No. 31 Condos | 137m | 37s | Lanterra | Arquitectonica - pre-construction

Westdale Properties and Lanterra are partnering on this handsome design from Arquitectonica and reported yesterday they expect a late-spring construction start
(the site has now largely been cleared).


UT

Ivy Condos | 102.5m | 32s | Dream | RAW Design - site prep/shoring


UT
Site prep from a few weeks ago.

wuyani0806

Waterworks Building Redevelopment | 47.55m | 13s | MOD Developments | Diamond Schmitt - u/c

Condo, institutional and retail (some residential floors are now being occupied).

kozak

kozak

kozak

St Lawrence Condos at 158 Front | 91.5m | 26s | Cityzen | aA - u/c


Rascacielo

25 Mabelle | 159m | 49s | BDP Quadrangle - pre-construction

This nice infill project for Etobicoke was appealed to LPAT by the proponent due to the lack of a decision by the city (the hearing is now underway).

UT

UT

Humber Bay towers.

gregv


Jasonzed
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #2  
Old Posted Apr 21, 2021, 6:48 PM
C. C. is offline
Registered User
 
Join Date: Jan 2014
Posts: 3,163
All of these a great.




This is a gorgeous infill development, both the tower and base. I wonder why the city didn't make a decision?

One of the legal remedies I've seen in NJ and elsewhere is for planning board's that play politics in delaying a decision is that the development becomes automatically approved if the board fails to take action as required by law. No one wants that of course, but it creates a strong incentive for all parties to follow the rules. There is the occasional story of a planning board may delaying a decision on a mosque that is legally allowed to be built in a zone that allows places of worship. It reeks of discrimination and the courts have called it out. Other times it's affordable housing - where the development meets all the zoning standards and all that's needed is site plan approval.

With all the development going on in Toronto right now, it seems odd that this is the one where the city and/or planning board fails to make a decision within the statutory timeframes. What's the back story here?
Reply With Quote
     
     
  #3  
Old Posted Apr 22, 2021, 3:04 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,731
The province gives the city 4 months to make a decision on an application then the developer has the ability to appeal it to planning court, which can choose to approve it without the city’s approval.

4 months is essentially an impossible timeline to meet for approvals. Absolutely no development gets council approval in that time.

Some developers just appeal as soon as they legally can as they figure it’s easier to get approvals in the courts than at council. Most don’t do that though, as it’s still typically slower and more expensive than council approval. Usually developers do it if the city planning department doesn’t approve of the application and is looking like they will be issuing a refusal recommendation to city council.

There are a dozen different “real” reasons a developer will appeal a project, but the technical legal reason is almost always “lack of decision”.
Reply With Quote
     
     
  #4  
Old Posted Apr 24, 2021, 12:02 AM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,926
Not sure where else to post this but the condominium project that'll practically hug the Bay building at Yonge n Bloor to the north is going ahead soonish it seems....this is the 85 metre, 25 floor tower proposed by Menkes, now called Adiago:
Along Yonge by Draulerin Photographics, on Flickr
__________________
"Living life on the edge"
Reply With Quote
     
     
  #5  
Old Posted Apr 24, 2021, 1:10 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
^^^ a few of the recent renders for "Adagio".

Adagio | 85m | 25s | Menkes | Giannone Petricone - pre-construction


UT

UT

UT

CIBC SQUARE | 241.5m | 50s | Hines | WilkinsonEyre - Phase 2 site prep/shoring

Large crane base installed on the rail corridor deck between Phase 1 and Phase 2 presumably to supplement an eventual tower crane(s).


sammmy

mburrrrr
Pretty sure a portion of Phase 2 cantilevers over the rail corridor.

UT

UT

2221 Yonge Condos | 193m | 58s | Tower Hill | Pei Partnership - u/c

Centre of photo (behind the crane).

AlbertC

UT

The Taylor | 121m | 36s | Tricon | Diamond Schmitt - u/c


Red Mars

UT

Crane traffic jam at The Well.


Red Mars

Red Mars

Scala | 61.5m | 18s | Tridel | Wallman Architects - u/c

From a few weeks ago.

Edward Skira

UT

steveve

Canary Commons | 42m | 12s | DundeeKilmer | aA - u/c


Rascacielo
Tower crane coming down last month.

globalexpress

462 Wellington West | 63m | 17s | Verve | Giannone Petricone - pre-construction

Retail, office, and retirement residential.

UT

UT

UT

1354 Queen Street West | 37m | 9s | KingSett Capital | Giannone Petricone - pre-construction


UT

400 King West | 157m | 49s | Plaza | BDP Quadrangle - pre-construction


UT

UT

Early spring.

Jasonzed
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #6  
Old Posted Apr 24, 2021, 1:27 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Suburban Vaughn

First Vaughan Block | 56s, 52s - SmartCentres - Hariri Pontarini - pre-construction

Includes 1070 residential units.

sche

sche

sche
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #7  
Old Posted Apr 24, 2021, 3:17 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
199 Church | 124.5m | 39s | CentreCourt | IBI Group - demolition

Condo, office and retail (heritage facade retention).

UT

bilked

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #8  
Old Posted Apr 25, 2021, 3:08 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
The One | 338.5m | 94s | Mizrahi Developments | Foster + Partners - u/c

The yellow crane recently dismantled, is now being reassembled (with a climbing section added?).

Benito

The Gloucester on Yonge | 148m | 44s | Concord Adex | aA - u/c

Centre of pic with Teahouse 501 Yonge on the right (u/c @ 171m, 52s and 88m, 25s).

Benito

CIBC SQUARE | 241.5m | 50s | Hines | WilkinsonEyre - site prep/shoring for Phase 2

Crane assembly on top of the deck between the 2 phases.

sammmy

Allandale25

299 Campbell Avenue | 47.24m | 14s | TAS | Teeple Architects - u/c

Rental, retail and public library.

UT
u/c on the right.

ProjectEnd

UT

yyzfa

PJ Condos | 157m | 48s | Pinnacle | Hariri Pontarini - u/c


ProjectEnd
Right side of pic

Dreamcondo
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #9  
Old Posted Apr 26, 2021, 8:52 AM
Julie J Kile Julie J Kile is offline
Registered User
 
Join Date: Apr 2021
Posts: 3
Quote:
Originally Posted by Maldive View Post
The One | 338.5m | 94s | Mizrahi Developments | Foster + Partners - u/c

The yellow crane recently dismantled, is now being reassembled (with a climbing section added?).

Benito

The Gloucester on Yonge | 148m | 44s | Concord Adex | aA - u/c

Centre of pic with Teahouse 501 Yonge on the right (u/c @ 171m, 52s and 88m, 25s).

Benito

CIBC SQUARE | 241.5m | 50s | Hines | WilkinsonEyre - site prep/shoring for Phase 2

Crane assembly on top of the deck between the 2 phases.

sammmy

Allandale25

299 Campbell Avenue | 47.24m | 14s | TAS | Teeple Architects - u/c

Rental, retail and public library.

UT
u/c on the right.

ProjectEnd

UT

yyzfa

PJ Condos | 157m | 48s | Pinnacle | Hariri Pontarini - u/c


ProjectEnd
Right side of pic

Dreamcondo

Hello, this project seems to be worthwhile! I'm looking to buy a condo for my parents, is it a good idea to go for a pre-construction condo?
Reply With Quote
     
     
  #10  
Old Posted Apr 26, 2021, 3:27 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Hi Julie. Not sure which pre-construction condo you are referencing (there are hundreds in the pipeline) as my last post featured under construction projects.

I'm sure there are other forum members better-equipped to comment on the pros and cons of buying pre-construction, but I would suggest that the time-line for many new projects to move through the city approval process to sales to construction (usually triggered by about 70% of firm sales) to occupancy and registration, has increased quite dramatically due to the 'avalanche' of new proposals (no doubt overwhelming city planners, construction suppliers etc.). While many predicted that the pandemic would stall pre-construction sales of residential units, the reverse seems to be true for 2020 and some are predicting an increase in pre-construction sales of 15% or more for 2021.

I guess it's not rocket science to suggest if you are looking for a 'move-in' condo for your parents in the next few years... you might check out some projects that are well-under construction already?
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #11  
Old Posted Apr 26, 2021, 3:46 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Eight Cumberland | 170m | 51s | Great Gulf | aA - u/c

bilked

UT

Y&S Condos | 121.3m | 35s | Tribute | Graziani + Corazza - u/c


bilked

UT

UT

Halo Residences on Yonge | 131m | 38s | QuadReal | architectsAlliance - u/c


bilked

UT

UT

EQ Bank Tower | 105.18m | 23s | First Gulf | Sweeny &Co - u/c


UT

condovo

UT

The Well | 174m | 46s | RioCan | Hariri Pontarini - u/c

(7 mixed-used buildings from 14s to 46s): 174m, 157.27m, 136.24 m, 81.38 m, 62.48 m, 62.48 m, 55.78 m)

Red Mars

Red Mars
Wellington Street mid-rises.

ProjectEnd

Left centre, the office component climbing in front of FCP.

kotsy

UT

Panda Condominiums | 107.59m | 30s | Lifetime | Turner Fleischer - u/c


bilked

UT

Concord Canada House | 234m, 203m | 69s, 59s | Concord Adex | IBI Group - u/c


Red Mars

UT

UT

QRC West Phase 2 (Queen Richmond Centre West) | 36m | 7s | Allied | Sweeny &Co - demolition/site-prep

Office and retail.

ProjectEnd

UT

AlbertC

Portland Commons | 73m | 15s | Carttera | Sweeny &Co - u/c


UT

ProjectEnd

karledice

336 Queen Street West | 15.85m | 4s | Pearl Group | Turner Fleischer - u/c


Red Mars

UT

Westport Condos | 22s | Edenshaw | IBI Group - u/c


Jasonzed

UT

Azura Condos | 108m | 32s | Capital Developments | IBI Group - u/c

Condo and townhouses in North York.

Edward Skira

Edward Skira

UT

Vaughn
Promenade Mall Revitalization | 35s | Liberty Development | WZMH - u/c

Multi-phase redevelopment including Hotel, Office, Public Space, Residential, Retail (Storeys 35, 30, 28, 28)

UT
First crane base(?)

ryanbruins17
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #12  
Old Posted Apr 26, 2021, 6:34 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
West Don Lands: Block 20 | 162.61m, 119m | 45s, 32s | Dream | Henning Larsen - site plan application (April 10, 2021)

Just east of the Distillery District (2 red towers on the left). A total of 654 residential units (196 will be provided as affordable housing units), 5000 sq foot community facility and 33,000 sq feet of retail uses.

DavidCappizano

DavidCappizano

DavidCappizano

DavidCappizano
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #13  
Old Posted Apr 27, 2021, 2:11 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Sugar Wharf Condominiums (Phase 1) | 230.11m | 70s | Menkes | aA - u/c

Given scores of projects now climbing above grade I guess tower crane operators = job security (fear of heights not an asset).

Jeff Morgan

310 Front West | 69s | H&R REIT | Hariri Pontarini - pre-construction

Rezoning application filed yesterday.

UT

50 Scollard | 147.62m | 41s | Lanterra | Foster + Partners, IBI Group - excavation/shoring

Some landscape images for the ‘other’ Foster design underway.

AlexBozikovic

AlexBozikovic

AlexBozikovic

Link

bilked

UT

Ontario Court of Justice Toronto | 96m | 17s | Infrastructure Ontario | Renzo Piano | u/c


NeilV
Winston Churchill (silhouetted) supervises construction progress.

condovo

55C: 55 Charles Condos | 159.4m | 48s | MOD Developments | architectsAlliance - u/c

574 condos and 100 rental units.

Benito

UT

St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour - u/c

Rebar galore awaits the big pour at grade.

condovo

UT

Stockyards District Residences | 35.66m | 10s | Marlin Spring | Graziani + Corazza - u/c


AlbertC
Future resident arrives to inspect construction progress (in stealth mode).

AlbertC

UT

Reunion Crossing | 11s | Diamond Kilmer | Giannone Petricone - u/c


AlbertC

UT

Junction House | 40.23m | 9s | Slate | superkül - u/c

AlbertC

UT

CIBC Square 1 sports an enormous spire (CN Tower).

Shot by droddick33.

ushahid
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #14  
Old Posted Apr 27, 2021, 2:32 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
2180 Yonge | 253.5m | 70s | Oxford Properties | Pelli Clarke Pelli - pre-construction

Office, Public Space, Residential and Retail including 5 towers @ 70, 60, 60, 55 and 45 storeys. Images from the master-plan presentation to the Design Review Panel including some new renders.


UT
Looking south down Yonge Street.

UT
Looking east.

UT

UT

UT

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #15  
Old Posted Apr 29, 2021, 2:40 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Harris Square | 50m | 13s | Urban Capital | Saucier + Perrotte - nearing completion


condovo

ProjectEnd

1718 Bayview | 31.48m | 9s | Gairloch | BDP Quadrangle - site plan approval application submitted


UT

UT

Artistry Condos | 103.5m | 29s | Tribute | Graziani + Corazza - pre-construction


Tribute
Nice southeast view of the core from Tribute’s website.

AlbertC

19 Duncan | 186.53m | 58s | Westbank | Hariri Pontarini - u/c

Nearly flush with the heritage facade retention (likely shot through a tinted window ;-).

mcornett

UT

Rascacielo

UT

Massey Tower Condos | 207m | 60s | MOD Developments | Hariri Pontarini - COMPLETE

Nice pic from the architects’ Insta.

Ushahid
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #16  
Old Posted Apr 29, 2021, 3:32 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
300 Queens Quay East | 53.2m | 11s | 3C Lakeshore | Adamson - pre-construction


UT
Roof terrace.

UT

UT

The office building above is part of the 3C* Waterfront Development with participation from a variety of international and domestic architecture firms including Foster + Partners. Plan includes office, residential, retail and public spaces.
*Cityzen, Castlepoint Numa and Continental Ventures

Early placeholder render of entire development.

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #17  
Old Posted May 1, 2021, 1:32 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
The One | 338.3m | 94s | Mizrahi Developments | Foster + Partners - u/c

Some great ‘inside’ construction pics provided by Mizrahi.

UT
UT

UT

UT

UT

UT

UT

UT

CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre - site prep/shoring

Up to 5 cranes will be used for the Phase 2 build.

skycandy

skycandy
Phase 1 Lobby

skycandy

skycandy

Exterior work/landscaping expected to be completed in a couple of months. The stairs will be clad in stone and feature LED lighting along the railings.

skycandy

skycandy

Pinnacle One Yonge | 312.5m | 95s | Pinnacle | Hariri Pontarini - u/c

Phase 2 excavation (SkyTower)

skycandy
Phase 1

skycandy

skycandy

49 Ontario Street | 127m | 36s | Dream | architectsAlliance - site plan approval application

Office, residential and retail in 3 buildings (36s, 29s and 12s).

UT

316 Campbell | 28s | Trolleybus - Giannone Petracone - pre-construction


YIMBY519

YIMBY519

2221 Yonge Condos | 192.62m | 58s | Tower Hill | Pei Partnership - u/c

Nice addition to the growing yonge/eglinton skyline (centre of pic).

steveve
Hoist finally coming down.

Davidackerman

Park Hyatt Renovation | 62.48m | 18s | Oxford Properties | KPMB - u/c

Wrapping up the renovations. In addition to revamped hotel suites, there are now 65 luxury rental units known as “Two Avenue Road” available for as little as $4275.00/month for a 1 bedroom ;-)

MoObserves

MoObserves

MoObserves
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #18  
Old Posted May 5, 2021, 3:14 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
310 Front West | 235.5m | 69s | H&R REIT | Hariri Pontarini - pre-construction

Residential, office and retail. First (new) image is from the submission documents:

UT

UT

UT

Included in the submission was a (planning rationale) placeholder for 320 Front Street @ 253m, 77 storeys.

ChesterCopperpot

Comparative heights for the neighbourhood west of the financial district include a dozen built, approved and proposed towers 200 metres or greater (209.5m to 312m).

Northern Light

75 on The Esplanade | 99.97m | 29s | Harhay | a—A - u/c


mburrrrr
From last month

Red Mars

212 King Street West | 311.8m | 79s | Dream Office | SHoP Architects - pre-construction

Rezoning application for this mixed-use supertall now filed and first appearance at the Design Review Panel tomorrow.

UT

UT

UT

Lower Don Lands Redevelopment | Waterfront Toronto

Second bridge on its way from Dartmouth, Nova Scotia.

TheRockRipper

Interchange42
First bridge delivered last summer.

globalexpress

254 King Street East | 106.98m | 32s | IBI Group - pre-construction

Mixed-use proposal back under review (original render below).

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #19  
Old Posted May 6, 2021, 1:31 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Aerial render by steveve looking north-east from Bloor/Yorkville on the left to the waterfront.


steveve

Emerging development clusters along Yonge Street north of Bloor: St. Clair Avenue, Davisville Avenue and the largest at Eglinton Avenue.


steveve
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #20  
Old Posted May 7, 2021, 2:50 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,061
Pinnacle One Yonge | 312.5m | 95s | Pinnacle | Hariri Pontarini - u/c

Phase 1 rising in the distance, to the left of the financial district. Supertall SkyTower will rise just right of Phase 1.

Rascacielo

skycandy

Below is a recent drone shot from Jasonzed, a beloved contributor to the UrbanToronto forum who sadly passed away this week. His more than 7000 photo posts of Toronto and Mississauga development is an unmatched body of work and he will be greatly missed.

Jasonzed

The Forest Hill Condominiums | 48.16m | 14s | CentreCourt | BDP Quadrangle - site shoring


UT

ProjectEnd
With direct connections to the new Crosstown LRT along Eglinton Avenue.

UT

20 Maitland | 144.69m | 45s | Plaza | BDP Quadrangle - approved this week


UT
Condo and retail.

UT

11 YV | 212.44m | 62s | Metropia | Sweeny &Co - u/c


skycandy

UT

Benito

UT

The Well | 174.03m | 46s | RioCan | Hariri Pontarini - u/c


Johnny Au

Johnny Au
https://urbantoronto.ca/forum/attachments/img_0354-jpg.317544/
Johnny Au

Red Mars

Red Mars

Red Mars

UT

Forest Hill Private Residences | 36.77m | 9s | Altree | Graziani + Corazza - site demolition


UT
Located on St Clair Avenue.

UT

290 Old Weston Road | 98.55m | 29s | i-Squared | TACT Architecture - pre-construction


UT

UT

York University/Seneca College: Markham Centre Campus | 56.08m | 13s | York University | Diamond Schmitt - u/c


UT

StealthyArrow

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 11:38 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.