HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


Reply

 
Thread Tools Display Modes
     
     
  #341  
Old Posted Jun 15, 2010, 2:55 PM
premeet01245 premeet01245 is offline
BANNED
 
Join Date: May 2010
Posts: 3
Quote:
Originally Posted by NYC4Life View Post
Memorial & Museum



The World Trade Center (WTC) Memorial design, Reflecting Absence, will consist of two voids on the footprints of the original Twin Towers. Surrounded by a landscaped plaza filled with oak trees, each void will feature rings of cascading water falling into illuminated reflecting pools. The names of the 2,979 who perished in the September 11th attacks in New York City, Washington, DC; and Pennsylvania and the February 1993 WTC bombing will be inscribed around the edge of the memorial waterfalls.

Reflecting Absence was created by architect Michael Arad and landscape architect Peter Walker and selected from a design competition that drew more than 5,200 entrants from 63 nations.

Complementing the memorial, a state-of-the art museum designed by Davis Brody Bond will offer visitors an opportunity to deepen their experience at the site. Accessed through an entry pavilion designed by Snøhetta, the National September 11 Memorial & Museum will help facilitate an encounter with both the enormity of the loss and the triumph of the human spirit that are at the heart of 9/11. Visitors also will be able to view a section of the massive slurry wall that held back the Hudson River during the attacks.

Construction to build the National September 11 Memorial & Museum began in March 2006.


The National September 11 Memorial & Museum

The National September 11 Memorial & Museum, formerly known as the World Trade Center Memorial Foundation, is the not-for-profit corporation that began operations in 2005 to realize the memorial quadrant at the WTC site. As owner of the memorial and museum, the Foundation is responsible for capital and annual fundraising, finalizing and maintaining the integrity of project design, programming of the memorial and museum, and ongoing operations.

To date, the foundation has raised more than $300 million towards its $350 million fundraising goal to support capital and planning costs and start an endowment. The foundation has received more than 33,800 contributions from all 50 states and 25 countries. The foundation is receiving $250 million from the Lower Manhattan Development Corporation (LMDC). To contribute to the construction of the memorial, please click here.



Transportation Hub



With its spectacular soaring design, the new World Trade Center (WTC) Port Authority Trans-Hudson (PATH) Transportation Hub promises not only to bring architectural beauty to downtown Manhattan but also to significantly improve mass-transit connections throughout the region. Designed by celebrated architect Santiago Calatrava, the transportation hub will feature pedestrian concourses to existing and future transportation services. Construction on the project began in September 2005, and according the Port Authority, it will be operational by 2011.

Located close to the northeast corner of the WTC site at Church and Fulton Streets (between Towers 2 and 3), the transportation hub is designed to accommodate 250,000 pedestrians per day - which corresponds to projected ridership numbers for 2025. (The temporary station can accommodate up to 50,000 daily pedestrians.) The transportation hub's innovative design features retractable 150-foot-high, glass-and-steel "wings" that will allow natural light to pass through to the rail platforms 60 feet below street level.

The new WTC Transportation Hub will include

A multi-story central transit hall designed in the style of Grand Central Terminal, incorporating a lower concourse, an upper (balcony) concourse, a public waiting area, and first-class retail amenities.

Enhanced permanent PATH facilities and services incorporating three full-service extended 10-car platforms, as well as an additional platform to accommodate service needs and five tracks.

An integrated network of underground pedestrian connections from the lower and upper concourses, which will lead to adjoining New York City Transit subway stations and the proposed MTA Fulton Street Transit Center through the Dey Street Corridor. Pedestrians also will be able to access locations on and around the WTC site, including the five WTC office towers, the Memorial and Museum, Hudson River ferry terminals, the World Financial Center, PATH trains, 13 subway lines, and the proposed JFK rail link.

Retail facilities of approximately 200,000 square feet within the transit hub and the pedestrian concourses to accommodate a wide variety of restaurants and stores.

The Port Authority of New York and New Jersey, in cooperation with the U.S. Department of Transportation through the Federal Transit Administration (FTA), is building the 800,000-square-foot hub. The FTA has committed approximately $1.92 billion toward the more than $2 billion project, with the Port Authority investing the difference. The full-service, regional transportation hub will replace the temporary WTC PATH station currently in place. A slurry wall currently being built around the PATH station will provide the foundation for the transportation hub's below-grade levels.

In 2003, the Port Authority opened its first temporary entrance to restore service to the WTC site. In June 2007, a second temporary entrance opened on Church Street, replacing the initial entrance. This entrance will be in place until early 2008, when it in turn will be replaced by a third temporary entrance on Vesey Street near West Broadway. The shifting of the entrances allows the Port Authority to maintain consistent service to the WTC site during construction of the permanent transportation hub's main, ground-level structure.
I wanna touch it.
Reply With Quote
     
     
  #342  
Old Posted Jun 15, 2010, 7:03 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,983
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #343  
Old Posted Jun 18, 2010, 10:36 PM
J.M.'s Avatar
J.M. J.M. is offline
Registered User
 
Join Date: May 2008
Location: Nova Scotia
Posts: 174
Wow, the progress here is amazing. Here's a link to something relevant to the memorial that i've not seen here yet. http://www.cgpartnersllc.com/project...morial-museum/
Reply With Quote
     
     
  #344  
Old Posted Jun 21, 2010, 10:48 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,983
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #345  
Old Posted Jun 22, 2010, 4:43 PM
NYC4Life's Avatar
NYC4Life NYC4Life is offline
The Time To Build Is Now
 
Join Date: May 2008
Location: Bronx, NYC
Posts: 3,004
Amazing progress. Only a matter of time before we see waterfalls on those shots.
__________________
"I want to wake up in the city that never sleeps"
Reply With Quote
     
     
  #346  
Old Posted Jun 22, 2010, 9:09 PM
laro3 laro3 is offline
Registered User
 
Join Date: Oct 2006
Posts: 108
cioa tutti i have a question about ground zero,i recieved an email today saying that they were going to build a mosque near ground zero.is this true??????
Reply With Quote
     
     
  #347  
Old Posted Jun 22, 2010, 9:36 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
It's about 3 blocks north and it's already a Mosque, they wana build a bigger one. This is a non-issue.

Thanks for posting those great pics NYGuy. One can really get a good sense of just how HUGE the 18000 is. Lots of progress, lots of activity.

"This is great !" - - Animal House
Reply With Quote
     
     
  #348  
Old Posted Jun 23, 2010, 4:10 PM
nycdagreatest's Avatar
nycdagreatest nycdagreatest is offline
Danny proud New Yorker
 
Join Date: Feb 2010
Location: astoria,ny
Posts: 327
__________________
you always learns something new in NYC
Reply With Quote
     
     
  #349  
Old Posted Jun 23, 2010, 6:18 PM
trvlr70 trvlr70 is offline
Registered User
 
Join Date: Dec 2004
Location: usa
Posts: 2,245
All of this progress makes me so happy. I finally love it when no "earth" is left exposed.
Reply With Quote
     
     
  #350  
Old Posted Jun 23, 2010, 7:33 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,983
http://www.nj.com/news/index.ssf/201..._86m_cont.html

Port Authority awards $86M contract in World Trade Center construction project

Tuesday, June 22, 2010
Steve Strunsky

Quote:
The Port Authority took its first concrete step toward construction of Santiago Calatrava’s dramatic World Trade Center PATH and subway hub today, awarding an $86 million contract to a Long Island firm to provide the structure’s concrete floor slabs, beams and walls.

Sorbara Construction Corp. of Lynbrook, N.Y., will furnish the sculpted components of the renowned Spanish architect’s soaring Transit Hall. Officials have hailed the planned station not only as a transportation hub, but as another compelling architectural component of the redeveloped World Trade Center site, along with the sunken waterfalls of the National September 11 Memorial and the crystalline 1,776-foot skyscraper known as WTC 1, formerly the Freedom Tower.

Sorbara’s past projects include the AOL Time Warner Center at Columbus Circle and 7 World Trade Center, a 52-story office tower completed in 2006.

The contract represents only a small portion of the $3.2 billion cost of the Trade Center transit hub, which is intended to serve 250,000 PATH and subway riders every day.

Sorbara’s was among more than $100 million in Trade Center-related contracts awarded by the Port Authority of New York and New Jersey yesterday. The agency’s board also approved a $19 million deal with EIC Associates of Springfield to build the foundations for the Transit Hall and the site’s Oculus plaza.

In a related deal, the board also approved an agreement under which New York City will reimburse the Port Authority for the $44 million cost of foundation and infrastructure work on a performing arts center at the Trade Center site.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #351  
Old Posted Jun 25, 2010, 4:20 PM
JACKinBeantown's Avatar
JACKinBeantown JACKinBeantown is offline
JACKinBeantown
 
Join Date: Jun 2003
Location: Location: Location: Location:
Posts: 9,032
There's cement pouring equipment near the memorial/museum/whatever it's called.

http://www.earthcam.com/clients/grou...groundZero.swf

UPDATE: OK, false alarm. They seem to be pouring down by the tracks between Tower 4 and the south pool.

Last edited by JACKinBeantown; Jun 25, 2010 at 4:40 PM.
Reply With Quote
     
     
  #352  
Old Posted Jun 25, 2010, 7:23 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,983
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #353  
Old Posted Jun 25, 2010, 8:20 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,917
its nice to see some "exterior cladding" on the site (stuff that you'll see when its finshed)
Reply With Quote
     
     
  #354  
Old Posted Jun 28, 2010, 9:00 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,983
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #355  
Old Posted Jun 28, 2010, 9:43 PM
Dac150's Avatar
Dac150 Dac150 is offline
World Machine
 
Join Date: Sep 2006
Location: NY/CT
Posts: 6,749
Nice to see them keeping busy down there.
__________________
"I'm going there, but I like it here wherever it is.."
Reply With Quote
     
     
  #356  
Old Posted Jun 28, 2010, 10:12 PM
SkyscrapersOfNewYork's Avatar
SkyscrapersOfNewYork SkyscrapersOfNewYork is offline
Moderator
 
Join Date: Sep 2009
Location: New York City
Posts: 2,523
when should we expect to see trees?
Reply With Quote
     
     
  #357  
Old Posted Jun 28, 2010, 10:31 PM
upNaway upNaway is offline
Registered User
 
Join Date: Apr 2010
Posts: 71
if you check earth cam it looks like tyhey have cleared half of the northpool of materials
__________________
R.I.P. Kurt Cobain 1967-1994
Reply With Quote
     
     
  #358  
Old Posted Jun 29, 2010, 12:31 AM
J.M.'s Avatar
J.M. J.M. is offline
Registered User
 
Join Date: May 2008
Location: Nova Scotia
Posts: 174
Quote:
Originally Posted by NYguy View Post
That shot is amazing, to think I kept zooming by it.
Reply With Quote
     
     
  #359  
Old Posted Jun 29, 2010, 10:08 PM
BStyles BStyles is offline
Registered User
 
Join Date: Jul 2009
Posts: 557
Damn...could you imagine if the towers were anything but square?

What if they were in the shape of David Stars? Now there's something to think about.
Reply With Quote
     
     
  #360  
Old Posted Jun 29, 2010, 11:11 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
just a pool of mushy goo
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 11,198
Quote:
Originally Posted by NYguy View Post

Is it me or does it seem like the stone batches weren't "shuffled" or randomized very well, as you see a dramatic border between shades at two different spots on the wall in this picture? Is there something they can do later on to make it less obvious? Some sort of acid wash or something?
__________________
Everything new is old again

Trumpism is the road to ruin
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 7:13 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.