HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    Salesforce East in the SkyscraperPage Database

Building Data Page   • San Francisco Skyscraper Diagram

Map Location
San Francisco Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #261  
Old Posted Feb 15, 2014, 9:22 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,679
Cool. They wrapped those steel columns seen in post #252 with concrete instead of some cheap material such as stucco.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #262  
Old Posted Feb 16, 2014, 1:05 AM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,653
I noticed that the building is 100% leased. It also says future home of Sales Force. Are they the major tenant or does someone else hold that title?
     
     
  #263  
Old Posted Feb 16, 2014, 1:18 AM
peanut gallery's Avatar
peanut gallery peanut gallery is offline
Only Mostly Dead
 
Join Date: Apr 2007
Location: Marin
Posts: 5,233
^Salesforce is leasing the entire building.

Quote:
Originally Posted by fimiak View Post
This is going to be the best lobby in the city so it will take time.
I'm with you, it's going to be an amazing lobby.

It just struck me that all of the core we are seeing now will remain open to the lobby (although covered with the video screen) as seen in this rendering:

__________________
My other car is a Dakota Creek Advanced Multihull Design.

Tiburon Miami 1 Miami 2 Ye Olde San Francisco SF: Canyons, waterfront... SF: South FiDi SF: South Park
     
     
  #264  
Old Posted Feb 19, 2014, 7:20 AM
mt_climber13 mt_climber13 is offline
Registered User
 
Join Date: Jan 2012
Location: San Diego
Posts: 1,287
The rendering on the first post shows a type of woven, textured glass facade, like a big basket. But the rendering above showing the lobby just looks like a regular boring glass box.
     
     
  #265  
Old Posted Feb 20, 2014, 6:13 PM
ElDuderino's Avatar
ElDuderino ElDuderino is offline
Droppin' Loads
 
Join Date: Nov 2010
Location: Ventura, Santa Rosa, California
Posts: 288
Quote:
Originally Posted by wakamesalad View Post
The rendering on the first post shows a type of woven, textured glass facade, like a big basket. But the rendering above showing the lobby just looks like a regular boring glass box.
That rendering does show the "woven" facade. It's difficult to see because you can only see one floor of glass, but look closely at the left side. It's a very suttle effect, but it should look great in person.
     
     
  #266  
Old Posted Feb 21, 2014, 1:03 AM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
Green Berniecrat
 
Join Date: Oct 2006
Location: Richmond/Eureka, CA
Posts: 1,689
It looks like the entire project has been halted after the accident involving two injured workers and fallen scaffolding. Apparently they fell about 40 feet. Their injuries are significant, but I sincerely hope they're both ok.

Link:
http://www.sfgate.com/bayarea/articl...-2-5253348.php
__________________
Reject the lesser evil and fight for the greater good like our lives depend on it, because they do!
-- Dr. Jill Stein, 2016 Green Party Presidential Candidate

Last edited by Reminiscence; Feb 21, 2014 at 1:04 AM. Reason: Add link
     
     
  #267  
Old Posted Feb 26, 2014, 6:13 AM
minesweeper minesweeper is offline
Registered User
 
Join Date: Jul 2011
Location: San Francisco
Posts: 613
Thankfully it sounds like both workers will be okay. And, the construction site re-opened today:

Quote:
One of the carpenters has since been released from the hospital while the other is still hospitalized but is expected to make a full recovery, according to Webcor Builders president Jes Pedersen.

The California Division of Occupational Safety and Health investigated the site Friday and gave the green light for work to continue today on the 27-story building, which is adjacent to the new Transbay Transit Center also under construction.
http://www.sfexaminer.com/sanfrancis...nt?oid=2713689
     
     
  #268  
Old Posted Feb 26, 2014, 8:56 AM
a very long weekend's Avatar
a very long weekend a very long weekend is offline
dazzle me
 
Join Date: Jan 2014
Location: 94109
Posts: 824
uh, i think they mean 30 story building, which is still far too short considering the rareness of the height limit on the site
     
     
  #269  
Old Posted Feb 26, 2014, 7:41 PM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 968
Reporters...they don't know the details like we do :p


I just noticed for the first time that the corner of Fremont & Mission is going to be completely open to the outside. The doors will be retracted. A nice little detail that will really open up the lobby.
__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
     
     
  #270  
Old Posted Mar 1, 2014, 3:10 AM
peanut gallery's Avatar
peanut gallery peanut gallery is offline
Only Mostly Dead
 
Join Date: Apr 2007
Location: Marin
Posts: 5,233
Thought I'd add some photos since I haven't contributed any in a long time. Hasn't really changed much but it's a slightly different angle.

__________________
My other car is a Dakota Creek Advanced Multihull Design.

Tiburon Miami 1 Miami 2 Ye Olde San Francisco SF: Canyons, waterfront... SF: South FiDi SF: South Park
     
     
  #271  
Old Posted Mar 8, 2014, 2:58 AM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
Green Berniecrat
 
Join Date: Oct 2006
Location: Richmond/Eureka, CA
Posts: 1,689
Back to work

Today 3.7.14:

__________________
Reject the lesser evil and fight for the greater good like our lives depend on it, because they do!
-- Dr. Jill Stein, 2016 Green Party Presidential Candidate
     
     
  #272  
Old Posted Mar 12, 2014, 3:02 AM
minesweeper minesweeper is offline
Registered User
 
Join Date: Jul 2011
Location: San Francisco
Posts: 613
3/11/2014

Scaffolding going back up around the core:



     
     
  #273  
Old Posted Mar 14, 2014, 7:01 PM
hruski hruski is offline
Registered User
 
Join Date: Aug 2010
Posts: 165
What happened to the webcam for this project? Would be really interesting to see it progress, now that the lobby is all but done.

350mission.com/tour/webcam
     
     
  #274  
Old Posted Mar 14, 2014, 7:57 PM
rocketman_95046's Avatar
rocketman_95046 rocketman_95046 is offline
Registered User
 
Join Date: Aug 2002
Location: SD/SJ, CA, USA
Posts: 1,879
Quote:
Originally Posted by hruski View Post
What happened to the webcam for this project? Would be really interesting to see it progress, now that the lobby is all but done.

350mission.com/tour/webcam
They turned it off the day of the scaffolding accident. The cam looked right down on the injured.
__________________
1,000 posts and still going...
     
     
  #275  
Old Posted Mar 14, 2014, 7:58 PM
rocketman_95046's Avatar
rocketman_95046 rocketman_95046 is offline
Registered User
 
Join Date: Aug 2002
Location: SD/SJ, CA, USA
Posts: 1,879
Quote:
Originally Posted by hruski View Post
What happened to the webcam for this project? Would be really interesting to see it progress, now that the lobby is all but done.

350mission.com/tour/webcam
They turned it off the day of the scaffolding accident. The cam looked right down on the injured.
__________________
1,000 posts and still going...
     
     
  #276  
Old Posted Mar 14, 2014, 8:07 PM
hruski hruski is offline
Registered User
 
Join Date: Aug 2010
Posts: 165
Quote:
Originally Posted by rocketman_95046 View Post
They turned it off the day of the scaffolding accident. The cam looked right down on the injured.
So why not turn it back on, now that the injured are expected to make a full recovery?

edit: they turned it on 3/19
www.350mission.com/tour/webcam

Last edited by hruski; Mar 21, 2014 at 9:57 PM.
     
     
  #277  
Old Posted Mar 21, 2014, 7:47 PM
a very long weekend's Avatar
a very long weekend a very long weekend is offline
dazzle me
 
Join Date: Jan 2014
Location: 94109
Posts: 824
walked by today, impressive how small the footprint on this one. still bummed it'll reach only the 30 stories
     
     
  #278  
Old Posted Mar 21, 2014, 8:49 PM
Dublin-San Francisco Dublin-San Francisco is offline
BANNED
 
Join Date: Mar 2014
Location: San Francisco, CA
Posts: 5
Quote:
Originally Posted by peanut gallery View Post
^Salesforce is leasing the entire building.



I'm with you, it's going to be an amazing lobby.

It just struck me that all of the core we are seeing now will remain open to the lobby (although covered with the video screen) as seen in this rendering:

Ah, love love love the base of this!
     
     
  #279  
Old Posted Mar 22, 2014, 12:21 AM
1977's Avatar
1977 1977 is offline
Registered User
 
Join Date: Nov 2009
Location: Bay Area
Posts: 996
delete

Last edited by 1977; Mar 22, 2014 at 12:29 AM. Reason: repeat post
     
     
  #280  
Old Posted Mar 27, 2014, 1:50 AM
simms3_redux's Avatar
simms3_redux simms3_redux is offline
She needs her space
 
Join Date: Sep 2005
Location: San Francisco
Posts: 2,454
I hope wakamesalad gets a photo of this one - scaffolding is all up for the 3rd floor pour. This one is starting to look like a building rather than a site.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 10:15 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.