Quote:
Originally Posted by Skyguy_7
That opening is most likely there for hoisting and delivering material to those below-ground floors.
|
There is much space for hoisting at the Park Ave side (the large open pit).
And this hole is quite close to the crane tower, which is not the most logical spot to hoist.
My guess is that a construction elevator will be installed at the location of that hole.
The position seems quite right: just along the scaffolding of the floor which is now under construction.