and they have started building the 3rd floor concrete block walls for the north wing. Quite alot of the townhouses on the south side of this property are now fully framed out as well.

Last edited by jammer139; Oct 26, 2023 at 1:31 PM.
Reply With Quote
     
     
  #37  
Old Posted Nov 24, 2023, 9:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
Forming posts for the mechanical penthouse on the 6s retirement building now. Exterior wall framing is started on the lower floors. The 5s apartment building to the east is now getting the 4th floor concrete block walls built with about 60% now done. The townhouses on the south side are really moving along with only a few left to finish framing for the 2nd floors and roof.

Last edited by jammer139; Nov 24, 2023 at 10:26 PM.
Reply With Quote
     
     
  #38  
Old Posted Dec 8, 2023, 4:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have completed the 4th floor concrete block walls of the 5s apartment building and have over 60% of the 5th floor precast slabs installed. Have even got some of the 1st floor window modules installed.

Last edited by jammer139; Dec 9, 2023 at 5:09 PM.
Reply With Quote
     
     
  #39  
Old Posted Dec 26, 2023, 10:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have built the 5th floor concrete block walls now on the south wing of the 5s rental building and have started installing window units on the ground floor level. The 6s retirement building has now got some windows installed up to the 3rd floor level.
Reply With Quote
     
     
  #40  
Old Posted Jan 5, 2024, 12:39 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,048
They have now removed the south tower crane from the 6s retirement building leaving only the north tower crane standing for now.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:38 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.