Compilation from that article. If all this stuff happens, we'll probably end up having the biggest decade for skyscraper construction ever in Austin. And this is just the stuff we know about, and actually, this article missed some of the smaller projects in the 10 to 12 floor range. And this is only for downtown. This isn't even including West Campus projects and what might be built at University Park and the South Shore, plus other projects around town such as at Mueller or the Domain.
Projected Start dates:
18 high rises total in this list that might be starting construction in the next year or two. Most of them will be starting this year or next. And again, this only for downtown!
Gables Park Plaza II - 18 floors (Under construction)
3rd & Brazos - 16 floors (under construction)
SkyHouse - 23 floors (Start July 2012)
Colorado & 3rd - 30 floors (Start late 2012)
The Fairmont Austin - 48 floors (Start Spring 2013)
JW Marriott - 33 floors - (Start June 2012 "summer" by article's quote)
Rainey Center - 50 floors (two buildings) - (Start Undetermined)
Seaholm Plaza Apartments - 28 floors - (Start Late July)
Austin Energy Control Center Site - 30-40 floors (two towers) - (Start 2014 - 2015)
Green Water Site - Two 30 floor towers, 28 floor tower and 17 floor tower - (Start early 2013)
Future Whole Foods Headquarters - 20 floors - (Start late 2013)
3 eleven Bowie - 36 floors - (Start third quarter this year)
IBC Bank Plaza - 13 floors - (Start December 2012)
EDIT - Looks good, Bevo. Thanks.