Quote:
Originally Posted by lrt's friend View Post
Stations that don't get built as part of the original construction usually never get built. They never rise to the top of the priority list.
When Toronto built the northern section of the Yonge subway in the 1970s (from Eglinton to Finch) they originally planned for 6 stations in between Eglinton and Finch; at Lawrence, Glencairn, York Mills, Glen Echo, Sheppard, and Empress. However, someone calculated that downsizing the plan to 3 stations and retaining a local bus paralleling it for access from intermediate points was cheaper. So Glencairn, Glen Echo, and Empress stations were removed from the plan, but they decided to rough them in for future construction. The Empress station was eventually opened 15 years later (named North York Centre station) but the other two have never happened.
Reply With Quote
     
     
  #282  
Old Posted Nov 7, 2017, 6:44 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,842
It seems to me part of the problem here is that the stations are too elaborate (and therefore too expensive). Surely they could find some money for some bare-bones stations.
Reply With Quote
     
     
  #283  
Old Posted Nov 7, 2017, 7:19 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Ottawa does have a track record of adding infill stations: Bayview and Dominion on the Transitway, and Gladstone and Walkley soon to come on the O-Train.

The Canada Line in Vancouver has two planned-for future stations, and given the land rush and rapid development going on along the Cambie Corridor, I would expect those to become a reality at some point in the not so distant future. Unfortunately Jasmine Cres lacks that same pressure from developers/speculators.
Reply With Quote
     
     
  #284  
Old Posted Nov 7, 2017, 8:25 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Acajack View Post
Is there any way that ramp could be repurposed into a new onramp for regular traffic going eastbound on the 174 from Blair?
An interesting idea. It would mean crossing both the LRT line and the 174 off ramp, so I don't know if it would be worth the cost.
Reply With Quote
     
     
  #285  
Old Posted Nov 7, 2017, 9:14 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
When will Phase 2 construction begin? How soon after Phase 1 opens?
Reply With Quote
     
     
  #286  
Old Posted Nov 7, 2017, 9:21 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by lrt's friend View Post
When will Phase 2 construction begin? How soon after Phase 1 opens?
It's in tendering right now. I presume whoever wins the contract will decide when construction starts.
Reply With Quote
     
     
  #287  
Old Posted Nov 7, 2017, 10:30 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,818
Quote:
Originally Posted by 1overcosc View Post
They did confirm that the alignment revisions still protect for a Gloucester High School station in the future. Gloucester High School, Orleans Town Centre, and Tenth Line are the 3 stations that are being protected for in the future, but not being built as part of the initial line.
That is ridiculous! Three suburban stations within 1.5 kilometers. That is closer spacing than downtown. IMO, they should drop Orleans Boulevard in favour of Jasmine Crescent and Tenth Line. Orleans Town Centre would be well served equal distance between Place d'Orleans and Tenth Line (just as the new arena will be well served between high volume Bayview and Pimisi).

Quote:
Originally Posted by acottawa View Post
It seems to me part of the problem here is that the stations are too elaborate (and therefore too expensive). Surely they could find some money for some bare-bones stations.
I'm hoping that Jeanne d'Arc, Orleans Boulevard and Montreal will be bear bones while Place d'Orleans and Trim could be more in line with phase 1 since they will be high volume transfer stations. Same in the west, where money could be saved on Iris and Queensview.

Quote:
Originally Posted by McC View Post
Ottawa does have a track record of adding infill stations: Bayview and Dominion on the Transitway, and Gladstone and Walkley soon to come on the O-Train.

The Canada Line in Vancouver has two planned-for future stations, and given the land rush and rapid development going on along the Cambie Corridor, I would expect those to become a reality at some point in the not so distant future. Unfortunately Jasmine Cres lacks that same pressure from developers/speculators.
Canada Line is nearing capacity as is and they didn't leave much room for expansion (40 meters to 50 meters ), so I doubt they will add any stations.
Reply With Quote
     
     
  #288  
Old Posted Nov 7, 2017, 10:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,818
What's even more ridiculous is that some freakin' field west of Moodie where minor events are held once in a while will probably get a "special events" station.
Reply With Quote
     
     
  #289  
Old Posted Nov 8, 2017, 12:38 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
Quote:
Originally Posted by J.OT13 View Post
What's even more ridiculous is that some freakin' field west of Moodie where minor events are held once in a while will probably get a "special events" station.
for 25 passengers a year and every train will have to stop there.
Reply With Quote
     
     
  #290  
Old Posted Nov 8, 2017, 1:05 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by lrt's friend View Post
for 25 passengers a year and every train will have to stop there.
Last time I heard, the idea for that station was to have it closed except when events are running. Either way, a really silly idea.
Reply With Quote
     
     
  #291  
Old Posted Nov 8, 2017, 3:39 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Acajack View Post
Is there any way that ramp could be repurposed into a new onramp for regular traffic going eastbound on the 174 from Blair?
Good Day....

Highly doubtful.... virtually all of the BRT transitway west of the BRT flyover, into Blair station, will be reused for the LRT guideway. The flyover would be an orphan 'bridge to nowhere'.
Reply With Quote
     
     
  #292  
Old Posted Nov 8, 2017, 3:47 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Multi-modal View Post
... Where are they going to build Gloucester High School Station?..... or in the median adjacent to Jasmine Crescent.

.......
As far as I read the plans (acknowledged as ever-changing, ever-flexible), the station protection is for 'Jasmine Station' east of the LRT transition into the median, east of the High School. The flyover is opposite the oval, and the 'station' is beside Sutton Pl. parking/road, between the two triangle towers. And yes, correct, that does mean a ped overpass to get to it. <yippee><snort> I agree - we'll never see it !
Reply With Quote
     
     
  #293  
Old Posted Nov 8, 2017, 4:16 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by 1overcosc View Post
Last time I heard, the idea for that station was to have it closed except when events are running. Either way, a really silly idea.
The two best options in my mind are to protect for a station (with side platforms to not increase cost) and never built it or better yet drop the ridiculous idea all together.

I guess a third acceptable option would be to have Wesley Clover fully pay for the station and close it except during events, though the first two options are better.
Reply With Quote
     
     
  #294  
Old Posted Nov 8, 2017, 1:05 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
Too bad there's no station near Jasmine Crescent.
And the Montreal station is at an inconvenient location.
Reply With Quote
     
     
  #295  
Old Posted Nov 8, 2017, 2:18 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,842
Why all the Wesley Clover haters?

It isn't my thing (I think I have been there once) but that sort of rural attraction is exactly the kind of thing many visitors to Ottawa would dig. What's wrong with making it available by transit when the transit line goes right through the park anyway?
Reply With Quote
     
     
  #296  
Old Posted Nov 8, 2017, 2:49 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by acottawa View Post
Why all the Wesley Clover haters?

It isn't my thing (I think I have been there once) but that sort of rural attraction is exactly the kind of thing many visitors to Ottawa would dig. What's wrong with making it available by transit when the transit line goes right through the park anyway?

If it's a special events station, and is really just a bus shelter and a platform like the old O-Train stations I also say why not. I would imagine it would have no ticket gates, just staff and some presto readers for the occasions when it's in use.
Reply With Quote
     
     
  #297  
Old Posted Nov 8, 2017, 2:53 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by PHrenetic View Post
As far as I read the plans (acknowledged as ever-changing, ever-flexible), the station protection is for 'Jasmine Station' east of the LRT transition into the median, east of the High School. The flyover is opposite the oval, and the 'station' is beside Sutton Pl. parking/road, between the two triangle towers. And yes, correct, that does mean a ped overpass to get to it. <yippee><snort> I agree - we'll never see it !
Interesting. Your description of the location of the flyover matches what is shown in geoottawa.



The issues I see with this station location are:
  • The median is very narrow here and I don't even think there would be room for a centre platform, which could potentially be narrower than two side platforms. As a result they will likely plan for two side platforms and not move the highway when they build the station (ya right).
  • The highway starts to curve east of the flyover. It is highly desirable for stations to be on a straight section of track to allow a smaller gap between platform and train.

They could put it just west of the flyover with paths to Jasmine, Gloucester High School and the Wave Pool. Side platforms would likely be necessary as it looks like they are planning for a third centre track for trains to layover there.
Reply With Quote
     
     
  #298  
Old Posted Nov 8, 2017, 4:35 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by acottawa View Post
Why all the Wesley Clover haters?
I have nothing against Wesley Clover. I just don't want the city to pay lots of money for a fancy station that would see fewer riders in a year than Jasmine would see in a day.

Quote:
Originally Posted by kmcamp View Post
If it's a special events station, and is really just a bus shelter and a platform like the old O-Train stations I also say why not. I would imagine it would have no ticket gates, just staff and some presto readers for the occasions when it's in use.
Unless they only have a platform on one side of the tracks, they would also need to build an overpass (they won't want people cutting across the tracks). My fear is there will be feature creep and what starts as a modest station grows to become a full fledged, all singing and dancing station. Next thing you know, a few people who want to go there once or twice a week petition the city to have all trains stop at the station (using the argument that there isn't a bus).

IMHO, for the few events that are held there a year, a shuttle bus to Moodie and Eagleson would be a better option.
Reply With Quote
     
     
  #299  
Old Posted Nov 8, 2017, 4:55 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,842
Quote:
Originally Posted by roger1818 View Post
I have nothing against Wesley Clover. I just don't want the city to pay lots of money for a fancy station that would see fewer riders in a year than Jasmine would see in a day.



Unless they only have a platform on one side of the tracks, they would also need to build an overpass (they won't want people cutting across the tracks). My fear is there will be feature creep and what starts as a modest station grows to become a full fledged, all singing and dancing station. Next thing you know, a few people who want to go there once or twice a week petition the city to have all trains stop at the station (using the argument that there isn't a bus).

IMHO, for the few events that are held there a year, a shuttle bus to Moodie and Eagleson would be a better option.
I agree that it should be a lower priority than Jasmine and I agree that there is no need to build a fancy station and there is a risk of mission creep. Although I would not see its primary benefit as a special events station but as a station to serve the park itself (the campground, sports fields, etc.) A huge number of the attractions in the Ottawa area are car-only (or primarily car-only).
Reply With Quote
     
     
  #300  
Old Posted Nov 8, 2017, 5:50 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
I find this conversation ironic. We are talking about building a station that will seldom be used while not building a station that will be used all the time. Shakes head in amazement.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.