Quote:
Originally Posted by k1052
My recollection is that the plan is for a sterile walking connection from the satellite terminal to T2.
|
Correct. I also don't think the train itself will come until S2 is built. It'll just be two segregated corridors with the plan to eventually convert the domestic one to a train between OGT, S1 and S2 (if/when that comes). I believe the international corridor will always be just for walking.
I'm a big fan of the design as shown - expectations exceeded. Someone who claims to be in the know over at airliners.net said that if you like this design then you will love the updated OGT design.