Quote:
Originally Posted by adamuptownsj
You'd have to build a pretty serious overpass over the rail yard to connect Horsman to St George, right? Even to get to DeLong you gotta cross a rail line underneath transmission lines... presumably you wouldn't want that crossing at grade.
|
There already is a plan to extend Horsman to Delong Drive as part of an expansion of the MID West Industrial Park.
This includes building an overpass over the CNR mainline . I believe work is going to commence on this next year.
I agree that creativity will be necessary to extend Horsman south to St. George, but, I imagine something can be worked out, probably including a second overpass, and perhaps a reconfiguration of the neck area of the hump yard.
The connection to St. George via Horsman is, in my opinion, necessary. Delong is a side street connecting to Edinburgh, and does not provide a direct enough route to downtown to act as a satisfactory diversion for traffic flow from the northwest end of the city. St. George however does go directly to the downtown.