Quote:
Originally Posted by nazrey
|
KTM ETS - Intercity train connection with Klang Valley integrated transit system
Operated by KTM (Keretapi Tanah Melayu) | National Railway of Malaysia
Speed: 140-160 km/hr
Total Length: 755 km (as of 2021)
Extension Project: 192 km (2023)
Code:
STATION CONNECTION LINE
Tanjung Malim Line 2
Batang Kali Line 2
Rawang Line 2
Sungai Buloh Line 2, 12
Kepong Sentral Line 2, 12
Kuala Lumpur Line 1, 2
KL Sentral Line 1, 2, 5, 6, 7, 8, 9, 10, Seremban Express
Bandar Tasik Selatan Line 1, 4, 7
Kajang Line 1, 9
Seremban Line 1
Pulau Sebang Line 1
https://upload.wikimedia.org/wikiped...cropped%29.jpg