HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Closed Thread

 
Thread Tools Display Modes
     
     
  #3681  
Old Posted Feb 2, 2014, 5:14 AM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is online now
Volatile Pacivist
 
Join Date: Aug 2005
Location: Nova Scotia
Posts: 11,272
Those stupid one-way bus routes seem to be a staple of smaller cities. Pretty much all of Moncton's bus routes are one-way for at least part of the route. Fortunately Halifax only has a couple routes like that for any significant section, although several others have a short one-way section between the bridge and downtown.
__________________
"The reasonable man adapts himself to the world; the unreasonable one persists in trying to adapt the world to himself. Therefore all progress depends on the unreasonable man." - George Bernard Shaw
Don't ask people not to debate a topic. Just stop making debatable assertions. Problem solved.
     
     
  #3682  
Old Posted Feb 2, 2014, 5:58 AM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,939
Metrolinx buying yet more bi-levels is incredibly short-sighted.

Toronto doesn't need more monster diesel trains but rather single level electric one which have faster acceleration and even if diesel to begin with they are still MUCH quicker than bi-levels because they have more door, level boarding, and you don't have to wait till the people from the upper level of the train get down the stairs to depart.

As for the Evergreen Line, it's really coming along nicely.
     
     
  #3683  
Old Posted Feb 2, 2014, 6:34 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,849
Ok as long as you are wiling to give us the billions upon billions of dollars needed to upgrade go lines that typically run between 5-9 trips a day...

And it's not like they wait for people to come from the top level.. Have you ever riden in a bi-level coach? (They do have them in Vancouver you know) they all line up on the stairs to get off, having single level coaches wouldn't change boarding times too much unless you added more doors.

GO has looked at EMUs before and they typically save only around 4-5 minutes on a full line trip.

The only GO line with significant enough ridership for electrification really is lakeshore, and there are plans for that 10 or so years down the road. While there are no specifics on the project, one can presume that it won't use bi levels anymore regardless (at least for off peak, bi level haulers will probably still be used to handle peak loads)
     
     
  #3684  
Old Posted Feb 2, 2014, 6:38 AM
goodthings's Avatar
goodthings goodthings is offline
Registered User
 
Join Date: Sep 2010
Location: Gore Meadows, Brampton, ON
Posts: 197
Quote:
Originally Posted by miketoronto View Post
From York Region Transit. They are really giving the American transit systems a run for their money for poor service levels.

Feb 2014 Service Improvements:

ROUTE 7

Weekdays:
Frequency in the evening after 7 p.m. will be adjusted from
45 minutes to 90 minutes due to low ridership.
No change in span of change.

10 WOODBRIDGE
Weekdays:
Frequency in the evening after 7 p.m. will be adjusted from
45 minutes to 90 minutes
due to low ridership.

NEW ROUTE 15 STOUFFVILLE

Weekdays:
Weekday rush hour frequency will be every 70 minutes.


Saturdays and Sundays:
Frequency will be every 65 minutes. Service to only operate a few hours in the morning and afternoon. No midday service.

VIVA ORANGE
During evenings, frequency changes from 30 to 28 minutes.
HOO-WHAT?!?!?!!?

90-minute frequencies on routes like this? But again, this is YRT, with $4.00 one-zone cash fare, so what do we expect?

I like the splitting of Major Mack, Rutherford, and Leslie though. Really shows that the Vaughan section of these routes are well-used, and eastern Major Mackenzie really has low ridership.

Will check out the Spadina Subway Service Plan PIC on Monday only if I make it early on from work.
     
     
  #3685  
Old Posted Feb 2, 2014, 6:41 AM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,476
Quote:
Originally Posted by caltrane74 View Post
GO Transit Ordering 65 More Bi Level Trains From Bombardier

Wow, that would make the cab cars look like actual cabs!
     
     
  #3686  
Old Posted Feb 2, 2014, 6:45 AM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is online now
Volatile Pacivist
 
Join Date: Aug 2005
Location: Nova Scotia
Posts: 11,272
Quote:
Originally Posted by Innsertnamehere View Post

The only GO line with significant enough ridership for electrification really is lakeshore, and there are plans for that 10 or so years down the road. While there are no specifics on the project, one can presume that it won't use bi levels anymore regardless (at least for off peak, bi level haulers will probably still be used to handle peak loads)
The electrification feasibility study from a few years ago also recommended the Kitchener line be electrified and the section up to Brampton will be done at the same time as the airport train electrification.
__________________
"The reasonable man adapts himself to the world; the unreasonable one persists in trying to adapt the world to himself. Therefore all progress depends on the unreasonable man." - George Bernard Shaw
Don't ask people not to debate a topic. Just stop making debatable assertions. Problem solved.
     
     
  #3687  
Old Posted Feb 2, 2014, 11:46 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Lakeshore is going to electrified after the Airport/Kitchener Line, so says the province and Metrolinx. As for using EMU/DMU's bi-level/single level coaches, for me as long as it's electric it wont matter if the trains are bi level/or single level. Because with electric service, we can now basically have another metro line in Toronto that will be integrated with the TTC with the presto card.

Here are some pretty cool bi-level electric trains

caltrain - in California



bi level bullet train

     
     
  #3688  
Old Posted Feb 2, 2014, 1:07 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,795
Quote:
Originally Posted by vid View Post
A reminder that this is a bus route that existed:


Part of the reason for its failure was that the bus drivers forgot where it went and took the wrong turns. Also, there were no marked bus stops outside of the built-up part of the city, so no one really knew where or how to get on the bus.
That should surprise me, but it doesn't. Thunder Bay.... What more can be said?
     
     
  #3689  
Old Posted Feb 3, 2014, 4:19 AM
vid's Avatar
vid vid is offline
I am a typical
 
Join Date: Apr 2004
Location: Thunder Bay
Posts: 39,065
Quote:
Originally Posted by niwell View Post
^So ummm.. how DID people get on and off the bus?
To get on, they were expected to stand wherever there was room for the bus to safely pull over and wave it down. To get off, they just pulled the cord and as soon as it was safe to do so, the bus would pull them over and let them off.

I should also add, this route was served by one of our 40 foot buses. They get 5-8 miles per gallon and this route was something like 40 miles long.

Quote:
Originally Posted by Beedok View Post
That should surprise me, but it doesn't. Thunder Bay.... What more can be said?
They also brought back the South Neebing bus. I should add, both the route I posted and a similar route going south of the city both existed in the 1970s, since the province demanded the city provide all services to all parts of the city. We used to have a bus route that went to the local ski hill and to this day have rules about skis on buses.

This is the first draft of what will be going into place either this year or next:



There is no text because of how I extracted the image from the PDF it was in.

With a few exceptions, all routes will be entirely bidirectional. Most of our existing routes are as well but this will bring that to the next level.
     
     
  #3690  
Old Posted Feb 3, 2014, 5:19 AM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is online now
Volatile Pacivist
 
Join Date: Aug 2005
Location: Nova Scotia
Posts: 11,272
Quote:
Originally Posted by caltrane74 View Post

Here are some pretty cool bi-level electric trains

caltrain - in California

It should be mentioned that this isn't an actual Caltrain carriage, just an idea of what Caltrain electrified stock may look like if and when the service is actually electrified. Presently it's in the same boat as GO, as in hoping and dreaming of electrification, and seeing very real discussion from political leaders, but not actually started or about to start imminently.
__________________
"The reasonable man adapts himself to the world; the unreasonable one persists in trying to adapt the world to himself. Therefore all progress depends on the unreasonable man." - George Bernard Shaw
Don't ask people not to debate a topic. Just stop making debatable assertions. Problem solved.
     
     
  #3691  
Old Posted Feb 3, 2014, 5:56 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Metrolinx is completing the EA for electrifying the Kitchener Line/Airport Line. The environmental assessment is required for placing the substations to power the lines and trains, and study impact in the surrounding community. Metrolinx hopes to have the airport and lakeshore lines electrified in 10 years. The Sumitomo DMU/EMU's locomotives which have been purchased by Metrolinx can have upgrades made to modify them for electrification/electric rail service, along with the addition of the power catching photographs. The Kitchener Line/ Airport Line is will be electrification ready when the current work line upgrades are complete, the only thing required now is the power substations and overhead wiring.





The reason I chose the caltrain rendering is because, like you said it runs a system very similar to GO Transit. The only difference being California is far more car centric than Ontario, and that electrified GO Transit lines can serve as a relief to overcrowed subways, with higher frequency and more stops than the diesel units can currently handle. Metrolinx is investing billions of dollars in separating the commuter lines from freight and grade separating the lines in the GTA, all of which bodes well for an addition intra-city rail line to provide an assist to overwhelmed city transit, especially with the introduction of electrification. An electrified city rail project like this is just what the doctor ordered until the additional subway ring around the downtown core can be built. And can be done at a far more reasonable price than a subway as well.

Last edited by caltrane74; Feb 3, 2014 at 6:19 AM.
     
     
  #3692  
Old Posted Feb 3, 2014, 4:03 PM
north 42's Avatar
north 42 north 42 is online now
Registered User
 
Join Date: Apr 2011
Location: Windsor, Ontario/Colchester, Ontario
Posts: 5,933
This would be awesome if it was possible, a subway system that includes both Windsor and Detroit!

http://www.cbc.ca/news/canada/windsor/su...-windsor-it-s-all-just-fantasy-1.2520981
__________________
Windsor Ontario, Canada's southern most city!
     
     
  #3693  
Old Posted Feb 5, 2014, 11:54 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Airport Rail Link / New GO Transit Kitchener Line Construction Keeps Residents Up All Night

Quote:
[It was the latest skirmish involving residents along the train tracks and Metrolinx, the provincial agency in charge of expanding the rail corridor. They are the tracks where the Union Pearson Express train will run next year, and eventually, they will carry all-day, two-way GO service to Brampton and Georgetown.
The overnight construction was necessary to keep the project on its timetable, said Metrolinx spokesperson Anne Marie Aikins.
“We have lost time due to the severe weather we’ve had and we are committed to keeping this very important project on schedule,” she said.
     
     
  #3694  
Old Posted Feb 6, 2014, 1:44 AM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,823
4th ferry for Halifax is almost done. It'll start service in May:


Source
     
     
  #3695  
Old Posted Feb 6, 2014, 2:13 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Interesting looking ferry....

Never seen one of those before.
     
     
  #3696  
Old Posted Feb 6, 2014, 2:39 AM
franktko's Avatar
franktko franktko is offline
Registered User
 
Join Date: Mar 2013
Location: Montréal
Posts: 1,297
Can it fly??
     
     
  #3697  
Old Posted Feb 6, 2014, 3:31 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,259
Update from the City of Ottawa on LRT tunnel construction.

Quote:
Things continue to move forward on time and on budget for the Confederation Line light rail transit (LRT) project! Chewrocka, Crocodile Rouge and Jawbreaker, the three excavators carving out the LRT tunnel, have now completed 10% of the job. Check out the map below to track their progress on the 2.5 kilometre tunnel.



At the West Portal in LeBreton Flats, Jawbreaker has carved out 228 metres of tunnel and is currently digging under Queen Street just west of Bay Street.



At the East Portal near uOttawa and Laurier Avenue East, Crocodile Rouge has mined 22 metres towards Rideau Street.



Mining at the Central Shaft near Queen and Kent streets by the machine called Chewrocka has just begun over the last two weeks with 7 metres of the gallery that will lead from the construction shaft to the tunnel excavated to date.

     
     
  #3698  
Old Posted Feb 6, 2014, 8:17 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
How long is that tunnel, looks serious?

When is that LRT going to be finished?
     
     
  #3699  
Old Posted Feb 6, 2014, 2:49 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,821
^ The downtown tunnel is 3.2km. The whole LRT line is supposed to be finished in done/functional in 2017.
     
     
  #3700  
Old Posted Feb 6, 2014, 5:46 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Cold Weather Testing for New Streetcar



Peter Kuitenbrouwer: Toronto’s sexy, shiny new streetcars get a ‘real-world’ test in less-than-ideal snowy conditions

Imagine our shock when we saw, sliding down Bathurst Street southbound, a huge, new, fat shiny red streetcar, taunting us with a sign on its door and on its digital display: “Not in service.”

Walking 15 more blocks, I arrived at city hall (streetcars finally caught up with us at McCaul, and passed us at University). I called Brad Ross, the TTC spokesman, about the shiny streetcar sighting.

“We want to see how it functions in the snow,” he says, explaining that we saw a “test vehicle.” “This is real-world conditions.

“The testing is going really well. We are going to have our first production vehicle in March.”

I decided not to whine about my own particular commute. The poor man has enough on his plate.

“We are closing the SRT [Scarborough Rapid Transit] line to clear the tracks, switches and power rail in anticipation of evening rush hour,” he said. “The SRT has never liked the snow.”

On the subways, the TTC is running “storm trains” which spray a de-icing agent on the third rail. “It gets covered with snow and ice,” Mr. Ross explained.

Meanwhile in these conditions the TTC also deploys six “storm streetcars,” which don’t pick up passengers, but carry a special shoe on the trolley pole, “which acts as a cutter or slider,” he explains, to clear the wires of ice and snow. The storm streetcars also clear snow and ice from the switches on the streetcar tracks.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 7:08 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.