Quote:
Originally Posted by djh
What the hell is going on with this project? Wasn't the exterior of this building ready before the Winter Olympics? In 2010?! And I remember soon after the Olympic Village became accessible to the public, there were signs papered over the windows saying there was a restaurant going in.
Two Years Later...?!
|
Few things... first... the interior restaurant requirements have never been built out. The building is basically a shell, a great one at that. Second, Mark James Group (Yaletown Brewing, Brewhouse (Whistler), Big Ridge Brewing, & Flying Beaver) was apparently supposed to be the lessee, but pulled out amidst the post-olympic challenges... as did Urban Fare (at least until they renegotiated their lease terms). Craft Beer Market the signed lessee only committed sometime in September or October, so if they are in fact open in Summer 2013, that's not a bad timetable, especially given the size of the space!