Wrapping up the mechanical penthouse roof slab and concrete forming operations on the north tower. This is officially topped out.
Have now got the window and balcony modules installed up to the 27th floor and the exterior construction elevator extended upto the roof level. Should see the roofing contractor start work on the roof soon and the HVAC chiller unit lifted to the rooftop.