HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Apr 15, 2015, 2:16 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,919
if we were talking platform renovations I could list like 10 more large TTC projects going on right now, I think its best to leave it to just expansion.
Reply With Quote
     
     
  #22  
Old Posted Apr 15, 2015, 2:30 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I didn't say platform renovation, I said platform expansion. Makes sense though.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #23  
Old Posted Apr 15, 2015, 5:39 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Yeah I think it's best to keep this thread just for new lines, as the transit thread is great for all the other projects.
Reply With Quote
     
     
  #24  
Old Posted Apr 15, 2015, 1:48 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Transferred
Quote:
Originally Posted by 1overcosc View Post
Some pictures I took today of the Confederation Line construction in Ottawa.

First off, the east tunnel portal:
This is where the trains will descend into the downtown tunnel from the east.


Next I headed west to the area around the future Pimisi station, just west of where the underground tunnel starts/ends.

This is the excavation for the future Pimisi station.



I took this picture standing directly atop the not-yet-built tracks. This is looking east, from just east of the future Pimisi Station towards the tunnel portal, which is a few hundred metres ahead.

Reply With Quote
     
     
  #25  
Old Posted Apr 15, 2015, 3:01 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,352
Quote:
Originally Posted by SkahHigh View Post
As soon as it's U/C I'll add it to the list.
Design work is ongoing right now.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
Reply With Quote
     
     
  #26  
Old Posted Apr 15, 2015, 6:47 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 24,312
From today's Record, the statue of a young William Lyon Mackenzie King sits outside his former high school, Kitchener-Waterloo Collegiate Institute, watching ion construction on King St W.


Peter Lee,Record staff
Reply With Quote
     
     
  #27  
Old Posted Apr 15, 2015, 10:44 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Canmore, AB
Posts: 67,564
Quote:
Originally Posted by SkahHigh View Post
Do you have more details about the Valley line?
Blue line

*Red line to the west will follow.


(http://mastermaq.s3.amazonaws.com/pu...ew/lrt_wse.gif)

Ride the line, video

http://www.4lrt.com/portfolios/expan...cept/?pnt=2892

About the Project
The Valley Line (Southeast to West Light Rail Transit) is a low-floor urban line that will run from Mill Woods to Lewis Farms, crossing through downtown. The line runs a total length of 27 km and its route has been approved by City Council. Public input helped shape the route, stop/station locations and other details during the Concept Planning phase. During the Preliminary Design stage from February 2012 to November 2013, public engagement helped shape the design philosophy and aesthetic for the Valley Line LRT, providing the City of Edmonton with invaluable knowledge about the communities the LRT will eventually serve.

On March 11, 2014, at an event in Churchill Station, the provincial government announced its funding commitment to the Southeast portion of Valley Line LRT Project. With the final funding piece in place--pending Council's approval of the overall funding strategy--the 13 km Valley Line (Mill Woods to Downtown) is now free to proceed. Thanks in part to timely commitments by our provincial and federal partners, the Valley Line will remain on schedule for a construction start of 2016, aiming to be open to the public by the end of 2020.

The province has agreed to contribute $250 million in Green Trip funding, $150 million in additional funding, and $200 million in a 10-year interest free loan. This joins the City's own contribution of $800 million, along with the federal government's contribution of $250 million from PPP Canada and an expected $150 million through the Building Canada Fund.

http://www.edmonton.ca/transportatio...wis-farms.aspx
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #28  
Old Posted Apr 15, 2015, 10:52 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,271
Nice to see the limited amount of park and rides included. For all the mistakes that have been made under the veil of making the line more "urban" so far, fewer park and rides is actually a legitimate way of doing so.
Reply With Quote
     
     
  #29  
Old Posted Apr 15, 2015, 11:22 PM
Dr Awesomesauce's Avatar
Dr Awesomesauce Dr Awesomesauce is offline
Registered User
 
Join Date: Jan 2010
Location: BEYOND THE OUTER RIM
Posts: 5,889
Quote:
Originally Posted by kwoldtimer View Post
From today's Record, the statue of a young William Lyon Mackenzie King sits outside his former high school, Kitchener-Waterloo Collegiate Institute, watching ion construction on King St W.


Peter Lee,Record staff
Probably wondering why it was ripped out in the first place...
Reply With Quote
     
     
  #30  
Old Posted Apr 15, 2015, 11:56 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 24,312
Quote:
Originally Posted by Dr Awesomesauce View Post
Probably wondering why it was ripped out in the first place...
Indeed. I remember my mother telling me that she used to take the streetcar through Downtown and on to KCI, in the late '30s-early 40s.
Reply With Quote
     
     
  #31  
Old Posted Apr 16, 2015, 1:20 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,060
Quote:
Originally Posted by SkahHigh View Post
Since we have a few LRT/rapid transit projects under construction right now and some more planned in the future, I suggest we make a specific thread where users can post construction updates of listed projects instead of doing it in one big transit thread with other modes.

Here's the list.

Under construction

1. NAIT line (ETS) - 3 stations - 3.3km - 2015
2. Evergreen line (TransLink) - 6 stations - 11km - 2016
3. Ion (Grand River Transit) - 16 stations - 19km - 2017
4. Yonge/Spadina Extension (TTC) - 6 stations - 8.6km - 2017
5. Confederation line (OC Transpo) - 13 stations - 12.5km - 2018
6. Eglinton Crosstown (Metrolinx) - 25 stations - 19km - 2020
Love this idea, but just a few ideas to add to it.

Can we have the location (metro area names) added for each line.

Also, can we add a simple title for technology type to each project as well?

Maybe use the following: Metro (fully grade separated), Partial at grade LRT (if more than half of the line is grade separated), At grade LRT (over half is at grade), Other at grade urban rail (trams), HRT Commuter Rail (not sure if this is included on this thread).
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #32  
Old Posted Apr 16, 2015, 2:26 AM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by Metro-One View Post
Love this idea, but just a few ideas to add to it.

Can we have the location (metro area names) added for each line.

Also, can we add a simple title for technology type to each project as well?

Maybe use the following: Metro (fully grade separated), Partial at grade LRT (if more than half of the line is grade separated), At grade LRT (over half is at grade), Other at grade urban rail (trams), HRT Commuter Rail (not sure if this is included on this thread).
The city/metro is a good idea but for the technology I don't know if we should include categories... Most of them are either LRT or subway.

Last edited by SkahHigh; May 6, 2015 at 12:45 PM.
Reply With Quote
     
     
  #33  
Old Posted Apr 16, 2015, 2:46 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,060
Well maybe a more simple classification then*

Fully grade separated

Non fully grade separated

Commuter Rail

This is an important distinction used in many transit articles / ranking systems.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #34  
Old Posted Apr 16, 2015, 2:50 AM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by Metro-One View Post
Well maybe a more simple classification then*

Fully grade separated

Non fully grade separated

Commuter Rail

This is an important distinction used in many transit articles / ranking systems.
Yeah we can do that if you can distinguish them. There's no commuter rail here though.
Reply With Quote
     
     
  #35  
Old Posted Apr 16, 2015, 3:34 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,060
Evergreen Line is fully grade separated.

Younge / Spadina is fully grade separated (99% sure).

Confederation Line is fully grade separated (90% sure).

The rest are Non fully grade separated I think.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #36  
Old Posted Apr 16, 2015, 3:38 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,919
yup, those 3 are fully seperated.
Reply With Quote
     
     
  #37  
Old Posted Apr 19, 2015, 10:22 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Transferred
Quote:
Originally Posted by caltrane74 View Post
www.vikpahwa.com

Tunnel Boring Machine - Eglinton West


Last edited by SkahHigh; Apr 19, 2015 at 10:33 PM.
Reply With Quote
     
     
  #38  
Old Posted Apr 19, 2015, 11:25 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,193
Yeah, the Eglinton Line is not full grade seperated yet it is the most expensive transit project in Canadian History (no inflation of course) But a large part of that is due to the 12 km of underground construction through midtown Toronto. This weekend saw the tunnel boring machine come above ground level for the first time since it went into the ground at Black Creek near the Etobicoke border on the western edge of the city. I'm not 100% but once the Tunnel Boring Machine gets to Yonge and Eglinton it will have to come above ground again before it continues it journey onto Don Mills, one suburban block away from the Scarborough border at Victoria Park, where the line will run at Street level until it hits Kennedy Road.
Reply With Quote
     
     
  #39  
Old Posted Apr 20, 2015, 2:46 PM
The_Architect's Avatar
The_Architect The_Architect is offline
Registered User
 
Join Date: Oct 2010
Location: Toronto, ON
Posts: 3,385
^ I thought there were 2 other TBMs that entered in the east portal and they would all meet at Yonge?
__________________
Hope is the quintessential human delusion, simultaneously the source of our greatest strength, and our greatest weakness.
Reply With Quote
     
     
  #40  
Old Posted Apr 20, 2015, 4:06 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,193
Quote:
Originally Posted by The_Architect View Post
^ I thought there were 2 other TBMs that entered in the east portal and they would all meet at Yonge?
YEs, yes! All 4 TBM's get EXTRACTED at Yonge-Eglinton!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 10:09 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.