Quote:
Originally Posted by Marcu
Has any in their official capacity at the CTA ever mentioned anything about connection the Brown like to Blue at Jefferson Park? Or is that just something people on this forum have came up with.
|
As far as I know, it actually has been in the long term capital plans of the regional planning agencies for some time (e.g. decades), but obviously there has been zero progress in terms of any land acquisition, design/engineering, etc.
Something to remember is that
none of these projects advance solely on technical merits; they advance at the behest and pleasure of various levels of politicians, particularly congressmen, the mayor, and USDOT appointed bureaucrats. Kruesi's years at US DOT and tight relationship with the mayor were crucial in getting the Ravenswood and Douglas branches rebuilt with New Start money, for example, which is supposedly money for building new transit services (I guess the Douglas was construed as a "New Start" because the baseline would have been the line being mothballed, and Ravenswood was a "New Start" because of additional capacity).
Red Line south extension is a Jesse Jr project, for example. Brown extension to Blue would be a Rahm Emmanuel project. Airport Express and Circle Line were Daley projects.
As for projects that advance on technical merits but without a clear and consistent political "owner," like the Second Avenue Subway... well, we all know the timeline on that one.
Quote:
Originally Posted by Mr Downtown
It's even dubious how much it would actually speed trips for existing riders. A single transfer downtown is almost always faster than two transfers at 1600W.
|
Bullseye. Studies show that the transfer penalty is worth 5-15 minutes of in-vehicle travel time, depending on a rider's other trip characteristics. The number of people who would actually see travel time reductions that negate the transfer penalty would be very small. Eliminating slow zones, increasing frequency, and reducing station dwell times would be a more cost-effective way of shortening travel times.