  #281  
Old Posted Apr 28, 2020, 11:16 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,955
That ledge seems to have disappeared or now has dirt hiding the edge.

Webcam pic today.
You can see boreholes for shoring columns.


https://app.oxblue.com/open/bk/1090wpenderst
Reply With Quote
     
     
  #282  
Old Posted May 6, 2020, 11:28 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,767
Graham Construction Twitter update:



Shore piles installed

https://twitter.com/GrahamBuilds/sta...93110162264067
Reply With Quote
     
     
  #283  
Old Posted May 7, 2020, 1:04 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,955
Thanks, and I see a bit of a lip for the tunnel roof.
Reply With Quote
     
     
  #284  
Old Posted Jun 30, 2020, 3:22 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,955
Reply With Quote
     
     
  #285  
Old Posted Jul 16, 2020, 11:53 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,767
Edit nevermind the concrete being lowered wasn't related to a crane install.
Reply With Quote
     
     
  #286  
Old Posted Jul 17, 2020, 4:12 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,112
That concrete would appear to be isolating the Dunsmuir Tunnel from the rest of the excavation.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
  #287  
Old Posted Jul 17, 2020, 4:22 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,767
Quote:
Originally Posted by Alex Mackinnon View Post
That concrete would appear to be isolating the Dunsmuir Tunnel from the rest of the excavation.
I figured out what happened. It looks like the flatbed was unloading concrete pads onto the street for that heavy crane to use for it's outriggers. They dropped in that green boom lift into the pit.
Reply With Quote
     
     
  #288  
Old Posted Jul 18, 2020, 6:58 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Late last week.

Reply With Quote
     
     
  #289  
Old Posted Jul 18, 2020, 7:24 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,955
Nice, thanks.
Reply With Quote
     
     
  #290  
Old Posted Jul 23, 2020, 2:10 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,767
The green boom lift got pulled out yesterday.
Reply With Quote
     
     
  #291  
Old Posted Sep 1, 2020, 9:26 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,593
Aug.31 '20, my pics


Reply With Quote
     
     
  #292  
Old Posted Sep 1, 2020, 11:19 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 8,907
A "task" of this building (or rather, the architects, MCM) is to tie the area together, design-wise. The neighbouring buildings are rather heterogeneous in colour, size, and form.
This one has bluish glass to pull in certain neighbouring buildings, and I think the curved façade will really "clinch it," adding a sleeker feel to the 'hood.
Reply With Quote
     
     
  #293  
Old Posted Sep 3, 2020, 7:39 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,365
does anyone know if they had to do anything unique/special to deal with the CPR Tunnel underneath the corner of the property?

i just remember there being issues with the Canada-Line @ W 12th and was curious about this one since part of the CPR Tunnel goes under this building.
Reply With Quote
     
     
  #294  
Old Posted Sep 3, 2020, 8:02 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,767
It's the triangle in the corner. It doesn't look like they did anything except work around it and not anchor into it. They put some piling next to it as well.
Reply With Quote
     
     
  #295  
Old Posted Sep 15, 2020, 4:08 AM
kiwi4life kiwi4life is offline
Registered User
 
Join Date: Jun 2009
Location: saskatoon
Posts: 536
the crane going up for this tower is going up late October.. red Wolf Luffer.. this will also be a post tension cable jobs.. with massive perimeter beams that are radius and get wider and deeper each floor going up .. then tapering back down near the top.. formwork and concrete work staring in the next little while.
Reply With Quote
     
     
  #296  
Old Posted Sep 15, 2020, 5:14 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,955
Cool, thanks for the info.
I wonder if they somehow leave an area where internal staircases can be retrofitted at a later time?
Multi-floor tenants often have internal staircases and it strikes me that post-tension cabling would prevent that
unless it was designed in during construction (and tenants change and renovate over time).
Reply With Quote
     
     
  #297  
Old Posted Sep 15, 2020, 6:25 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,365
Quote:
Originally Posted by officedweller View Post
I wonder if they somehow leave an area where internal staircases can be retrofitted at a later time?
i am quite sure they will. and probably leave space for 1 future staircase on the north side, and 1 on the south side of some of the floors.
Reply With Quote
     
     
  #298  
Old Posted Sep 15, 2020, 6:42 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,955
Cool, thanks.
Reply With Quote
     
     
  #299  
Old Posted Oct 28, 2020, 2:09 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 10,767
Quote:
Originally Posted by kiwi4life View Post
the crane going up for this tower is going up late October.. red Wolf Luffer.. this will also be a post tension cable jobs.. with massive perimeter beams that are radius and get wider and deeper each floor going up .. then tapering back down near the top.. formwork and concrete work staring in the next little while.
I guess they're a little behind schedule? Seems like they are 4-5 floors down at the deeper end of the pit?

http://b6vancouver.com/live-updates
Reply With Quote
     
     
  #300  
Old Posted Oct 28, 2020, 4:31 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,593
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 11:18 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.