Quote:
Originally Posted by Sir.Humphrey.Appleby
Stations are going to cut off the busway far earlier than corridor construction will - unless you are going to build diversion busways around each station, it doesn't really matter how long it will take to build the converted sections. It is going to be at least 18 months of busway shutdowns, likely more like 2 and a half years no matter what due to station construction. The scale and scope of the stations don't lead to quick builds. Bayview can likely be worked around, but not Tunney's. East end the Transitway is not going to usable either, for the same reason - and jumping in and out is likely worse than just running along the 417.
|
I guess I must have a far more pragmatic mindset or something.
The stations are currently four lanes wide. The tracks will go in the central passing lanes, with the platforms built out into the current curb stopping lanes. It would therefore be entirely within the realm of the possible to install tracks in the passing lanes well in advance of conversion of the rest of the transitway.
Since the stations are currently about 60 m in length and they have to be lengthened to 120 m, a lot of that work can take place while the stations are still in operation. That work can include installing new stairwells and new elevators, if necessary, allowing for the existing ones to be closed and then reconfigured/replaced/removed later on once light rail is running.
Basically, you just need to be able to figure out a way to create fast, temporary platforms in the curb lanes that can be gradually replaced once light rail is operating. This summer, we had temporary platforms downtown consisting of parking curbs holding back an asphalt platform. Something similar could be done for light rail, perhaps involving the use of sunken and/or cut-off New Jersey barricades with a suitable backfill and asphalt topping.
Quote:
|
It is going to be hell for sure, but it will just make the end goal that much sweeter. There isn't some magic infrastructure fairy that can build the rest of the system over the course of a summer once the tunnel is done. It isn't going to happen.
|
If we take an attitude that perfection is expected on day one, then yes, massive delays and disruption in the meantime will be what we get. But if we take a far more pragmatic approach and are willing to put up with minor inconveniences after as well as before the changeover, then it's possible we can avoid excessive disruption. Everything that can reasonably be done while the buses are operating should be done so as to minimize the period of shutdown.
For example, to electrify, instead of shutting down the transitway, digging it up and planting the poles down the middle of the transitway they can be installed as side-mounted poles while the transitway remains operational. We should even look into using diesel-electric dual-mode light rail vehicles that would allow light rail to take over without full electrification.