At the end of the day I'm just ecstatic that these truly unique buildings will break ground any day now, it's going to be an absolute game changer for our skyline.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #282  
Old Posted Sep 27, 2023, 4:57 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,608
Quote:
Originally Posted by Harley613 View Post
At the end of the day I'm just ecstatic that these truly unique buildings will break ground any day now, it's going to be an absolute game changer for our skyline.
For sure. I think I most excited about this project over any other, even Relevé.

Still disappointed with the lack of integration with Pimisi and the library though.
Reply With Quote
     
     
  #283  
Old Posted Sep 27, 2023, 5:27 PM
OTSkyline OTSkyline is online now
Registered User
 
Join Date: Jun 2012
Posts: 2,607
Excited to see it rise next to the library and the Claridge project, all within a stone's throw away. The Claridge tower is already looking really tall since there's not much else in the area, will be interesting to see the Dream tower since the tallest is about 5 stories taller than Claridge one.
Reply With Quote
     
     
  #284  
Old Posted Sep 27, 2023, 5:29 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,486
Quote:
Originally Posted by OTSkyline View Post
Excited to see it rise next to the library and the Claridge project, all within a stone's throw away. The Claridge tower is already looking really tall since there's not much else in the area, will be interesting to see the Dream tower since the tallest is about 5 stories taller than Claridge one.
With the elevation difference its going look more like 7-8 stories taller than Claridge
Reply With Quote
     
     
  #285  
Old Posted Oct 26, 2023, 6:03 PM
RogueNacho RogueNacho is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 267
So is there any hope left of this project breaking ground this year?
Reply With Quote
     
     
  #286  
Old Posted Oct 26, 2023, 6:28 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,608
Quote:
Originally Posted by RogueNacho View Post
So is there any hope left of this project breaking ground this year?
In an article on the previous page, it says "in the next 6 months", so I'm not expecting any movement until the Spring, unfortunately.
Reply With Quote
     
     
  #287  
Old Posted Oct 27, 2023, 2:21 AM
Dzingle Bells Dzingle Bells is offline
Registered User
 
Join Date: Feb 2019
Posts: 158
Quote:
Originally Posted by RogueNacho View Post
So is there any hope left of this project breaking ground this year?
keep an eye on March
Reply With Quote
     
     
  #288  
Old Posted Oct 27, 2023, 3:33 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,720
Quote:
Originally Posted by J.OT13 View Post
In an article on the previous page, it says "in the next 6 months", so I'm not expecting any movement until the Spring, unfortunately.
Honestly a good thing. Between the Claridge project, the library, the road alignment my, and Releve, the whole stretch is a total gong show right now. I was in a traffic jam of cement trucks for 20 minutes heading East through the area mid day today.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #289  
Old Posted Oct 31, 2023, 7:24 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 346
Additional Geotechnical work is being carried out today. A bore hole rig is on site. There are several new orange stakes spread out. I inspected 4 of them. Typical marking was BH 23-5 at top and 62.53 at the base being the bore hole No. and elevation in meters. I saw at least 4 more stakes plus the location they were already drilling. So at least 9 more bore holes being sampled.
Reply With Quote
     
     
  #290  
Old Posted Oct 31, 2023, 11:37 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,486
Quote:
Originally Posted by Marcus CLS View Post
Additional Geotechnical work is being carried out today. A bore hole rig is on site. There are several new orange stakes spread out. I inspected 4 of them. Typical marking was BH 23-5 at top and 62.53 at the base being the bore hole No. and elevation in meters. I saw at least 4 more stakes plus the location they were already drilling. So at least 9 more bore holes being sampled.
Well I guess that's some kind of a start
Reply With Quote
     
     
  #291  
Old Posted Dec 1, 2023, 9:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,608
Changed the name to "Dream LeBreton". That seems to be the official moniker when searching online.
Reply With Quote
     
     
  #292  
Old Posted Dec 1, 2023, 10:58 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 319
This Project has hit a few roadblocks along the way, but apparently it will be moving ahead in the spring of 2024 if all goes well.
Reply With Quote
     
     
  #293  
Old Posted Feb 14, 2024, 9:13 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 346
The site plan control documents are no longer on dev apps so I presume this is now approved. The site is still subject to some sort of comprehensive official plan amendment which covers multiple locations.
Reply With Quote
     
     
  #294  
Old Posted Feb 15, 2024, 9:21 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 319
Quote:
Originally Posted by Marcus CLS View Post
The site plan control documents are no longer on dev apps so I presume this is now approved. The site is still subject to some sort of comprehensive official plan amendment which covers multiple locations.
It is approved with the target of starting excavation in mid-spring of this year.
Reply With Quote
     
     
  #295  
Old Posted Feb 16, 2024, 1:37 AM
originalmuffins originalmuffins is online now
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 875
Okay this and the 400 Albert both starting in Spring is HUGE news.
Reply With Quote
     
     
  #296  
Old Posted Feb 16, 2024, 1:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,608
Quote:
Originally Posted by BlueJay View Post
It is approved with the target of starting excavation in mid-spring of this year.
Can't wait for this one to go up. After seeing the impact of Claridge East Flats, we know these two will have even more of a positive effect on the skyline. And red too! It will introduce a completely new colour palette to the skyline*!

Zibi Ottawa's red palette isn't so much part of the skyline. Interesting that Dream is continuing that red theme off the islands though.
Reply With Quote
     
     
  #297  
Old Posted Feb 23, 2024, 7:08 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,486
Hopefully that means we are one step closer to construction starting!

Reply With Quote
     
     
  #298  
Old Posted Feb 23, 2024, 7:15 PM
originalmuffins originalmuffins is online now
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 875
This Dream project is exactly more of what we need in our city. I really REALLY cannot wait to see these beauts go up.
Reply With Quote
     
     
  #299  
Old Posted Feb 23, 2024, 9:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,608
This and Relevé + Marriott Renaissance will have the greatest impact on the traditional skyline since probably Place de Ville Phase II.

I'm most excited about the colour! Bring on the colour!!
Reply With Quote
     
     
  #300  
Old Posted Feb 23, 2024, 9:17 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,720
Quote:
Originally Posted by J.OT13 View Post
This and Relevé + Marriott Renaissance will have the greatest impact on the traditional skyline since probably Place de Ville Phase II.

I'm most excited about the colour! Bring on the colour!!
Yep, you can see the impact on my 3d model on Skyrise Ottawa!

https://ottawa.skyrisecities.com/for...2/post-2055253
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 8:55 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.