Quote:
Originally Posted by Kngkyle
The detention pond is certainly not in the way of S-1, which is where I see most of the ground work being done (since it's actually visible from C concourse). But yea, super unclear what is actually going on.. which sadly is the norm with the CDA.
|
Well, and the only way anyone can confirm is by searching by bid award websites, or hoping your plane taxis close enough to this area to try to figure out what's going on.
Yeah, for sure, they could start work on S1, but I wasn't sure if they were going to do both at the same time, or one at a time. I was assuming they were going to do both at the same time.
On a side note - Hampton Social and Bar Siena are now open in T5, which is a welcome relief given the lack of dining options that were there. Below is an IG link showing Bar Siena.
https://www.instagram.com/p/C1uZU4LrSxx/