Quote:
Originally Posted by intrepidDesign
Any word on the express lines going from the airports to B37?
|
Nope. Once the Blue Line is operating at 70mph, there are two key benefits gained in re: airport access:
1. Reduced travel time
2. Reduced vehicle requirement to meet current scheduled headway, ergo opportunity to increase service frequency and reduce over-crowding
Both contribute to making the "existing" service viable as an Airport service; ditto for improving Loop signaling and increasing fleet size to increase frequency on the Orange Line for that line's rush hour overcrowding.
Then there's the whole downtown supertation, which unlike the last failed attempt at a downtown Airport superstation (now known colloquial as "the 203 N. LaSalle entrance to the Clark/Lake station"***), can't be easily used for regular service. Hmm.
re: service to Midway, I've timed the trip from Adams/Wabash to Midway at 20 minutes flat. That needs no improvement. There are two primary concerns:
1) peak period crowding, particularly departing in the PM rush, 2) integration of the Midway rail station with the airport terminal. 1) can be solved with moderately increased frequency, 2) is trickier...probably entails more moving walkways.
***Some may remember the "Loop Transportation Center" building as basically what B37 promised to be, but even a little more pumped up towards transportation given the large parking garage and rental car facility. Baggage check-in, ticketing, one seat ride to the airport.... perhaps that project could have been finished for ~$200 million rather than a new subway tunnel that doesn't have the benefit of being usable for normal service in the meantime? All a hypothetical now, of course...