Quote:
Originally Posted by faxri
I assume that they will have to close off stations as they did downtown? Is there a schedule (ie when they are planning to start) out yet for the other stations? I tried to look around but I couldnt find anything.
|
Stations will likely need to close, but only for short periods (measured in weeks versus months or years) for many. Many of the NE stations and Canyon Meadows already have the footings in place for the platform extension, as they were built when the station was originally, and many others have ample room to just build off the end of the platform. Some will need to have minor rail changes (possible moving/removing switches, etc). So much of the work needed will be off the existing platform. The closures will be mostly for fixing up the existing station itself (repainting, concrete repair, etc) and then a short bit for tieing things in before opening. Other stations though will need more the months long closures depending on the setup, and some others will be build new-close old, open new- demolish old if they need to be shifted.