A shot from queens and talbot.
Reply With Quote
     
     
  #242  
Old Posted Jul 12, 2022, 4:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
10th floor slab is now poured and the 10th floor walls and posts forming is starting for the south tower. With the 10th floor walls poured they will have reached the 25% of the 40s south tower height of residential floors milestone. The south tower will clear the middle base linking to the north tower once completed. Should see an external construction elevator installed soon for the south tower. Most likely side will be the south side along Fullerton with easy access for truck unloading. Alternatively they may install the elevator on the west side.
Reply With Quote
     
     
  #243  
Old Posted Jul 16, 2022, 1:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
They have poured the L3 floor slab now along the east wall of pit. Still forming L3 walls and posts along the west side of pit.
Reply With Quote
     
     
  #244  
Old Posted Jul 22, 2022, 2:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Most of the 10th floor walls and posts are now poured in the south tower with some forming for the 11th floor slab on the west side. Forming for the L2 floor slab along the NE wall of the pit progressing well. They have lifted out the excavator from the pit and work continues with the L3 walls and posts in the NW side of the pit. They have been taking away the construction trailers and cleaning up the Talbot St pedestrian scaffolding for some reason. Not clear if it is in preparation to use that space for future concrete delivery's or setup of external elevator for south tower.
Reply With Quote
     
     
  #245  
Old Posted Aug 6, 2022, 2:48 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Forming started for 11th floor walls and posts in the south tower. Have poured a section of L2 floor slab along the east side of pit. Still forming in the NE corner for the L2 floor slab. Making some progress on the L3 walls and posts along the west side of pit.
Reply With Quote
     
     
  #246  
Old Posted Aug 18, 2022, 11:37 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
11th floor walls and posts are now poured for the south tower and forming for the 12th floor slab is well under way. The south tower is now clear of the middle podium structure connecting it to the north tower.
Reply With Quote
     
     
  #247  
Old Posted Aug 23, 2022, 1:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
They have now poured some of the 12th floor slab on the west side of the south tower and have started setting up 12th floor wall forms. They are also now setting up the twin cab construction elevator on the south side along Fullerton St. Twin cabs make for much more efficient movement of workers and materials as it reduces the amount of time spent waiting for the elevator.
Reply With Quote
     
     
  #248  
Old Posted Sep 11, 2022, 12:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Forming now up for the 13th floor slab in the south tower. Have now poured the NE corner L2 floor slab and have nearly finished pouring the L2 walls and posts along the entire east side of pit. Forming is now going in for the L2 floor slab and ramp from the L3 to L2 level along the west side of pit.
Reply With Quote
     
     
  #249  
Old Posted Sep 14, 2022, 3:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Looks like another big concrete pour today with half a dozen concrete trucks on site. Hard to tell now that they have closed the sidewalks along Talbot St and Dufferin. Not sure why the Dufferin Ave portion needs to be closed?
Reply With Quote
     
     
  #250  
Old Posted Sep 15, 2022, 3:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Forming now going up for 13th floor walls on the south tower.
Reply With Quote
     
     
  #251  
Old Posted Sep 23, 2022, 8:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Forming for the 14th floor slab has started on the south tower. Forming for the L1 slab in the SE corner of pit has also started.
Reply With Quote
     
     
  #252  
Old Posted Sep 24, 2022, 11:04 PM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 37
Pics or it didn’t happen
Reply With Quote
     
     
  #253  
Old Posted Sep 29, 2022, 3:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Reply With Quote
     
     
  #254  
Old Posted Sep 29, 2022, 5:03 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,116
You can copy the photo directly into the forum by right-clicking it, copying the image address, and pasting it between the codes [IMG] [/IMG], or clicking the photo icon in the forum toolbar.

Reply With Quote
     
     
  #255  
Old Posted Sep 29, 2022, 10:55 PM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 37
Exciting to see progress on this project. Looking good.
Reply With Quote
     
     
  #256  
Old Posted Oct 5, 2022, 5:55 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,116
Photos by me from yesterday



Reply With Quote
     
     
  #257  
Old Posted Oct 5, 2022, 7:59 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,459
Thanks for sharing. I haven't been downtown much since the pandemic (I WFH now) and your first image is mighty impressive. It really shows the scale of this development quite well.
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #258  
Old Posted Oct 5, 2022, 9:33 PM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 37
Can’t wait for the glass to start being installed. Thx for the great pics.
Reply With Quote
     
     
  #259  
Old Posted Oct 6, 2022, 2:30 PM
MolsonExport's Avatar
MolsonExport MolsonExport is online now
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,145
Quote:
Originally Posted by johnnyhamont View Post
You can copy the photo directly into the forum by right-clicking it, copying the image address, and pasting it between the codes [IMG] [/IMG], or clicking the photo icon in the forum toolbar.

So great to see that the bombed-out war zone of wasteland parking Farhi lots is being diminished.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #260  
Old Posted Oct 6, 2022, 7:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Its worth noting that the photo clearly shows that the 10th floor has a taller floor height then the other floors so far. Wonder if this will be repeated for the 20th, 30th and 40th floors? The units on the 10th floor will enjoy taller ceiling heights.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 8:23 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.