I'm really glad the the city spent money on putting in that turning lane instead of something else like bike lanes.
Reply With Quote
     
     
  #22  
Old Posted Jan 8, 2021, 4:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Well 2020 came and went and this 10s proposal has had no activity. Not sure if the developer has abandoned the project at this point.
Reply With Quote
     
     
  #23  
Old Posted Jan 27, 2021, 9:32 PM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,744
Signs of life here. Saw some Stuart Olson trucks and either a construction trailer or sea container on site today.
Reply With Quote
     
     
  #24  
Old Posted Feb 6, 2021, 4:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Good to see. They have a post on their website.


https://www.stuartolson.com/showcase/private-sector/


8 story Seasons Retirement home
Reply With Quote
     
     
  #25  
Old Posted Mar 15, 2021, 9:38 PM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,744
Crane base is now installed.
Reply With Quote
     
     
  #26  
Old Posted Mar 16, 2021, 3:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Yes and parade of dump trucks hauling away soil for pit excavation. Not sure if they are doing 1 or 2 levels of underground parking. The original proposal was for a 10s building but they reduced that to 8s.
Reply With Quote
     
     
  #27  
Old Posted Mar 22, 2021, 8:15 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Tower crane is now up. Excavation of pit continues with dump trucks coming and going. Appear to have started forming for foundation in NE corner already.
Reply With Quote
     
     
  #28  
Old Posted Mar 31, 2021, 8:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Major concrete pour today with a couple of pump trucks and parade of cement trucks.
Reply With Quote
     
     
  #29  
Old Posted Apr 2, 2021, 2:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
They poured the east half of the L1 level slab. The west half is being prepared with steel rebar and should be poured soon. They are moving fast with this site.
Reply With Quote
     
     
  #30  
Old Posted Apr 16, 2021, 7:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Looks like they have poured the west end L1 slab now. Should see steel and forming of L1 walls starting next week.
Reply With Quote
     
     
  #31  
Old Posted Apr 28, 2021, 6:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Some of the ground floor posts and walls now formed on east end of building.
Reply With Quote
     
     
  #32  
Old Posted May 12, 2021, 9:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Most of the ground floor posts are now poured. Now forming what appears to be stairwell or elevator shaft walls on east end.
Reply With Quote
     
     
  #33  
Old Posted Jun 25, 2021, 11:23 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Now forming for 2nd floor slab on east end of building. Ground floor has extra height for common areas.
Reply With Quote
     
     
  #34  
Old Posted Jul 24, 2021, 4:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Have now poured the 2nd floor slab on the east side of building and even have a few of the 2nd floor posts poured. No forming yet for 2nd floor slab on the west end.
Reply With Quote
     
     
  #35  
Old Posted Aug 14, 2021, 9:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Still have not setup the 2nd floor slab forms on the west side of building. Oddly enough they have a few more of the 2nd floor walls and posts poured on the east side.
Reply With Quote
     
     
  #36  
Old Posted Aug 31, 2021, 1:54 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Finally poured the 2nd floor slab on the west end of building. Have around 40% of the 2nd floor walls and posts poured on the east side now.
Reply With Quote
     
     
  #37  
Old Posted Sep 14, 2021, 3:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Pouring some of the 3rd floor slab on the east end of building.
Reply With Quote
     
     
  #38  
Old Posted Sep 25, 2021, 2:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Got a couple of the 3rd floor posts poured now on the east side. Still forming for the 3rd floor slab on the west side of building.
Reply With Quote
     
     
  #39  
Old Posted Oct 15, 2021, 4:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
3rd floor slab is now poured. Well along with more then half of the 3rd floor walls and posts also poured.
Reply With Quote
     
     
  #40  
Old Posted Oct 25, 2021, 8:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,041
Have now got some of the 4th floor walls and posts formed on the east end as they finish up the 3rd floor walls on the west end.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 6:33 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.