Quote:
Originally Posted by jammer139
Surprisingly they still have not paved the parking lot of the new retail buildings at the entrance to River Bend as of yet. For some reason they appear to have stalled out finishing the 6s Strapka apartment building with zero progress installing the 6th floor precast floor slabs. They have been building the lower floor exterior steel stud walls thou. The 8s Candela condo building has been paused since they completed the ground floor slab at the end of the spring this year. Suspect Sifton hit the brakes on this condo building because of the financial markets. Eve Park is slowly getting the exterior siding installed on building 2.
|
Update on Spektra 6th floor and the reason for the stall. Is they redesign the floor to match the 5th floor unit layout. So it went from 8 units to 12. Which also changed the step in the building would have done with the lesser unit count.
Candela was completely redesigned, unit difference went from 10 units to 11, but this changed most of the previous unit configurations.