Quote:
Originally Posted by Plokoon11
The crown is different on the right image.
|
Quote:
Originally Posted by gw04
The image on the left is nearest the actual building. Construction of the core is already past the 13 pods (with the diagonal bars). Steel looks like it's around the 9th pod; if so, 3 office pods to go plus the cafeteria/atrium section. It looks like they are now about 10 floors above the office section for the core, now nearing the top of the hotel floors. So, it would seem like they are around floor 54 with the core. Not many more core floors to go.
|
Yes. I am agreeing with that. And yes, the crown is certainly different. I wasn't sure if those last 3 floors (without the diagonal bars) were the start of the hotel, (like maybe the lobby?) but either way, whether it's the cafeteria/atrium for Comcast, they are in both renderings. Although, I have to admit, the rendering on the right sure is pretty. And it is in the more realistic environment. The rendering on the right does seem much shorter, and that's when I started counting. Someone else had brought that up a while back, and I just wanted to see if there was any more mention of this.
Thanks for the input guys!